Претрага
179 items
-
Geotechnical conditions of “Debelo brdo” tunnel construction on the highway E-80: Nis-Merdare-Pristina (“Peace Highway”)
The construction of the highway E-80 has begun in Serbia, which will represent the traffic hub of the Western Balkans and will be part of the main regional transport network of Southeast Europe. Its total length through Serbia is 77 km, and one part of the route is designed through a typical plain terrain, while a larger part of the route passes through hilly terrain. The construction of the tunnel “Debelo brdo” is planned partly in an open cut ...Dragoslav Rakić, Irena Basarić Ikodinović, Radojica Lapčević, Dragan Lukić. "Geotechnical conditions of “Debelo brdo” tunnel construction on the highway E-80: Nis-Merdare-Pristina (“Peace Highway”)" in Proceedings of the XVIII ECSMGE 2024 geotechnical engineering challenges to meet current and emerging needs of society, Lisbon, 26-30 August 2024, CRC Press (2024). https://doi.org/10.1201/9781003431749-356
-
Approach to operational mine planning: Case study Tamnava West
... regarding current excavation (real time excavation). For that purpose, discretization of model needs to be further conducted, to the level of excavator’s cuts. The reason for this is excavation technology of bucket wheel excavator (BWE) which is based on individually excavation of one cut. In this ...
... In Minex for every excavation cut, separate grid must be generated, and this is very time consuming and only semi-automated or completely manual process. In that sense it is better to develop custom software capable to cope with problems that are unique for specific open pit mine. Good example ...
... is 5.621 kJ/kg. All this suggest that selective excavation must be conduct in order to achieve desirable LCV within coal mining cuts. Example mining block divided in 5 mining cuts is shown on the Figure 9b. Three cuts (cut 1, cut 3 and cut 4) have the LCV in prescribed limits (6.700 kJ/kg ...Dejan Stevanović, Mirjana Banković, Milica Pešić Georgiadis, Ranka Stanković. "Approach to operational mine planning: Case study Tamnava West" in Tehnika, Beograd : Savez inženjera i tehničara Srbije (2014). https://doi.org/10.5937/tehnika1406952S
-
Failure Estimation of the Majdanpek Open Pit East Face Based on Inverse Velocity Model
The Majdanpek open pit mine south district is currently active mining prospect of copper ore exploitation in eastern Serbia. Its depth is approaching the termination depth and occurrences of large-scale instabilities and global instability of the final pit slope is possible. These can generate catastrophic mass movement inside an area that encloses a regional road route and the Pek River bed which is channelled along the outer contour of the pit. The displacements that were noted in early 2023, in the ...Miloš Marjanović, Stefan Milanović, Nikola Simić, Lazar Kričak. "Failure Estimation of the Majdanpek Open Pit East Face Based on Inverse Velocity Model" in Regional Symposium on Landslides in the Adriatic-Balkan Region, Belgrade, 15-18th May 2024, University of Belgrade, Faculty of Mining and Geology (2024). https://doi.org/10.18485/resylab.2024.6.ch46
-
Definisanje parametara čvrstoće na smicanje kod izvođenja kosina u ispucalom stenskom masivu
Zoran M. Berisavljević (2016-04-01)Definisanje parametara čvrstoće na smicanje ispucalih stenskih masa predstavlja jedanod najzahtevnijih zadataka mehanike stena. Geotehnička istraživanja su uglavnomograničena na rezultate laboratorijskih ispitivanja malih makroskopski homogenihuzoraka, sa kojih se vrši ekstrapolacija rezultata na terensku razmeru. Ispitivanja semogu vršiti in situ, ali su i ona ograničena veličinom korišćene aparature imikrolokacijom na kojoj se vrše ispitivanja. Pored toga, moguće je vršiti različitaispitivanja na fizičkim modelima, koja su veoma složena i skupa. Ekstrapolacijapodataka sa malog uzorka na terensku razmeru daje mnogo bolje rezultate ...naponsko stanje, ispucalost, heterogenost, čvrstoća na smicanje, geološki indeksčvrstoće, Hoek-Brownov materijal, kompozitni uzorci, dezintegracija, povratna analizaZoran M. Berisavljević. "Definisanje parametara čvrstoće na smicanje kod izvođenja kosina u ispucalom stenskom masivu" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2016-04-01)
-
Control of substructure construction of railways in the Republic of Serbia
Контрола збијености природног тла (у ископу) или збијеног у насипу при изградњи саобраћајница представља један од основних облика контроле квалитета доњег строја. Код изградње брзих саобраћајница (аутопутеви и брза железница) приоритет је постизање високог нивоа контроле извршених радова. У циљу онемогућавања диференцијалног слегања (при изградњи насипа), или промене запремине услед допунског збијања материјала, које неминовно доводе до деформација, потребно је извршити оптимално збијање материјала. У оквиру овог рада приказује се техничка регулатива која регулише контролу збијености при изградњи железничке ...... basaric@rgf.bg.ac.rs CONTROL OF SUBSTRUCTURE CONSTRUCTION OF RAILWAYS IN THE REPUBLIC OF SERBIA Abstract Control of compaction of natural soil (in excavation) or compacted in the embankment during the construction of roads is one of the basic forms of quality control of the substructure. When building ...
