Претрага
611 items
-
Overwiew of In-Pit Crushing & Conveying Technology in Open Pit Mines
The conditions under which contemporary surface mining operations is carried out obviously becoming increasingly complex. In such complex conditions, the optimization of haulage systems as the technological phase with the largest share in the total operating costs, is very important from the aspect of achieving profitability of the mining project. In a large number of cases, the application of traditional haulage systems with trucks (as the most dominant type of haulage in open pit mines) does not lead to ...Ali Nasirinezhad, Dejan Stevanović, Dragan Ignjatović, Petar Marković. "Overwiew of In-Pit Crushing & Conveying Technology in Open Pit Mines" in 8th International Conference MIining And Environmental Protection, Sokobanja, 22-25 September 2021, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2021) М33
-
Failure Estimation of the Majdanpek Open Pit East Face Based on Inverse Velocity Model
The Majdanpek open pit mine south district is currently active mining prospect of copper ore exploitation in eastern Serbia. Its depth is approaching the termination depth and occurrences of large-scale instabilities and global instability of the final pit slope is possible. These can generate catastrophic mass movement inside an area that encloses a regional road route and the Pek River bed which is channelled along the outer contour of the pit. The displacements that were noted in early 2023, in the ...Miloš Marjanović, Stefan Milanović, Nikola Simić, Lazar Kričak. "Failure Estimation of the Majdanpek Open Pit East Face Based on Inverse Velocity Model" in Regional Symposium on Landslides in the Adriatic-Balkan Region, Belgrade, 15-18th May 2024, University of Belgrade, Faculty of Mining and Geology (2024). https://doi.org/10.18485/resylab.2024.6.ch46 М33
-
Protective channels to prevent a potential rockfall during blasting
Miljan Gomilanović, Stefan Milanović, Nikola Stanić, Miloš Živanović, Saša Stepanović, Aleksandar Doderović, Tanja Stanković (2024)Drilling and blasting at the Open Pit North Mining District takes place in the complex geological and urban environment conditions. The proximity of the city requires the performance of mining works with application the numerous and strict protection measures against the negative impact of mining. This paper presents a protection measure against the possible movement of loose pieces of rock that may occur as a result of blasting by creating the protective channels.open pit north mining district, rockfall during blasting, special protection measures, protective channelsMiljan Gomilanović, Stefan Milanović, Nikola Stanić, Miloš Živanović, Saša Stepanović, Aleksandar Doderović, Tanja Stanković. "Protective channels to prevent a potential rockfall during blasting" in The 55th international october conference on mining and metallurgy, Kladovo, Serbia, 15 - 17 october 2024, Mining and metallurgy institute Bor (2024). https://doi.org/10.5937/IOC24087T М33
-
Effectiveness Analysis of Different Bucket-wheel Excavators
Coal production in open-pit lignite mines in the Republic of Serbia is performed with continuous work systems. In addition to coal production, the same systems are used for the exploitation of large quantities of overburden. According to the reliability concept, continuous systems are in linear connection. If the failure occurs in one part of the system, that will produce a downtime of the entire system. The initial and most important factor of continuous systems is the bucket-wheel excavator. It ...Stevan Đenadić, Predrag Jovančić, Dragan Ignjatović, Miloš Tanasijević, Filip Miletić. "Effectiveness Analysis of Different Bucket-wheel Excavators" in 8th International Conference Mining and Environmental Protection, Sokobanja, 22-25 September 2021, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2021) М33
-
History of the development of the hydrodynamic model of the open pit mine “Drmno”, Serbia
With the creation of a hydrodynamic model, the need for it usually ceases until some next moment when the model needs to be updated and used for the set task for the necessary project documentation or dedicated studies. It is relatively rare that almost every year the model is improved and used for forecast calculations. The paper presents the basic characteristics and development of the hydrodynamic model of the open pit mine “Drmno” for 25 years. This open pit ...Dušan Polomčić, Jelena Ratković, Vesan Ristić Vakanjac. "History of the development of the hydrodynamic model of the open pit mine “Drmno”, Serbia" in National Conference with International Participation “GEOSCIENCES 2023”, Review of the Bulgarian Geological Society , Sofia : Bulgarian Geological Society (2023) М33
