Претрага
225 items
-
Failure Estimation of the Majdanpek Open Pit East Face Based on Inverse Velocity Model
The Majdanpek open pit mine south district is currently active mining prospect of copper ore exploitation in eastern Serbia. Its depth is approaching the termination depth and occurrences of large-scale instabilities and global instability of the final pit slope is possible. These can generate catastrophic mass movement inside an area that encloses a regional road route and the Pek River bed which is channelled along the outer contour of the pit. The displacements that were noted in early 2023, in the ...Miloš Marjanović, Stefan Milanović, Nikola Simić, Lazar Kričak. "Failure Estimation of the Majdanpek Open Pit East Face Based on Inverse Velocity Model" in Regional Symposium on Landslides in the Adriatic-Balkan Region, Belgrade, 15-18th May 2024, University of Belgrade, Faculty of Mining and Geology (2024). https://doi.org/10.18485/resylab.2024.6.ch46
-
History of the development of the hydrodynamic model of the open pit mine “Drmno”, Serbia
With the creation of a hydrodynamic model, the need for it usually ceases until some next moment when the model needs to be updated and used for the set task for the necessary project documentation or dedicated studies. It is relatively rare that almost every year the model is improved and used for forecast calculations. The paper presents the basic characteristics and development of the hydrodynamic model of the open pit mine “Drmno” for 25 years. This open pit ...Dušan Polomčić, Jelena Ratković, Vesan Ristić Vakanjac. "History of the development of the hydrodynamic model of the open pit mine “Drmno”, Serbia" in National Conference with International Participation “GEOSCIENCES 2023”, Review of the Bulgarian Geological Society , Sofia : Bulgarian Geological Society (2023)
-
Overwiew of In-Pit Crushing & Conveying Technology in Open Pit Mines
The conditions under which contemporary surface mining operations is carried out obviously becoming increasingly complex. In such complex conditions, the optimization of haulage systems as the technological phase with the largest share in the total operating costs, is very important from the aspect of achieving profitability of the mining project. In a large number of cases, the application of traditional haulage systems with trucks (as the most dominant type of haulage in open pit mines) does not lead to ...Ali Nasirinezhad, Dejan Stevanović, Dragan Ignjatović, Petar Marković. "Overwiew of In-Pit Crushing & Conveying Technology in Open Pit Mines" in 8th International Conference MIining And Environmental Protection, Sokobanja, 22-25 September 2021, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2021)
-
Effectiveness Analysis of Different Bucket-wheel Excavators
Coal production in open-pit lignite mines in the Republic of Serbia is performed with continuous work systems. In addition to coal production, the same systems are used for the exploitation of large quantities of overburden. According to the reliability concept, continuous systems are in linear connection. If the failure occurs in one part of the system, that will produce a downtime of the entire system. The initial and most important factor of continuous systems is the bucket-wheel excavator. It ...Stevan Đenadić, Predrag Jovančić, Dragan Ignjatović, Miloš Tanasijević, Filip Miletić. "Effectiveness Analysis of Different Bucket-wheel Excavators" in 8th International Conference Mining and Environmental Protection, Sokobanja, 22-25 September 2021, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2021)
-
Analiza geomehaničke stabilnosti kosina na odlagalištima i površinskom kopu Ćeramide
Kako bi se nastavila eksploatacija dacita na površinskom kopu Ćeramide kod Rudnika, potrebno je izraditi novu projektnu dokumentaciju na osnovu novih overenih rezervi. Da bi se eksploatacija jalovine i dacita odvijala sigurno bez klizanja i obrušavanja stenskog materijala, neophodno je izvršiti proveru stabilnosti projektovanih kosina i na odlagalištima i na samom površinskom kopu. U ovom radu je upravo data analiza geomehaničke stabilnosti kosina na odlagalištima i površinskom kopu dacite Ćeramide kod Rudnika.Tomislav Šubaranović, Vladimir Čebašek, Bojan Dimitrijević, Veljko Rupar. "Analiza geomehaničke stabilnosti kosina na odlagalištima i površinskom kopu Ćeramide" in XV Međunarodna konferencija OMC 2022, Zlatibor, 12-15. oktobar 2022., Jugoslovenski komitet za površinsku eksploataciju (2022)
-
A Model for Determining the Dependability of Continuous Subsystems in Coal Mines Using the Fuzzy Logic Approach
