Estimation of the Remaining Life-Time of Power Transformers Depending on the Type of Loading
Snežana Aleksandrović, Vesna Damnjanović, Ilija Jeftenić. "Estimation of the Remaining Life-Time of Power Transformers Depending on the Type of Loading" in 9th International Conference Mining and Environmental Protection MEP 2023, 24. – 27. May 2023, Sokobanja, Belgrade : University of Belgrade, Faculty of Mining and Geology (2023)
-
Economic And Technical Aspects Of Transformer Operation
Aleksandrović Snežana, Jović Mihajlo (2016)Aleksandrović Snežana, Jović Mihajlo. "Economic And Technical Aspects Of Transformer Operation" in Energy Sources, Part B: Economics, Planning and Policy 11 no. 1, United Kingdom:Taylor & Francis (2016): 26-31. https://doi.org/10.1080/15567249.2011.567225
-
Transformer-Based Composite Language Models for Text Evaluation and Classification
Parallel natural language processing systems were previously successfully tested on the tasks of part-of-speech tagging and authorship attribution through mini-language modeling, for which they achieved significantly better results than independent methods in the cases of seven European languages. The aim of this paper is to present the advantages of using composite language models in the processing and evaluation of texts written in arbitrary highly inflective and morphology-rich natural language, particularly Serbian. A perplexity-based dataset, the main asset for the ...Mihailo Škorić, Miloš Utvić, Ranka Stanković. "Transformer-Based Composite Language Models for Text Evaluation and Classification" in Mathematics, MDPI AG (2023). https://doi.org/10.3390/math11224660
-
Efficiency and lifetime of medium voltage transformers
Snežana Aleksandrović, Vesna Damnjanović. "Efficiency and lifetime of medium voltage transformers" in XVI International Scientific – Professional Symposium, INFOTEH, Jahorina, 22. mart - 24. mart 2017., Istočno Sarajevo : Elektrotehnički fakultet, Univerzitet u Istočnom Sarajevu (2017)
-
Linear-motor plunger pump increases lifting efficiency
Bojan Martinović, Dušan Đekić, Dušan Danilović, Pavel Isaev. "Linear-motor plunger pump increases lifting efficiency" in Oil & Gas Journal (2022)
-
Available technological procedures for capturing CO2 in the industrial and power generation sectors
Climate change is a major environmental issue caused by anthropogenic emissions of greenhouse gases. Capturing CO2 and storing it in suitable geological formations is one of the main technological solutions that can provide mitigation of CO2 emission into the atmosphere. Capturing CO2 represents the first phase in process of carbon capture and storage, and includes the application of various technologies for the separation of CO2 produced in the energy and industrial sectors. There are four main systems for capturing ...... [16-17]. This technology has found application in oil refineries but it has limited use in power plants. For power generation, pre-combustion system can be combined with an integrated gasification combined cycle power plant (IGCC) [8]. Compared to post-combustion system, the gasification process is operated ...
... Review on Technologies for Reducing CO2 Emission from Coal Fired Power Plants. In: Thermal Power Plants. IntechOpen, 2012. doi: 10.5772/31876. Available online: A Review on Technologies for Reducing CO2 Emission from Coal Fired Power Plants | IntechOpen (accessed on 02 July 2021) 9. UKCCS Research ...
... industrial and power generation sectors Lola Tomić, Vesna Karović Maričić, Dušan Danilović, Branko Leković, Miroslav Crnogorac Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Available technological procedures for capturing CO2 in the industrial and power generation ...Lola Tomić, Vesna Karović Maričić, Dušan Danilović, Branko Leković, Miroslav Crnogorac. "Available technological procedures for capturing CO2 in the industrial and power generation sectors" in 8th International Conference Mining and Environmental Protection, 22 – 25th September 2021, Serbia, Univerzitet u Beogradu, Rudarsko-geološki fakultet (2021)
-
Projection of SO2 emissions in coal power plants in Serbia
Aleksandar Madžarević, Predrag Jovančić, Stevan Đenadić, Filip Miletić, Miodrag Ristović, Miroslav Crnogorac (2023)The production of electricity in the countries of South-Eastern Europe (SEE) was mainly related to the use of coal, predominantly lignite. The total installed capacity of thermal power plants using coal in these seven countries is 17.813 MW, distributed in 31 thermoblocks. The mentioned plants are the dominant pollutant emitters in all observed countries. Data on the largest emitters in the countries of the European Union and a comparison with SEE countries were collected. The calculation of emissions of ...... thermal power plants in Poland, while 57 are active in Germany. The installed capacity, structure of power plants and coal production are shown in Table 1 [1, 4, 10]. Table 1. Installed capacity, structure of power plants and coal production Production of coal (MO Country Capacity (MW) Power plants ...
