Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine
Објеката
- Тип
- Рад у часопису
- Верзија рада
- објављена верзија
- Језик
- енглески
- Креатор
- Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović
- Извор
- Energies
- Издавач
- MDPI AG
- Датум издавања
- 2019
- Сажетак
- Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availability is an overall indicator and contains partial indicators that are oriented towards reliability, maintenance, and logistical support. Availability presents a variable value and changes in time and space. Usually, availability is shown as the coefficient of time use of the machine. This approach is not good enough because it does not go into the structure of the availability itself and requires a high level of IT support in system monitoring. In this sense, this paper will use the fuzzy theory and the corresponding analytic hierarchy process (AHP) multi-criteria analysis to present a conceptual and mathematical model for the assessment of availability based on expert judgment. The model will be shown in the case study (on the example) of bulldozers working in the open-pit lignite mine.
- том
- 12
- Број
- 21
- doi
- 10.3390/en12214044
- issn
- 1996-1073
- Subject
- raspoloživost, fazi teorija, AHP višekriterijumska analiza, eksperska ocena, buldozer
- availability, fuzzy theory, AHP multi-criteria analysis, expert judgment, bulldozer
- Шира категорија рада
- M20
- Ужа категорија рада
- М22
- Права
- Отворени приступ
- Лиценца
- Creative Commons – Attribution 4.0 International
- Формат
- Медија
- energies-12-04044.pdf
Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović. "Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine" in Energies, MDPI AG (2019). https://doi.org/10.3390/en12214044
This item was submitted on 7. децембар 2021. by [anonymous user] using the form “Рад у часопису” on the site “Радови”: http://drug.rgf.bg.ac.rs/s/repo
Click here to view the collected data.