Претрага
115 items
-
Fuzzy model of a multigrade structure for support of decision-making and management in mineral processing
Vujić Slobodan, Miljanović Igor, Benović Tomo, Milutinović Aleksandar, Petrovski Aleksandar, Josipović Pejović Milena (2011)Vujić Slobodan, Miljanović Igor, Benović Tomo, Milutinović Aleksandar, Petrovski Aleksandar, Josipović Pejović Milena. "Fuzzy model of a multigrade structure for support of decision-making and management in mineral processing" in Proceedings of the 35th APCOM Symposium, Wollongong, Australia - no. -, Wollongong, Australia:University of Wollongong, Australia (2011): 485-490. https://doi.org/-
-
Application of multiple-criteria decision making analysis in mine development planning
Sanja Bajić, Branko Gluščević, Dragoljub Bajić. "Application of multiple-criteria decision making analysis in mine development planning" in Proceedings of the 8th International Symposium “Mining and Environmental Protection - MEP 2021“, Soko banja, Serbia, September 22 - 25 2021, Belgrade : University of Belgrade, Faculty of Mining and Geology (2021)
-
Decision making process in the selection recultivation open pit mine and landfils
Димитријевић Бојан, Чебашек Владимир, Илић Саша, Мајсторовић Јелена, Јанковић Иван. "Decision making process in the selection recultivation open pit mine and landfils" in Proceedings of the VI International symposium on mining and environmental protection, Vrdnik, Serbia:University of Belgrade, Faculty of mining and geology, Belgrade Center for Environmental engneering, Mining Department, Belgrade, Serbia (2017): 211-213
-
Effectiveness Analysis of Different Bucket-wheel Excavators
Coal production in open-pit lignite mines in the Republic of Serbia is performed with continuous work systems. In addition to coal production, the same systems are used for the exploitation of large quantities of overburden. According to the reliability concept, continuous systems are in linear connection. If the failure occurs in one part of the system, that will produce a downtime of the entire system. The initial and most important factor of continuous systems is the bucket-wheel excavator. It ...Stevan Đenadić, Predrag Jovančić, Dragan Ignjatović, Miloš Tanasijević, Filip Miletić. "Effectiveness Analysis of Different Bucket-wheel Excavators" in 8th International Conference Mining and Environmental Protection, Sokobanja, 22-25 September 2021, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2021)
-
The preliminary selection of oil reservoir in Serbia for carbon dioxide injection and storage by a multicriteria decision-making approach: a case study
Lola Tomić, Vesna Karović Maričić, Dušan Danilović. "The preliminary selection of oil reservoir in Serbia for carbon dioxide injection and storage by a multicriteria decision-making approach: a case study" in Energy Sources, Part A: Recovery, Utilization, and Environmental Effects, Taylor & Francis (2021). https://doi.org/10.1080/15567036.2021.1936303
-
Multiple-Criteria Decision-Making in Mine Development Planning
Sanja Bajić (2023)The Borska Reka ore deposit is an experimental location where developed methodologies have been applied. It is the largest ore body within the Bor mining complex, which has been the subject of numerous studies and analyses for more than three decades. The paper focuses on the application of FAHP and the VIKOR method to address ranking of alternatives and select the optimal mining method by means of fuzzy multicriteria optimization.Sanja Bajić. "Multiple-Criteria Decision-Making in Mine Development Planning" in Proceedings of the 5th International Underground Excavations Symposium, 5-6-7 June 2023, Istanbul, Topkapi : Dinç Ofset Mat. Rek. San. ve Tic. Ltd. Şti. (2023)
-
A Novel Hybrid Fuzzy Multiple-Criteria Decision-Making Model for the Selection of the Most Suitable Land Reclamation Variant at Open-Pit Coal Mines
Bojan Dimitrijević, Tomislav Šubaranović, Željko Stević, Mohamed Kchaou, Faris Alqurashi, Marko Subotić (2024)рекултивацаиона решења, површинска експлоатација лежишта минералних сировина, животна средина, IMF SWARA, фази ROVBojan Dimitrijević, Tomislav Šubaranović, Željko Stević, Mohamed Kchaou, Faris Alqurashi, Marko Subotić. "A Novel Hybrid Fuzzy Multiple-Criteria Decision-Making Model for the Selection of the Most Suitable Land Reclamation Variant at Open-Pit Coal Mines" in Sustainability, MDPI AG (2024). https://doi.org/10.3390/su16114424
-
Eksploatacioni učinci ugljenih sistema na površinskom kopu Tamnava–Zapadno polje
U radu su analizirani eksploatacioni učinci ugljenih sistema na površinskom kopu Tamnava–Zapadno polje. Period analize je prvih šest meseci tekuće godine. Analiza je vršena sa aspekta ostvarene proizvodnje, kvaliteta uglja, efektivnog vremena rada, kapacitetnog i vremenskog iskoršćenja i zastoja sistema. Za poređenje podataka različitih parametara koji po svojoj prirodi nisu međusobno uporedivi, u radu su korišćene metode višekriterijumskog odlučivanja.Marko Lazić, Filip Miletić, Milena Lekić, Veljko Rupar, Željko Petrović, Lazar Žujović . "Eksploatacioni učinci ugljenih sistema na površinskom kopu Tamnava–Zapadno polje" in 10th International Conference Coal 2021, Jugoslovenski komitet za površinsku eksploataciju, Zlatibor (2021)