-
A Model for Determining the Dependability of Continuous Subsystems in Coal Mines Using the Fuzzy Logic Approach
Nikola Stanić, Miljan Gomilanović, Petar Marković, Daniel Krzanović, Aleksandar Doderović, Saša Stepanović (2024)This study presents a unique model for assessing the dependability of continuous parts of combined systems in open-pit mining through the application of fuzzy logic. Continuous sub-systems as part of the combined system of coal exploitation in surface mines have the basic function of ensuring safe operation, high capacity with high reliability, and low costs. These subsystems are usually part of the thermal power plant’s coal supply system and ensure stable fuel supply. The model integrates various independent partial ...fuzzy logic, max-min composition, continuous part of combined system (CCS), open pit, mining, dependabilityNikola Stanić, Miljan Gomilanović, Petar Marković, Daniel Krzanović, Aleksandar Doderović, Saša Stepanović. "A Model for Determining the Dependability of Continuous Subsystems in Coal Mines Using the Fuzzy Logic Approach" in Applied Sciences, Basel, August 2024, MDPI (2024). https://doi.org/https://doi.org/10.3390/app14177947 М22
-
The Effect of Groundwater on the Mining Mechanization at the Open Pit Mine Coal Drmno in Serbia
Milanović Radomir, Polomčić Dušan, Dimitrijević Bojan, Pešić Miodrag. "The Effect of Groundwater on the Mining Mechanization at the Open Pit Mine Coal Drmno in Serbia" in XІІI National conference with international participati on of the open and underwater mining of minerals, Varna, Bulgaria: (2015) M33
-
Stability analysis on slope PK dacite Ceramide
Safe surface mining exploitation of minerals is possibile only if stable bench and overall slopes in the open pit are construct. In order to to construct stable open pit slopes, it is necessary to carry out certain physical and mechanical laboratry testing of mineral raw materials in order to determine the geomechnical calculating parameters. These calculating parameters represent the base ground for performing slopes analyses and the open pit design. In this paper, an stability analysis of benches and ...Vladimir Čebašek, Veljko Rupar, Vladimir Ivoš, Vladimir Petković. "Stability analysis on slope PK dacite Ceramide" in VIII International geomechanics conference, Scientific And Technical Union of Mining, Geology and Metallurgy (2018) М33
-
Application of the system for dust control on the haulage roads on example of open pit Buvač
Vukelja Željko, Tošić Dražana, Negovanović Milanka. "Application of the system for dust control on the haulage roads on example of open pit Buvač" in Proceedings of the 7th Balkan Mining Congress BALKANMINE 2017 1 no. 7, Prijedor, Republic of Srpska:University of Banja Luka Faculty of Mining Prijedor, Mining Institute Belgrade Ltd (2017): 367-375. https://doi.org/10.7251/BMC170701367V M33
-
Optimisation the final countur of the open pit North mining district using the software package Whittle
Kržanović Daniel, Stevanović Dejan, Rajković Radmilo, Jovanović Milenko, Žikić Miodrag, Stojadinović Saša (2016)Kržanović Daniel, Stevanović Dejan, Rajković Radmilo, Jovanović Milenko, Žikić Miodrag, Stojadinović Saša. "Optimisation the final countur of the open pit North mining district using the software package Whittle" in 48th International October Conference on Mining and Metaullurgy, Bor:Technical Faculty in Bor (2016): 435-439 M33
-
Optimizacija i planiranje površinskih kopova stohastičkim modelima
Dejan R. Stevanović (2015-05-29)Savremeno rudarstvo izloženo je stalnom trendu pogoršanja uslova poslovanja.Mogućnost ostvarenja ekonomskih i drugih ciljeva rudarskog projektakompromitovana je stalnim pogoršanjem kvaliteta ležišta na kojima se vršieksploatacija, kao i značajnoj dozi neizvesnosti povezane sa geološkim,ekonomskim i tehničkim parametrima proizvodnje. U ovako kompleksnimuslovima poslovanja, matematički modeli sposobni da odgovore značajnimizazovima, odnosno ponude optimalna rešenja kojima se garantuje maksimalnoispunjenje projektovanih ciljeva, nameću se kao neophodnost.Trenutni, konvencionalni pristup optimizaciji i planiranju površinskih kopovazasniva se na algoritmima, razvijenim sredinom prošlog veka čije je opšteobeležje deterministički ...površinski kop, planiranje, optimizacija, stohastički modeli, kontrola kvaliteta uglja, neizvesnost.Dejan R. Stevanović. "Optimizacija i planiranje površinskih kopova stohastičkim modelima" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2015-05-29)