... the protective layer, transition layer, embankment, foundation soil under the embankment and soil control on the part of the railway trunk in the cut. 2.1. INSTRUCTION 338 Table 1.Required values of compaction and degree of unevenness [1:12-12] Type of Planum of the railway /on top of the protective ...
... Protective layer EV2 = 80 MN/m2 Transition layer EV2 = 60 MN/m2 Below the transition layer EV2 = 45 MN/m2 or Rc* > 100% v) For the railway in the cut Railway planum level EV2 = 120 - 80** MN/m2 Protective layer EV2 = 80 - 45** MN/m2 Transition layer EV2 = 45 MN/m2 Below the transition layer EV2 ...Dragan Lukić, Dragoslav Rakić, Irena Basarić Ikodinović. "Control of substructure construction of railways in the Republic of Serbia" in International Conference On Contemporary Theory and Practice in Construction XV, Banja Luka 16-17 jun 2022., University of Banja Luka Faculty of Architecture, Civil Engineering and Geodesy (2022)
-
Adaptive neuro-fuzzy prediction of operation of the bucket wheel drive based on wear of cutting elements
The capacity of the rotor excavator depends largely on the operation of the subsystem for digging. There is a great contribution to the correct and sharp teeth when the capacity is the highest. In the function of time, the teeth become clogged due to abrasive wear, or changes in their geometric shape. To analyze the bucket wheel drive in depend on wear of the cutting elements in this study adaptive neuro fuzzy inference system (ANFIS) approach was implemented. ANFIS ...Filip Miletić, Predrag D. Jovančić, Milos Milovančević, Dragan Ignjatović. "Adaptive neuro-fuzzy prediction of operation of the bucket wheel drive based on wear of cutting elements" in Advances in Engineering Software, Elsevier BV (2020). https://doi.org/10.1016/j.advengsoft.2020.102824
-
Application of VIКOR method in the selection of an optimal splution of excavation “Borska Reka” ore deposit
Sanja Bajić, Dragoljub Bajić, Branko Glušćević, Radmila Gaćina. "Application of VIКOR method in the selection of an optimal splution of excavation “Borska Reka” ore deposit" in 9th International Conference Mining and Environmental protection MEP, 24 – 27 May 2023, Sokobanja, Serbia , Belgrade : University of Belgrade-Faculty of mining and geology (2023)
-
Rock slope stability analysis under Hoek–Brown failure criterion with different flow rules
The stability analysis of homogeneous rock slope following the Hoek–Brown failure criterion under the hypothesis of different flow rules is performed based on limit equilibrium and finite element methods. The applied failure criterion is the generalized Hoek–Brown that can be introduced as a shear/normal function in analysis applying different flow rules. The results are compared with those obtained by the application of equivalent shear strength parameters of the Mohr–Coulomb criterion, considering that this is still the most widely used ...Kružna klizna površ, Huk-Braunov kriterijum loma, Kriterijum popuštanja, Smičuća/normalna funkcija, Nivo napona, Verovatnoća i parametarska analizaSvetlana Melentijević, Zoran Berisavljević, Dušan Berisavljević, Claudio Olalla Marañón . "Rock slope stability analysis under Hoek–Brown failure criterion with different flow rules" in Bulletin of Engineering Geology and the Environment , Springer (2024). https://doi.org/10.1007/s10064-024-03667-0
-
Multiple-Criteria Decision-Making in Mine Development Planning
Sanja Bajić (2023)The Borska Reka ore deposit is an experimental location where developed methodologies have been applied. It is the largest ore body within the Bor mining complex, which has been the subject of numerous studies and analyses for more than three decades. The paper focuses on the application of FAHP and the VIKOR method to address ranking of alternatives and select the optimal mining method by means of fuzzy multicriteria optimization.Sanja Bajić. "Multiple-Criteria Decision-Making in Mine Development Planning" in Proceedings of the 5th International Underground Excavations Symposium, 5-6-7 June 2023, Istanbul, Topkapi : Dinç Ofset Mat. Rek. San. ve Tic. Ltd. Şti. (2023)
-
Definition of criteria and alternatives for choosing the optimal mining method deposits when applying multi: Criteria optimization, Belgrade, June 2024
Sanja Bajić, Dragoljub Bajić, Branko Gluščević, Radmila Gaćina, Josip Išek. "Definition of criteria and alternatives for choosing the optimal mining method deposits when applying multi: Criteria optimization, Belgrade, June 2024" in Podzemni radovi, Beograd, jun 2024, Centre for Evaluation in Education and Science (CEON/CEES) (2024). https://doi.org/10.5937/podrad2444071B
-
The optimization of auxiliary machinery in open-cast lignite mines: a case study of bulldozers
One of the most important prerequisites for the successful operation of the open-cast lignite mine is to carry out all the auxiliary works timely with the necessary quality. The most important and most commonly used auxiliary machines are bulldozers. Engaging time of bulldozers use is in direct relation with the coefficients of the time and capacity utilization of the continuous system for the excavation of coal and tailings, which indicates their importance. More than 100 bulldozers have been hired ...... that machihe. Keywords: Open-cast coal mine, auxiliary works, bulldozers, optimization, availabilifty. 1. INTRODUCTION Dozers are most common auxiliary machines at open-cast coal mines, both by type and the scope of tasks these machines can be used for. In the open-cast lignite mines of Electric ...