... 6/17 The Southeast Europe is characterized with old coal power plants, 31 active 31 coal-fired thermal power plants with 17813 MW of installed capacity. The thermal energy capacities of the Republic of Serbia consist of six thermal power plants, with 17 active thermo-blocks, with a total installed ...
... Morava TPP: 120 MW. Figure 1. Region SEE with thermal power plant's locations 2. SOx EMISSION IN EUROPE AND SERBIA Tables 2 show thermal power plants in Europe that are the biggest emitters of SO>». Therefore, the coal- fired thermal power plants of the SEE region represent the biggest polluter ...Aleksandar Madžarević, Predrag Jovančić, Stevan Đenadić, Filip Miletić, Miodrag Ristović, Miroslav Crnogorac. "Projection of SO2 emissions in coal power plants in Serbia" in 9th International Conference Mining and environmental protection, Sokobanja 24-27th May 2023., Belgrade : University of Belgrade, Faculty of Mining and Geology (2023)
-
Coal cleaning before combustion – practice and experience in Serbia
Milena Kostović, Ivana Simović, Nebojša Kostović, Nina Pantelić. "Coal cleaning before combustion – practice and experience in Serbia" in Underground Mining Engineering, University of Belgrade, Faculty of Mining and Geology (2022)
-
Geoenvironmental Investigations at a Smelter Location in Bor (Serbia)
Petar Papić, Zvonimir Milijić, Jana Stojković, Jovana Milosavljević, Maja Todorović, Marina Ćuk, Željko Kamberović (2014)Petar Papić, Zvonimir Milijić, Jana Stojković, Jovana Milosavljević, Maja Todorović, Marina Ćuk, Željko Kamberović. "Geoenvironmental Investigations at a Smelter Location in Bor (Serbia)" in Challenges : Sustainable Land Management – Climate Change, Advances in Geoecology 43, Catena Verlag GMBH (2014)
-
Production of electricity from coal-fired power plants and accompanying CO2 emissions: comparison of EU-27 and US
Even in the third decade of the 21st century, large power plants are still responsible for more than half of the electricity production in Europe and US. They predominantly use fossil fuels in their work, which results in the emission of pollutants into the air, soil and water. In addition to the production of electric energy, fossil fuels, including coal, are used for industrial purposes. Although the use of coal, especially in the countries of the European Union, is ...... coal-fired thermal power plants, with 480 thermal units. The total installed capacity of these power plants is 111.606 MW [11, 12]. USA has 230 active coal- fired thermal power plants, with total installed capacity of 219.067 MW [5]. Figure 6 presents CO- emissions trend from coal-fired power plants in ...
... with an installed capacity of 649.819 MW. In the US, there are 18.3% of coal-fired power plants of the total installed capacity, and in the EU-27 there are 19.8% of coal-fired power plants of the total installed power [5]. The coal production in EU-27 and US in last three decade is shown in Figure ...