-
A multi-criteria approach for assessing the potential of renewable energy sources for electricity generation: Case Serbia
When assessing the potential of renewable energy alternatives for electricity generation, it is necessary to implement a multi-perspective approach that includes economic, technical, environmental, and socio-political criteria. For the evaluation of criteria and alternatives, the Fuzzy Analytical Hierarchy Process (FAHP) method is applied. The obtained weights are formed according to the values of energy indicators and expert judgments. The use of a fuzzy numerical value scale for the assessment of expert judgments and energy indicators provides a more sensitive ...Boban Pavlović, Dejan Ivezić, Marija Živković. "A multi-criteria approach for assessing the potential of renewable energy sources for electricity generation: Case Serbia" in Energy Reports, Elsevier BV (2021). https://doi.org/10.1016/j.egyr.2021.02.072
-
Одлучивање у случају диферентности пројектних рудничких решења упоредним једно и вишекритеријумским моделовањем
Жељко Праштало (2024)Рударски системи поседују читав низ својстава која их, на одређени начин, препоручују за примену савремених метода из домена операционих истраживања и системског инжењерства. У контексту одлучивања у рударству се, у светлу примене различитих метода као помоћних алата у процесу одлучивања, поставља питање квалитета решења. Експертско знање и расположивост и применљивост, као и познавање аналитичких алата представља једну димензију, док питање доношења одлуке у ситуацији диферентних решења представља другу. Која средства су доносиоцу одлука на располагању у таквој ситуацији, како ...оптимизација, линеарни локацијски модел, линеарно програмирање, вишекритеријумска анализа, експлоатација и потрошња кречњака, PROMETHEEЖељко Праштало. Одлучивање у случају диферентности пројектних рудничких решења упоредним једно и вишекритеријумским моделовањем, Београд : [Ж. Праштало], 2024
-
Faktori uticaja na izbor optimalnog sistema odbrane od podzemnih voda kod površinskih kopova
Dragoljub Bajić, Dušan Polomčić (2015)Dragoljub Bajić, Dušan Polomčić. "Faktori uticaja na izbor optimalnog sistema odbrane od podzemnih voda kod površinskih kopova" in VII Međunarodna konferencija Ugalj 2015, Zlatibor 14-17. oktobar 2015., Beograd : Jugoslovenski komitet za površinsku eksploataciju (2015)
-
Development of Integrated Fuzzy Model for Mine Management Optimization
Miodrag Čelebić, Sanja Bajić, Dragoljub Bajić, Dejan Stevanović, Duško Torbica, Vladimir Malbašić (2023)Technoeconomic, environmental and safety criteria generally affect the management of metallic and non-metallic mining operations. The first basic question that needs to be addressed when planning ore mining is which methods are adequate and what is the optimal mining technology? Due to the complex geologic framework of ore deposits, geological exploration has rendered synonymous the inherent uncertainties, vagueness, and inaccuracies. As a result, subjective evaluation by engineers and expert experience have become increasingly important. Given that the natural language ...Miodrag Čelebić, Sanja Bajić, Dragoljub Bajić, Dejan Stevanović, Duško Torbica, Vladimir Malbašić. "Development of Integrated Fuzzy Model for Mine Management Optimization" in Comptes rendus de l’Académie Bulgare des Sciences, Bulgarian Academy of Sciences (2023). https://doi.org/10.7546/CRABS.2023.09.12
-
Multivarijabilni modeli upravljanja u rudarstvu
Marjan M. Hudej (2014-02-03)osetljivost i rizik. Više pobuda generiše ovakvu atribuciju. Prva je, multivarijabilnostambijentalnih uslova i funkcionalna i strukturna složenost rudarskih sistema (čovek -priroda (radna sredina) - mašina – okruženje); Druga se odnosi na ne postojanje opštenaučne saglasnosti oko ocene pogodnosti modela za podršku odlučivanju i upravljanje.Treća, ako bi saglasnost i postojala, nije sigurno da bi raspoloživi modeli, metode i taktike,dale ekvivalentne rezultate za iste rudničke uslove. Četvrta, sistemske nauke još uveknemaju opšte prihvaćen i u praksi primenljiv algoritam izbora najboljeg rešenja ...Marjan M. Hudej. "Multivarijabilni modeli upravljanja u rudarstvu" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2014-02-03)
-
Multi-Criteria Fuzzy-Stochastic Diffusion Model of Groundwater Control System Selection
When considering data and parameters in hydrogeology, there are often questions of uncertainty, vagueness, and imprecision in terms of the quantity of spatial distribution. To overcome such problems, certain data may be subjectively expressed in the form of expert judgment, whereby a heuristic approach and the use of fuzzy logic are required. In this way, decision-making criteria relating to an optimal groundwater control system do not always have a numerical value. Groundwater control scenarios (alternatives) are identified through hydrodynamic ...expert judgment, linguistic variables, fuzzy dynamic TOPSIS, hydrogeology, groundwater control system, open-cast mine, geometric Brownian motionDušan Polomčić, Zoran Gligorić, Dragoljub Bajić, Miloš Gligorić, Milanka Negovanović. "Multi-Criteria Fuzzy-Stochastic Diffusion Model of Groundwater Control System Selection" in Symmetry, MDPI AG (2019). https://doi.org/10.3390/sym11050705