... machinery in open-cast lignite mines: a case study of bulldozers Dragan Ignjatović, Predrag Jovančić, Stevan Đenadić, Ivan Janković, Ivica Ristović Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] The optimization of auxiliary machinery in open-cast lignite ...
... publications available in open access, as well as the employees' publications. - The Repository is available at: www.dr.rgf.bg.ac.rs 7% International Symposium MINING AND ENVIRONMENTAL PROTECTION 25 - 28 September 2019, Vrdnik, Serbia THE OPTIMIZATION OF AUXILIARY MACHINERY IN OPEN-CAST LIGNITE MINES: ...Dragan Ignjatović, Predrag Jovančić, Stevan Đenadić, Ivan Janković, Ivica Ristović. "The optimization of auxiliary machinery in open-cast lignite mines: a case study of bulldozers" in 7th International Symposium Mining and Environmental Protection, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2019)
-
Rock excavation methods in urban areas
Stefan Milanović, Lazar Kričak, Milanka Negovanović, Nikola Simić, Jovan Marković, Nikola Đokić (2023)Povećan obim građevinskih radova, koji podrazumevaju izgradnju novih stambenih i poslovnih objekata, hotela, garaža, tržnih centara i slično, sve je češći u urbanim sredinama. Ovakvi radovi sve više dolaze u kontakt sa različitom vrstom problema prilikom izgradnje, kao jedan od tih problema izdvajamo pojavu čvrste stenske mase prilikom otkopavanja na lokacijama izgradnje budućih objekata predviđenih građevinskim projektom. Prilikom izgradnje objekata tj. dela objekta koji podrazumeva podzemne prostorije nekog objekta, potrebno je vršiti iskop materijala na lokaciji, međutim taj materijal ...Stefan Milanović, Lazar Kričak, Milanka Negovanović, Nikola Simić, Jovan Marković, Nikola Đokić. "Rock excavation methods in urban areas" in Podzemni radovi, Beograd : Rudarsko-geološki fakultet (2023). https://doi.org/10.5937/podrad2342047m
-
Application of Expansive Mortars for the Formation of Artificial Screens During Blasting in Urban Areas
During construction of buildings in urban areas, sometimes there is a need to blast solid rock mass in the immediate vicinity of the surrounding buildings. In that case, the aim is not only to increase the efficiency of blasting, but also to reduce harmful effects of ground vibration induced by blasting. At the same time, it is very important to protect the buildings located in the safe zone from the blast site as well as remaining rock mass around ...Milanka Negovanović, Lazar Kričak, Stefan Milanović, Nikola Simić, Jelena Majstorović. "Application of Expansive Mortars for the Formation of Artificial Screens During Blasting in Urban Areas" in 31st International Conference Ecological Truth & Environmental Research-EcoTER'24, Sokobanja, 18-21. jun 2024, Bor : Tehnički fakultet u Boru (2024)
-
Tehno-ekonomska analiza varijanti sistema odvodnjavanja površinskog kopa Drmno od podzemnih voda do kraja eksploatacije
Odvodnjavanje površinskog kopa Drmno od podzemnih voda je jedan od najznačajnijih podsistema u procesu eksploatacije u veoma zavodnjenoj radnoj sredini Kostolačkog basena uglja. Već od 2006. godine, Inovirani dugoročni program razvoja eksploatacije uglja predviđa izradu ekrana, pored zadržavanja postojećih standardnih metoda odvodnjavanja od podzemnih voda linijama bunara. Iako je kasnijim Glavnim rudarskim projektom, takođe, bila predviđena izrada ekrana, njegova realizacija nije započela. Na osnovu realnog sagledavanja postojeće projektne dokumentacije, početak izrade ekrana se predviđa od 2023. godine. ...Tomislav Šubaranović, Dušan Polomčić, Vladimir Pavlović. "Tehno-ekonomska analiza varijanti sistema odvodnjavanja površinskog kopa Drmno od podzemnih voda do kraja eksploatacije" in XIII Međunarodna konferencija OMC, Zlatibor, 2018, Jugoslovenski komitet za površinsku eksploataciju (2018)
-
The importance of geotechnical data for deep excavation in urban centres
