Risk Evaluation: Brief Review and Innovation Model Based on Fuzzy Logic and MCDM
Stevan Djenadic, Milos Tanasijevic, Predrag Jovancic, Dragan Ignjatovic, Dejan Petrovic, Ugljesa Bugaric (2022)The risk assessment of engineering systems represents an important part of the quality of service and dependability. The existing methods for risk evaluation use crisp sets for rating partial indicators’ proposition and their cumulative products as an overall indicator. In this paper, existing FMEA and FMECA methods have been improved using the fuzzy expert system for calculating the risk priority number. The application of fuzzy logic allows the use of linguistic descriptions for risk analysis. In this way, the ...Stevan Djenadic, Milos Tanasijevic, Predrag Jovancic, Dragan Ignjatovic, Dejan Petrovic, Ugljesa Bugaric. "Risk Evaluation: Brief Review and Innovation Model Based on Fuzzy Logic and MCDM" in Mathematics, MDPI AG (2022). https://doi.org/10.3390/math10050811
-
Development of the Cost-Based Model for Monitoring the Lifetime of the Earth Moving Machines
This paper presents the model for the identification of reference points on the lifetime curve of engineering systems. This curve commonly represents the increase and decline of failure in relation to time. A direct correlation between failure rate and costs is assumed in this paper, therefore, statistical and empirical analysis of costs provided reference points. This approach is used for positioning stages of the engineering system’s lifetime with a minimal number of failures and costs, regardless of whether these ...Electrical and Electronic Engineering,Industrial and Manufacturing Engineering, Control and Optimization, Mechanical Engineering, Computer Science (miscellaneous), Control and Systems EngineeringUgljesa Bugarić, Milos Tanasijević, Stevan Djenadić, Dragan Ignjatović, Ivan Janković. "Development of the Cost-Based Model for Monitoring the Lifetime of the Earth Moving Machines" in Machines, MDPI AG (2022). https://doi.org/10.3390/machines10110995
-
Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine
Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović (2019)Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availability is an overall indicator and contains partial indicators that are oriented towards reliability, maintenance, and logistical support. Availability presents a variable value and changes in time and space. Usually, availability is shown as the ...... Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine Stevan Djenadic 1,*, Dragan Ignjatovic 1, Milos Tanasijevic 1, Ugljesa Bugaric 2, Ivan Jankovic 3 and Tomislav Subaranovic 1 1 Faculty of Mining and Geology, University of Belgrade, 11000 Belgrade, Serbia; dragan.ignjatovic@rgf ...
... Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine Stevan Djenadic !*, Dragan Ignjatovic !, Milos Tanasijevic 1, Ugljesa Bugaric 7, Ivan Jankovic > and Tomislav Subaranovic ! 1 Faculty of Mining and Geology, University of Belgrade, 11000 Belgrade, Serbia; dragan.ignjatovic@rgf ...
... Based on Max–Min Composition. Qual. Reliab. Eng. Int. 2013, 29, 317–326. [CrossRef] 14. Tanasijevic, M.; Ivezic, D.; Jovancic, P.; Ignjatovic, D.; Bugaric, U. Dependability assessment of open-pit mines equipment—Study on the bases of fuzzy algebra rules. Eksploat. Niezawodn. Maint. Reliab. 2013, 15, ...Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović. "Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine" in Energies, MDPI AG (2019). https://doi.org/10.3390/en12214044
-
A Model for Determining the Dependability of Continuous Subsystems in Coal Mines Using the Fuzzy Logic Approach
Nikola Stanić, Miljan Gomilanović, Petar Marković, Daniel Krzanović, Aleksandar Doderović, Saša Stepanović (2024)This study presents a unique model for assessing the dependability of continuous parts of combined systems in open-pit mining through the application of fuzzy logic. Continuous sub-systems as part of the combined system of coal exploitation in surface mines have the basic function of ensuring safe operation, high capacity with high reliability, and low costs. These subsystems are usually part of the thermal power plant’s coal supply system and ensure stable fuel supply. The model integrates various independent partial ...fuzzy logic, max-min composition, continuous part of combined system (CCS), open pit, mining, dependabilityNikola Stanić, Miljan Gomilanović, Petar Marković, Daniel Krzanović, Aleksandar Doderović, Saša Stepanović. "A Model for Determining the Dependability of Continuous Subsystems in Coal Mines Using the Fuzzy Logic Approach" in Applied Sciences, Basel, August 2024, MDPI (2024). https://doi.org/https://doi.org/10.3390/app14177947
-
Application of the Fuzzy Model in the Evaluation and Selection of Hydraulic Excavators on Open-Pit Lignite Mine
Stevan Đenadić, Miloš Tanasijević, Vladimir Milisavljević, Dragan Ignjatović, Predrag Jovančić (2021)The production of lignite in large open-pit mines is mainly performed with continuously operating equipment, where bucket-wheel excavators, bucket-chain excavators, belt conveyors, and spreaders are the basic machines. Smaller machines, usually of discontinuous operating nature, are commonly categorized as auxiliary machines. This paper presents the research related to the analysis of auxiliary machine parameters with the case study for a hydraulic excavator. The purpose of the analysis was to develop a model of rating quality of service of the ...Stevan Đenadić, Miloš Tanasijević, Vladimir Milisavljević, Dragan Ignjatović, Predrag Jovančić. "Application of the Fuzzy Model in the Evaluation and Selection of Hydraulic Excavators on Open-Pit Lignite Mine" in SSRN Electronic Journal, Elsevier BV (2021). https://doi.org/10.2139/ssrn.3945617