-
Побољшање ефикасности одлучивања у рударству применом линеарних оптимизационих модела
Трајче Бошевски (2021)Одлучивање и управљање у рударству је захтеван и сложен задатак изложен ризицима. Конвенционални-искуствени приступи доношења одлука, у пракси често показују слабост која се огледа у недовољној поузданости и прецизности. Предмет истраживања докторске дисертације, под називом „Побољшање ефикасности одлучивања у рударству применом линеарних оптимизационих модела“ је да, сагледавањем научних метода линеарног програмирања, приступи формирању локацијских модела који би били засновани на анализи и прилагођавању постојећих и увођењу нових претпоставки за случајеве као што је експлоатација и потрошња кречњака. У дисертацији ...Трајче Бошевски. Побољшање ефикасности одлучивања у рударству применом линеарних оптимизационих модела, [Т. Бошевски], 2021
-
Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine
Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović (2019)Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availability is an overall indicator and contains partial indicators that are oriented towards reliability, maintenance, and logistical support. Availability presents a variable value and changes in time and space. Usually, availability is shown as the ...Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović. "Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine" in Energies, MDPI AG (2019). https://doi.org/10.3390/en12214044
-
Definition of criteria and alternatives for choosing the optimal mining method deposits when applying multi – criteria optimization
Sanja Bajić, Dragoljub Bajić, Branko Gluščević, Radmila Gaćina, Josip Išek. "Definition of criteria and alternatives for choosing the optimal mining method deposits when applying multi – criteria optimization" in Underground mining engineering, University of Belgrade, Faculty of Mining and Geology (2024)
-
Application of the Fuzzy Model in the Evaluation and Selection of Hydraulic Excavators on Open-Pit Lignite Mine
Stevan Đenadić, Miloš Tanasijević, Vladimir Milisavljević, Dragan Ignjatović, Predrag Jovančić (2021)The production of lignite in large open-pit mines is mainly performed with continuously operating equipment, where bucket-wheel excavators, bucket-chain excavators, belt conveyors, and spreaders are the basic machines. Smaller machines, usually of discontinuous operating nature, are commonly categorized as auxiliary machines. This paper presents the research related to the analysis of auxiliary machine parameters with the case study for a hydraulic excavator. The purpose of the analysis was to develop a model of rating quality of service of the ...Stevan Đenadić, Miloš Tanasijević, Vladimir Milisavljević, Dragan Ignjatović, Predrag Jovančić. "Application of the Fuzzy Model in the Evaluation and Selection of Hydraulic Excavators on Open-Pit Lignite Mine" in SSRN Electronic Journal, Elsevier BV (2021). https://doi.org/10.2139/ssrn.3945617
-
An Approach to Management Decision Support: The Coal Mine Pljevlja Management Information System
In this paper we describe the approach that has been used in the development of the Management Information System (MIS) in the Coal Mine Pljevlja in Montenegro. The methodology of this approach was based on new information technologies and management techniques which have already been successfully applied in other related fields. Its main goal was to introduce modern management techniques to mining, adapted to specific features of the mining industry, its operations and environment, thus enabling the tactical management ...Božo Kolonja, Ranka Stanković, Filip Vuković, Ivan Obradović. "An Approach to Management Decision Support: The Coal Mine Pljevlja Management Information System" in Proceedings of the Fifteenth International Symposium on Mine Planning and Equipment Selection, Torino, Italy, September 2006, Vol. 1,, Balkema (2006)
-
Prioritization of strategic measures for strengthening the security of supply of the Serbian natural gas sector
To strengthen the security of supply of the Serbian gas sector, it is necessary to analyze the impact of planned strategic measures. The analysis involves the identification of the most influential threats to the security of natural gas supply and prioritization of the strategic measures for overcoming the consequences of threats. The proposed methodology is based on Fuzzy Analytic Hierarchy Process. The obtained weights for the identified threats and strategic measures are formed according to experts' judgments. The results ...Sigurnost snabdevanja, Donošenje odluka, Snabdevanje prirodnim gasom, Fazi AHP, Energetski indikatoriBoban Pavlović, Dejan Ivezić, Marija Živković. "Prioritization of strategic measures for strengthening the security of supply of the Serbian natural gas sector" in Energy Policy, Elsevier BV (2020). https://doi.org/10.1016/j.enpol.2020.111936