Rakić Dragoslav, Čaki Laslo (2012)Rakić Dragoslav, Čaki Laslo. "The importance of geotechnical data for deep excavation in urban centres" in Drugi međunarodni naučni skup Stanje i pravci razvoja građevinarstva - GTZ 2012 i Drugo savjetovanje GEO-EXPO 2012 : zbornik radova = 2nd international scientifinc meeting State and Trends of civil enginnering GTZ 2012 and 2nd Conference GEO-EXPO 20, Tuzla, BIH:Rudarsko-geološko-građevinski fakultet (2012): 541-548
-
Lost production costs of the overburden excavation system caused by rubber belt failure
Bugarić Uglješa, Tanasijević Miloš, Polovina Dragan, Ignjatović Dragan, Jovančić Predrag. "Lost production costs of the overburden excavation system caused by rubber belt failure" in Journal of Maintenance and Reliability 14 no. 4, :Polish Maintenance Society (2012): 333-341
-
Forecasting the Behaviour of the Rock Mass Before Taking Up the Excavation on a Deeper Layers of the Ore Body Borska Reka
Zlatanović Dragan, Milisavljević Vladimir, Milenko Ljubojev, Dragan Ignjatović, Zoran Stojanović (2015)Zlatanović Dragan, Milisavljević Vladimir, Milenko Ljubojev, Dragan Ignjatović, Zoran Stojanović. "Forecasting the Behaviour of the Rock Mass Before Taking Up the Excavation on a Deeper Layers of the Ore Body Borska Reka" in Mining and Metalurgy Engineering Bor no. 2, Bor:Mining and Metallurgy Institute, Bor (2015): 29-52. https://doi.org/10.5937/MMEB1502029Z
-
Geotehnički uslovi izgradnje tunela „Debelo brdo“ na autoputu E-80 Niš - Pločnik
Tunel „Debelo brdo“ nazvan je po najizraženijem relјefnom obliku na ovoj drugoj deonici autoputa E-80 Niš – Pločnik. Osnovnu geološku građu na lokaciji tunela čini Mio-Plioceni kompleks heterogenog litološkog sastava. Izgradnja tunela je predviđena delom u otvorenom iskopu dužine 240 m, a delom sa podzemnim iskopom dužine 190 m. U zoni tunela, padina je okarakterisana kao uslovno stabilna, pa bi neadekvatna zasecanja mogla da izazovu klizanja terena. Iz tih razloga, u okviru rada posebno su prikazani geotehnički uslovi izgradnje ...... presents separately the geotechnical conditions for the construction of the tunnel in open excavation (temporary excavation securing by installing piles is provided), and the geotechnical conditions for tunnel excavation with a partially modified model in relation to the proposed design solution. Keywords: ...
... Mio-Pliocene complex of heterogeneous lithological composition. The construction of the tunnel is partly planned in an open excavation 240 m long, and partly with an underground excavation 190 m long. In the tunnel zone, the slope is characterized as conditionally stable, so inadequate cuts could cause ...
... на www.dr.rgf.bg.ac.rs The Digital repository of The University of Belgrade Faculty of Mining and Geology archives faculty publications available in open access, as well as the employees' publications. - The Repository is available at: www.dr.rgf.bg.ac.rs PROCEEDINGS PROCEEDINGS Dragoslav Radojica ...Dragoslav Rakić, Radojica Lapčević, Irena Basarić Ikodinović, Dragan Lukić. "Geotehnički uslovi izgradnje tunela „Debelo brdo“ na autoputu E-80 Niš - Pločnik" in Četvrti Srpski kongres o putevima, 2-3. jun 2022., Beograd : Srpsko društvo za puteve Via Vita (2022)
-
Experimental determination of best performing cut in Lece underground mine
Slavko Torbica, Miodrag Duranović, Nenad Gramić, Veljko Lapčević, Miloš Čolović. "Experimental determination of best performing cut in Lece underground mine" in Podzemni radovi (2020). https://doi.org/10.5937/podrad1935049T
-
Maximizing the net present value by applying an optimal cut-off grade for long-term planning of the copper open pits
Kržanović Daniel, Kolonja Božo, Stevanović Dejan. "Maximizing the net present value by applying an optimal cut-off grade for long-term planning of the copper open pits" in Acta Montanistica Slovaca 20 no. 1, Kosice:Faculty of Mining, Ecology, Process Control and Geotechnologies (FBERG), Technical University of Kosice (2015): 49-61