Nikola Stanić, Miljan Gomilanović, Petar Marković, Daniel Krzanović, Aleksandar Doderović, Saša Stepanović (2024)This study presents a unique model for assessing the dependability of continuous parts of combined systems in open-pit mining through the application of fuzzy logic. Continuous sub-systems as part of the combined system of coal exploitation in surface mines have the basic function of ensuring safe operation, high capacity with high reliability, and low costs. These subsystems are usually part of the thermal power plant’s coal supply system and ensure stable fuel supply. The model integrates various independent partial ...fuzzy logic, max-min composition, continuous part of combined system (CCS), open pit, mining, dependabilityNikola Stanić, Miljan Gomilanović, Petar Marković, Daniel Krzanović, Aleksandar Doderović, Saša Stepanović. "A Model for Determining the Dependability of Continuous Subsystems in Coal Mines Using the Fuzzy Logic Approach" in Applied Sciences, Basel, August 2024, MDPI (2024). https://doi.org/https://doi.org/10.3390/app14177947
-
Optimizacija i planiranje površinskih kopova stohastičkim modelima
Dejan R. Stevanović (2015-05-29)Savremeno rudarstvo izloženo je stalnom trendu pogoršanja uslova poslovanja.Mogućnost ostvarenja ekonomskih i drugih ciljeva rudarskog projektakompromitovana je stalnim pogoršanjem kvaliteta ležišta na kojima se vršieksploatacija, kao i značajnoj dozi neizvesnosti povezane sa geološkim,ekonomskim i tehničkim parametrima proizvodnje. U ovako kompleksnimuslovima poslovanja, matematički modeli sposobni da odgovore značajnimizazovima, odnosno ponude optimalna rešenja kojima se garantuje maksimalnoispunjenje projektovanih ciljeva, nameću se kao neophodnost.Trenutni, konvencionalni pristup optimizaciji i planiranju površinskih kopovazasniva se na algoritmima, razvijenim sredinom prošlog veka čije je opšteobeležje deterministički ...površinski kop, planiranje, optimizacija, stohastički modeli, kontrola kvaliteta uglja, neizvesnost.... of production planning on the lignite open pit. Second model that is being developed is hybrid type. It has stochastic (Monte Carlo method) and deterministic component and treats the problem of optimization of open pit boundaries. Keywords: open pit mine, planning, optimization, stochastic ...
... n of waste transportation system for open pit Buvač, Tehnika, Beograd Mario, J. M, Salma, J, P, 1973, Ore Reserve Education and Open Pit Planning, X-ti APCOM, Johanesburg, South Africa Martinez, L. A. 2003. Can quantification of geological risk improve open pit mine design? MPhil, In Academic. Dep ...
... Optimum Design of Open Pit, X-ti APCOM, Johanesburg, South Africa Pit Optomizer, Surpaca 6.1, Dassalt Systems-Geovia, dostupno na adresi:http://www.gemcomsoftware.com/products/Surpac, pristupljeno adresi 08 marta 2013. Pitkanen, P, 1997, Open Pit Optimization, Calculating the Optimum Pit Limits, Helsinki ...Dejan R. Stevanović. "Optimizacija i planiranje površinskih kopova stohastičkim modelima" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2015-05-29)
-
Determining the Availability of Continuous Systems at Open Pits Applying Fuzzy Logic
This work presents a model for determining the availability of continuous systems at open pits by applying fuzzy logic and fuzzy inference systems. The applied model was formed by the synthesis of independent partial indicators of availability. The model is based on an expert system for assessing the availability of continuous mining systems. The availability of the system, as a complex state parameter, is decomposed into the partial indicators, reliability, and convenience of maintenance, and the fuzzy compositions, used ...системи, континуални систем експоатације, површински коп, рударство, расположивост, фази логика, max–min композиција, min–max композицијаMiljan Gomilanović, Miloš Tanasijević, Saša Stepanović. "Determining the Availability of Continuous Systems at Open Pits Applying Fuzzy Logic" in Energies, MDPI AG (2022). https://doi.org/10.3390/en15186786
-
The optimization of auxiliary machinery in open-cast lignite mines: a case study of bulldozers
One of the most important prerequisites for the successful operation of the open-cast lignite mine is to carry out all the auxiliary works timely with the necessary quality. The most important and most commonly used auxiliary machines are bulldozers. Engaging time of bulldozers use is in direct relation with the coefficients of the time and capacity utilization of the continuous system for the excavation of coal and tailings, which indicates their importance. More than 100 bulldozers have been hired ...... REFERENCES 1. Optimizing organization, resources and costs of auxiliary mechanization to increase utilization of overburden and coal systems on open pit mines of EPS (in Serbian) (2018) Study, Faculty of Mining and Geology, Belgrade 2. Jovantié, P. Maintenance of mining machines (in Serbian), University ...