... from coal-fired power plants and accompanying CO2 emissions: comparison of EU-27 and US Uroš Djorgovski, Aleksandar Madžarević, Predrag Jovančić Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Production of electricity from coal-fired power plants and accompanying ...Uroš Djorgovski, Aleksandar Madžarević, Predrag Jovančić. "Production of electricity from coal-fired power plants and accompanying CO2 emissions: comparison of EU-27 and US" in International Conference on Global Energy and Climate Change - ICGRECC-23, New York, 2023, Research Galery- Science Leagues (2023)
-
Proizvodnja električne energije iz elektrana na ugalј i prateća emisija CO2: komparacija EU-27 i Srbije
Velike elektrane su i u trećoj deceniji 21. veka i dalјe odgovorne za više od polovine proizvodnje električne energije u Evropi. U svom radu pretežno koriste fosilna goriva, što rezultira emisijom zagađujućih materija u vazduh. Stoga, zahvalјujući direktivama EU, kao i poremećajima na tržištu, emisije uglјen-dioksida iz velikih postrojenja za sagorevanje u EU-27 intenzivno se smanjuju u poslednje dve decenije. Iako je upotreba uglјa, posebno u zemlјama Evropske unije, u stalnom padu, ima prostora za dodatno smanjenje. Autori su ...Aleksandar Madžarević, Predrag Jovančić, Stevan Đenadić, Filip Miletić, Miroslav Crnogorac. "Proizvodnja električne energije iz elektrana na ugalј i prateća emisija CO2: komparacija EU-27 i Srbije" in Energija, ekonomija, ekologija (2023). https://doi.org/10.46793/EEE23-2.44M
-
Identification of the Best Available Renewable Energy Source for Electricity Production in Serbia
Around 2/3 of electricity production in Serbia originates from coal-fired thermal power plants. The most significant domestic coal deposits are lignite deposits, a type of low -quality coal that causes negative health, climate and environmental impacts during the combustion. To reduce those negative impacts on domestic electricity production and to promote environmental awareness, the Serbian Energy Sector Development Strategy and the National Action Plan for Use of Renewable Energy Sources indicate the plan for increasing the share of ...Strategija obnovljive energije, Održiva energija, Proizvodnja električne energije, Solarna energija, Biomasa, Hidroenergije, Energija vetra... Repository is available at: www.dr.rgf.bg.ac.rs Abstract A r ound 2/3 of electricity production in Serbia originates from coal-fired thermal power plants. Th e m ost significant dom estic coal deposits are lignite deposits, a type of low -quality coal that ca uses negative h ealth, climate ...Boban Pavlović, Dejan Ivezić, Marija Živković. "Identification of the Best Available Renewable Energy Source for Electricity Production in Serbia" in Conference on Sustainable Development of Energy, Water and Environment Systems, Sarajevo, 28.6.-2.7.2020., Faculty of Mechanical Engineering and Naval Architecture, Zagreb (2020)
-
Analiza rada električnih centrifugalnih pumpi
Milica Stanojević (2024)Ovaj rad analizira rad električne centrifugalne pumpe (ESP) u naftnoj industriji, sa fokusom na problem taloženja kamenca (karbonatnih naslaga) unutar sistema. Električne centrifugalne pumpe (ESP) predstavljaju srce mnogih naftnih bušotina. Njihova visoka pouzdanost i sposobnost rada u zahtevnim uslovima čine ih neophodnim za stabilnu i kontinuiranu proizvodnju.Senzori igraju ključnu ulogu u praćenju rada ESP sistema i detekciji ranih znakova taloženja kamenca. Problem taloženja kamenca je izuzetno značajan, jer može dovesti do smanjenja efikasnosti pumpe, povećanja troškova održavanja, i dugoročnih zastoja ...... nafte dubinskim sisaljkama “, Zagreb: INA Industrija nafte d.d., Biblioteka INA. 5. APT POWER TECHNOLOGY, 2019. URL: https://www.xaapt.com/Products/Special-Transformers-&-Reactors/ESP- rectifier-transformer?id=126 6. Bartec, nd. URL: žhttps:/bartec.com/products-solutions/product- finder/pr ...Milica Stanojević . Analiza rada električnih centrifugalnih pumpi, 2024
-
Strategic Environmental Assessment in the Application of Preventive Protection for Wind Farm Noise—Case Study: Maestrale Ring Wind Farm
Determining the spatial position of wind turbines is the initial and most important phase in the development of a wind farm project. In this sensitive phase, all potential problems that may arise in the later stages of project development should be prevented by means of spatial and urban planning instruments. This makes it possible to achieve maximum use of the potential of wind in a particular space and, thus, fulfil the technical and economic requirements of the project while ...Energija,energetski inženjering i elektroenergetska tehnologija,obnovljivi izvori energije, održivost i životna sredina,električni i elektronski inženjering,kontrola i optimizacija,inženjering... a support to the planning process and an invaluable instrument for finding optimal spatial solutions for the possible key spatial impacts of wind power with regard to noise, shadow flicker, ornithofauna and chiropterofauna. The weakness of SEA can be seen in its predominant application of expert ...