-
Decision making process in the selection recultivation open pit mine and landfils
Димитријевић Бојан, Чебашек Владимир, Илић Саша, Мајсторовић Јелена, Јанковић Иван. "Decision making process in the selection recultivation open pit mine and landfils" in Proceedings of the VI International symposium on mining and environmental protection, Vrdnik, Serbia:University of Belgrade, Faculty of mining and geology, Belgrade Center for Environmental engneering, Mining Department, Belgrade, Serbia (2017): 211-213 M33
-
Uncertainty in open pit optimisation
Kolonja Božo, Stevanović Dejan, Pešić Georgiadis Milica, Banković Mirjana, Kolonja Ljiljana. "Uncertainty in open pit optimisation" in 5th International symposium Mining and environmental protection, Beograd:Faculty of Mining and geology, Belgrade (2015): 358-392 M33
-
Results of the promethee method application in selecting the technologycal system at the Majdan III open pit mine
Vujić Slobodan, Hudej Marjan, Miljanović Igor. "Results of the promethee method application in selecting the technologycal system at the Majdan III open pit mine" in Archives of Mining Sciences 58 no. 4, -:Polish Academy of Sciences - Committee of Mining (2013): 1229-1240. https://doi.org/10.2478/amsc-2013-0084 M23
-
History of the development of the hydrodynamic model of the open pit mine “Drmno”, Serbia
With the creation of a hydrodynamic model, the need for it usually ceases until some next moment when the model needs to be updated and used for the set task for the necessary project documentation or dedicated studies. It is relatively rare that almost every year the model is improved and used for forecast calculations. The paper presents the basic characteristics and development of the hydrodynamic model of the open pit mine “Drmno” for 25 years. This open pit ...Dušan Polomčić, Jelena Ratković, Vesna Ristić Vakanjac. "History of the development of the hydrodynamic model of the open pit mine “Drmno”, Serbia" in Review of the Bulgarian Geological Society, Bulgarian Geological Society (2023). https://doi.org/10.52215/rev.bgs.2023.84.3.307 М23
-
Proactive monitoring system for basic mining equipment at open pit mines of Electric Power Industry of Serbia
Jovančić Predrag, Ignjatović Dragan, Tanasijević Miloš. "Proactive monitoring system for basic mining equipment at open pit mines of Electric Power Industry of Serbia" in XXI International Congress on Maintenance and Asset Management – EUROMAINTENANCE 1, Beograd :Serbian Maintenance Society (2012): 622-630 M33
-
Environmental Noise Management in Serbian Open Pit Mines
Cvjetić Aleksandar, Lilić Nikola, Milisavljević Vladimir, Pantelić Uroš. "Environmental Noise Management in Serbian Open Pit Mines" in Mining and Environmental Protection, 6th International Symposium, MEP 17, Vrdnik, 21-24 June 2017, Beograd:University of Belgrade, Faculty of Mining and Geology (2017): 349-354 M33
-
Isolation of old works and the possibility of a durable solution for the drainage of the pit mine Soko
Denić Miodrag, Svrkota Igor, Stojadinović Saša, Dragišić Veselin, Živanović Vladimir, Joković Dragan (2015)Denić Miodrag, Svrkota Igor, Stojadinović Saša, Dragišić Veselin, Živanović Vladimir, Joković Dragan. "Isolation of old works and the possibility of a durable solution for the drainage of the pit mine Soko" in Proceedings of the 5th International Symposium Mining And Environmental Protection, June 10-13,2015, Vrdnik, Serbia, Beograd:Faculty of Mining and Geology (2015): 331-337 M33
-
Technical Solution for Reclamation of the Trachyte Open Pit Mine Kisnjeva Glava at Fruska Gora
Šubaranović Tomislav, Petrović Branko, Ivoš Vladimir, Ristović Ivica. "Technical Solution for Reclamation of the Trachyte Open Pit Mine Kisnjeva Glava at Fruska Gora" in Proceedings of the VI International symposium on mining and environmental protection, Vrnjacka Banja, Serbia:University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2017): 206-210 M33
-
Project solution for land reclamation and spatial arrangement of the „Srebro“ open pit mine at the Fruška gora national park
Vujić Slobodan, Cvejić Jasminka, Miljanović Igor, Petrovski Aleksandar. "Project solution for land reclamation and spatial arrangement of the „Srebro“ open pit mine at the Fruška gora national park" in The Journal of the South African Institute of Mining and Metallurgy 111 no. 5, -:South African Institute of Mining and Metallurgy (2011): 365-370. https://doi.org/- M23