... that machihe. Keywords: Open-cast coal mine, auxiliary works, bulldozers, optimization, availabilifty. 1. INTRODUCTION Dozers are most common auxiliary machines at open-cast coal mines, both by type and the scope of tasks these machines can be used for. In the open-cast lignite mines of Electric ...
... machinery in open-cast lignite mines: a case study of bulldozers Dragan Ignjatović, Predrag Jovančić, Stevan Đenadić, Ivan Janković, Ivica Ristović Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] The optimization of auxiliary machinery in open-cast lignite ...Dragan Ignjatović, Predrag Jovančić, Stevan Đenadić, Ivan Janković, Ivica Ristović. "The optimization of auxiliary machinery in open-cast lignite mines: a case study of bulldozers" in 7th International Symposium Mining and Environmental Protection, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2019)
-
Coal homogenization stockyard sizing “Tamnava – Zapad” case study
... the input variation. An application of efficient methods of conditional simulation for optimizing coal blending strategies in large continuous open pit mining operations (Benndorf, 2013.) integrates simulated realizations of the deposit with a simulation of transport- and blending models of mining ...
... for organizational reasons the number of piles cannot be increased indefinitely, but is always around a rational 4 to 8 piles. CONCLUSION At open pit "Tamnava - Zapad" coal quality homogenization is planned according to lower heating value, and the process takes place in several steps. The ho ...
... 1. Benndorf, J., 2013. Application of efficient methods of conditional simulation for optimising coal blending strategies in large continuous open pit mining operations. International Journal of Coal Geology, 112, pp.141-153. 2. Beretta, F.S., Costa, J.F.C.L. and Koppe, J.C., 2010. Reducing ...Božo Kolonja, Dinko Knežević, Ranka Stanković, Dejan Stevanović, Detlef Trummer. "Coal homogenization stockyard sizing “Tamnava – Zapad” case study" in Proceedings of 13th International Symposium Continuous Surface Mining, ISCSM 2016, / (2016)
-
Deformation and bearing capacity of buried material near the shaft opening at the open pit mine “Zagradje” – open pit 2”
Ljubojev Milenko, Ignjatović Dragan, Ljubojev Vesna, Đurđevac Ignjatović Lidija, Rakić Dragoslav (2010)Ljubojev Milenko, Ignjatović Dragan, Ljubojev Vesna, Đurđevac Ignjatović Lidija, Rakić Dragoslav. "Deformation and bearing capacity of buried material near the shaft opening at the open pit mine “Zagradje” – open pit 2”" in Mining Enginerering = Rudarski radovi no. 2, Bor, Srbija:Mining and metallurgy institute Bor (2010): 115-122
-
Primary crusher site selection in open pit mines - case study in Sungun copper mine
Facility site selection, (such as Primary or in pit Crusher location) is one of the most important steps in mine de-sign process that has a significant impact on economy of the mining operation. This study covers an attempt to find the optimal location forprimary crusher in order to support the expansion of Sungun copper mine, which is the second largest open pit mine in Iran. Recent exploration drilling has led to a considerable increase in the ore reserve. Therefore, ...Ali Nasirinezhad, Dejan Stevanović, Dragan Ignjatović, Mehdi Rahmanpou. "Primary crusher site selection in open pit mines - case study in Sungun copper mine" in Underground mining engineering, Универзитет у Београду, Рударско-геолошки факултет (2021)
-
Development of an integrated model for open-pit-mine discontinuous haulage system optimization
Miodrag Čelebić, Dragoljub Bajić, Sanja Bajić, Mirjana Banković, Duško Torbica, Aleksej Milošević , Dejan Stevanović (2024)Miodrag Čelebić, Dragoljub Bajić, Sanja Bajić, Mirjana Banković, Duško Torbica, Aleksej Milošević , Dejan Stevanović . "Development of an integrated model for open-pit-mine discontinuous haulage system optimization" in Sustainability, MDPI (2024). https://doi.org/10.3390/su16083156