... evaluation criteria. In the case of noise impact assessment from the planned Maestrale Ring wind farm, the criteria for evaluating the impact of wind power on noise (Table 2) were based on a combination of quantitative and qualitative criteria (semi-quantitative method) and a partial noise impact assessment ...
... after defining the initial positions of wind turbines based on wind poten- tial, their final position is harmonized with the results of partial wind power impact as- sessments, which has been elaborated in this paper in relation to noise. After these checks, based on the most unfavorable scenario, it ...Boško D. Josimović, Aleksandar Cvjetić, Božidar Manić. "Strategic Environmental Assessment in the Application of Preventive Protection for Wind Farm Noise—Case Study: Maestrale Ring Wind Farm" in Energies, MDPI AG (2021). https://doi.org/10.3390/en14196174
-
Mineral Resources of Serbia: Environmental, Societal and Economic Challenges
... hydroelectric power, Elektroprivreda Srbije, a state-owned electric utility power company, coordinates the work of 16 hydroelectric power plants, with total power of 2,835 MW, and with Đerdap and Drina-Lim hydropower plants being the most powerful. While the current hydroelectric power production ...
... and used for production of electrical equipment and devices that contained PCB-based oils and lubricants (transformers and condensers). The last transformer containing PCB-based fluid was produced in Serbia in 1986, while the last condenser was produced in 1988 (NIP Complimentary Contributor Copy ...
... Amonzg these 10 are the Steel factory in Smederevo, the Nikola Tesla A and B thermal power plants in Obrenovac, the non-ferrous metallurgy plant Zorka in Šabac, the Kostolac thermal power plant and the power cable factory in Jagodina. The Bor and Sjenica mines and the Kolubara open-pit mine discharge ...Vladimir Simić, Rade Jelenković, Dragana Životić. "Mineral Resources of Serbia: Environmental, Societal and Economic Challenges" in Serbia: Current Issues and Challenges in the Areas of Natural Resources, Agriculture and Environment,, Nova Science Publishers, Inc. (2019)
-
Споменица 1991. – 2015. година: 135 година геологије и 70 година рударства на Универзитету у Београду
... “Upravljanje kvalitetom i pouzdanošću DQM-2008”, Beograd, str. 302–307. ALEKSANDROVIĆ S., JOVIĆ M., 2011: Economic And Technical Aspects Of Transformer Operation. Energy Sources, Part B: Economics, Planning and Policy. ALEKSANDROVIĆ S., JOVIĆ M., 2011: Analysis of Belt Weigher Accuracy Limiting ...
... ŠTATKIĆ S., ALEKSANDROVIĆ S., JEFTENIĆ I., JEVTIĆ D., RISTIĆ L., 2015: Power Converters on Mining Ma- 4. СПИСАК ИЗАБРАНИХ НАУЧНИХ И СТРУЧНИХ РАДОВА НАСТАВНИКА И САРАДНИКА ФАКУЛТЕТА 377 chines. 18th International Symposium on Power electronics Ee2015, 28-30 October, Novi Sad, Serbia, Paper No. T1-3 ...
... 22, pp. 28–37, DOI: 10.1016/j.engfailanal.2012.01.001 JOVANČIĆ, P., ĆELOVIĆ, Š., IGNJATOVIĆ, D., MANESKI, Т., 2013: Redesigning components of power transmission according to numerical model and vibration diagnostics. Journal of Vibroengineering, Vol. 15 (3), pp. 1322–1329. JOVANČIĆ, P., KOLONJA ...главни и одговорни уредник Душан Поломчић. Споменица 1991. – 2015. година: 135 година геологије и 70 година рударства на Универзитету у Београду, Београд : Универзитет у Београду, Рударско-геолошки факултет, 2016