Construction of E75 highway section through Grdelica gorge was one of the most demanding projects realized in recent Serbian history. The alignment approximately 25 km long consists of several tens of bridges, two tunnels, three galleries and cuts with total length of 6 km. The alignment passes through highly anisotropic Palaeozoic schist rock formation of different weathering grades. This study focuses on shear strength properties of discontinuities, which are found to be the critical feature contributing to the occurrence ...
Dušan Berisavljević, Zoran Berisavljević, Svetlana Melentijević. "The shear strength evaluation of rough and infilled joints and its indications for stability of rock cutting in schist rock mass" in Bulletin of engineering geology and the environment, Springer (2022). https://doi.org/10.1007/s10064-022-02580-8