-
Human factor risk management procedures applied in the case of open pit mine
Snežana Kirin, Aleksandar Sedmak, Wei Li, Miodrag Brzaković, Igor Miljanović, Ana Petrović, Simon Sedmak (2021)Risk management aims to provide a controlled work environment to ensure the safe operation of the high-risk systems. It is a dynamic process which work in a continual state of change. The issue of human factor risk and rules and regulations in open pit mine is a main focus of this paper in order to develop predictive models of behavior of workers in relation to compliance with the procedures and rules. Presented survey was conducted in open pit coal ...Snežana Kirin, Aleksandar Sedmak, Wei Li, Miodrag Brzaković, Igor Miljanović, Ana Petrović, Simon Sedmak. "Human factor risk management procedures applied in the case of open pit mine" in Engineering Failure Analysis (2021). https://doi.org/https://doi.org/10.1016/j.engfailanal.2021.105456
-
Approach to operational mine planning: Case study Tamnava West
... CASE STUDY The case study is conducted on open pit Tamnava West field. Tamnava West is a part of Kolubara coal basin, and it operates under governance of Electric Power Industry of Serbia (EPS). Currently, Tamnava West is a biggest coal open pit in Serbia, with capacity of 13 million tons ...
... Excavator- Conveyors-Spreader) are engaged on overburden excavation. General technological scheme of open pit Tamnava West is presented on Figure 1. Figure 1. General technological scheme of open pit Tamnava West 2.1. Developing of technological model for coal quality control Minex is the recognized ...
... model for operational planning and coal quality control in Minex for the Tamnava West open pit, was based on 6 steps: - Preparation of data - Geological modeling - Ultimate pit design - Design of pit benches - Discretization of benches on mining blocks and cuts - Reporting 2.1.1 ...Dejan Stevanović, Mirjana Banković, Milica Pešić Georgiadis, Ranka Stanković. "Approach to operational mine planning: Case study Tamnava West" in Tehnika, Beograd : Savez inženjera i tehničara Srbije (2014). https://doi.org/10.5937/tehnika1406952S
-
Some models for determination of parameters of the soil oscillation law during blasting operations
... Veliki Krivelj Open Pit in the Bor District, and ‚ investigation carried out during mass mining in the Kovilovača Open Pit near Despotovac. 4.1. Experimental Investigation in the VelikiKrivelj Open Pit 4.1.1. General Characteristics of the Work Environment in the Veliki Krivelj Open Pit In the Veliki ...
... Kovilovača Open Pit. ‚ Model 2 v2 “ 2571.7694 ¨ R´2.4856 (32) ‚ Model 3By using experimental data given in Table 4, where: R1 = 21.8117, RN = R12 = 75.2014, and where: Energies 2016, 9, 617 12 of 15 Table 4. Survey of blasting parameters and measurement results in the Kovilovaéa Open Pit Pit. No. MM ...
... part of this study includes experimental investigations performed in the Veliki Krivelj Open Pit in the Bor District located in Eastern Serbia and investigations carried out during mass mining in the Kovilovača Open Pit near Despotovac, Eastern Serbia. Thus this paper offers several modes for determination ...Suzana Lutovac, Dragan Medenica, Branko Gluščević, Rade Tokalić, Čedomir Beljić. "Some models for determination of parameters of the soil oscillation law during blasting operations" in Energies, Basel, Switzerland : MDPI (2018). https://doi.org/10.3390/en9080617
-
Analysis of a simplified model for determining rock mass oscillation velocity at the Kovilovača open pit
... the Kovilovača open pit Suzana Lutovac, Miloš Gligorić, Jelena Majstorović, Luka Crnogorac Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Analysis of a simplified model for determining rock mass oscillation velocity at the Kovilovača open pit | Suzana Lutovac ...
... e, if it is, by its structure, similar to the basic set [&8]. 199 6. REVIEW OF MASS BLASTING AT THE KOVILOVAČA OPEN PIT 6.1 General characteristics of the Kovilovača open pit Measurements are performed at the mass or stratified limestone |9]. The physical — mechanical characteristics of the ...
... dynamic elasticity modulus FE„ lin • „dynamic Poisson' ratio //„„ — 0.39|iGN/m2] . 6.2 Method of blasting in the open pit Kovilovača Measurements of seismic shocks in the open pit Kovilovača were performed during blasting, conducted for the purpose of deposit exploitation [9]. Two blasting operations ...Suzana Lutovac, Miloš Gligorić, Jelena Majstorović, Luka Crnogorac. "Analysis of a simplified model for determining rock mass oscillation velocity at the Kovilovača open pit" in 9th International Conference Mining and Environmental protection MEP, 24 – 27 May 2023, Sokobanja, Serbia, Belgrade : University of Belgrade-Faculty of mining and geology (2023)
-
Application of MCDA in the determination of optimal block size for open-pit modelling and mine planning
The process of creating a geological block model as the basis for a further detailed design and planning of mining operations is a very responsible task. Errors made during this initial process are transferred to all other phases of the mining project. Certainly, one of the most important decisions for the modelling process is the choice of the appropriate size of the blocks that form the model itself. The determination of the optimal block size is not a simple ...dimenzije minibloka, višekriterijumska analiza, AHP, modeliranje ležišta, planiranje na površinskim kopovimaPetar Marković, Dejan Stevanović, Milica Pešić Georgiadis, Mirjana Banković. "Application of MCDA in the determination of optimal block size for open-pit modelling and mine planning" in Underground Mining Engineering, Univerzitet u Beogradu, Rudarsko-geološki fakultet (2021)
-
Razvoj ARCGIS geobaze površinskog kopa korišćenjem UML CASE alata
... by the example of the "Field G" open pit, followed by an outline of the way spatial-temporal data are handled, as well as by an example of visualization of spatial classes in ArcMap. Keywords: geographic information system, GIS, geodatabase, UML, ArcGIS, open pit INTRODUCTION The growing complexity ...
... originating from the pre-project and feasibility study for opening and developing the “Field G” open pit (Idejni projekat sa studijom opravdanosti otvaranja i izgradnje površinskog kopa “Polje G”). Open pit "Field G" is currently not in function. Its opening, preliminary scheduled for 2015, will provide ...
... Faculty of Mining and Geology archives faculty publications available in open access, as well as the employees' publications. - The Repository is available at: www.dr.rgf.bg.ac.rs 1 USING UML CASE TOOLS FOR DEVELOPMENT OF AN OPEN PIT ARCGIS GEODATABASE Aleksandra Tomašević, Ljiljana Kolonja, Ivan ...Aleksandra Tomašević, Ljiljana Kolonja, Ivan Obradović, Ranka Stanković, Olivera Kitanović. "Razvoj ARCGIS geobaze površinskog kopa korišćenjem UML CASE alata" in Podzemni radovi, Beograd : Univerzitet u Beogradu - Rudarsko-geološki fakultet (2012)
-
Stability analysis on slope PK dacite Ceramide
Safe surface mining exploitation of minerals is possibile only if stable bench and overall slopes in the open pit are construct. In order to to construct stable open pit slopes, it is necessary to carry out certain physical and mechanical laboratry testing of mineral raw materials in order to determine the geomechnical calculating parameters. These calculating parameters represent the base ground for performing slopes analyses and the open pit design. In this paper, an stability analysis of benches and ...Vladimir Čebašek, Veljko Rupar, Vladimir Ivoš, Vladimir Petković. "Stability analysis on slope PK dacite Ceramide" in VIII International geomechanics conference, Scientific And Technical Union of Mining, Geology and Metallurgy (2018)