-
Determining the Availability of Continuous Systems at Open Pits Applying Fuzzy Logic
This work presents a model for determining the availability of continuous systems at open pits by applying fuzzy logic and fuzzy inference systems. The applied model was formed by the synthesis of independent partial indicators of availability. The model is based on an expert system for assessing the availability of continuous mining systems. The availability of the system, as a complex state parameter, is decomposed into the partial indicators, reliability, and convenience of maintenance, and the fuzzy compositions, used ...системи, континуални систем експоатације, површински коп, рударство, расположивост, фази логика, max–min композиција, min–max композицијаMiljan Gomilanović, Miloš Tanasijević, Saša Stepanović. "Determining the Availability of Continuous Systems at Open Pits Applying Fuzzy Logic" in Energies, MDPI AG (2022). https://doi.org/10.3390/en15186786
-
A Model for Determining Fuzzy Evaluations of Partial Indicators of Availability for High-Capacity Continuous Systems at Coal Open Pits Using a Neuro-Fuzzy Inference System
This paper presents a model for determining fuzzy evaluations of partial indicators of the availability of continuous systems at coal open pits using a neuro-fuzzy inference system. The system itself is a combination of fuzzy logic and artificial neural networks. The system availability is divided into partial indicators. By combining the fuzzy logic and artificial neural networks, a model is obtained that has the ability to learn and uses expert judgment for that learning. This paper deals with the ...системи, континуални системи експлоатације (роторни багер-транспортер-дробилично постројење), рударство, расположивост, меко рачунарство, фази логика, ANN, ANFISMiljan Gomilanović, Miloš Tanasijević, Saša Stepanović, Filip Miletić. "A Model for Determining Fuzzy Evaluations of Partial Indicators of Availability for High-Capacity Continuous Systems at Coal Open Pits Using a Neuro-Fuzzy Inference System" in Energies, MDPI AG (2023). https://doi.org/10.3390/en16072958
-
Fuzzy Model for Risk Assessment of Machinery Failures
The main goal of this research was the development of an algorithm for the implementation of negative risk parameters in a synthesis model for a risk level assessment for a specific machine used in the mining industry. Fuzzy sets and fuzzy logic theory, in combination with statistical methods, were applied to analyze the time picture state of the observed machine. Fuzzy logic is presented through fuzzy proposition and a fuzzy composition module. Using these tools, the symmetric position of the ...... approach to dependability performance evaluation. Qual. Reliab. Eng. Int. 2008, 24, 779–792. [CrossRef] 27. Tanasijevic, M.; Jovancic, P.; Ivezic, D.; Bugaric, U.; Djuric, R. A fuzzy-based decision support model for effectiveness evaluation—A case study of examination of bulldozers. Int. J. Ind. Eng. Theory ...
... using fuzzy sets and evidential reasoning. Reliab. Eng. Syst. Safe. 1995, 47, 103–118. [CrossRef] 34. Djenadic, S.; Ignjatovic, D.; Tanasijevic, M.; Bugaric, U.; Jankovic, I.; Subaranovic, T. Development of the availability concept by using fuzzy theory with AHP correction, a Case study: Bulldozers in ...Dejan V. Petrović, Miloš Tanasijević, Saša Stojadinović, Jelena Ivaz, Pavle Stojković. "Fuzzy Model for Risk Assessment of Machinery Failures" in Symmetry, MDPI AG (2020). https://doi.org/10.3390/sym12040525
-
Selection of Artificial Lift Methods: A Brief Review and New Model Based on Fuzzy Logic
Miroslav Crnogorac, Miloš Tanasijević, Dušan Danilović, Vesna Karović Maričić, Branko Leković (2020)Artificial lift methods have applications in oil wells where oil production is no longer possible due to natural reservoir energy, so this necessary energy is added by introducing lift methods. In order to achieve optimum production, the selection of an artificial lift method is very important. This paper uses fuzzy logic as a mathematical and conceptual model for selection of the optimal artificial lift method. The outcome or IF-THEN rules, as the central part of the model, is based ...... on Max–Min Composition. Qual. Reliab. Eng. Int. 2013, 29, 317–326. [CrossRef] 23. Tanasijević, M.; Ivezić, D.; Jovančić, P.; Ignjatović, D.; Bugaric, U. Dependability assesment of open-pit mines equpment - Study on the bases of fuzzy algebra rules. Eksploat. Niezawodn-Maint. Reliab. 2013, 15, 66–74 ...Miroslav Crnogorac, Miloš Tanasijević, Dušan Danilović, Vesna Karović Maričić, Branko Leković. "Selection of Artificial Lift Methods: A Brief Review and New Model Based on Fuzzy Logic" in Energies, MDPI AG (2020)
-
Концепт расположивости при дефинисању ефикасног одржавања помоћне механизације на површинским коповима
Radiša D. Đurić (2016-05-30)Оцена расположивости представља основну компоненту уинжењерском управљању опремом. Расположивост је свеобухватни концепткоји представља меру употребног квалитета техничких система, који садржичитаву серију парцијалних индикатора који се односе на време у раду ивреме у отказу система као и на његову функционалну погодност. Овадисертација даје структурну анализу парцијалних индикатора као и развојмодела њихове синтезе на ниво расположивости. Поменути подаци имајухибридни карактер (измерени и експертски добијени) и њихова интеграцијаи синтеза је остварена коришћењем фази пропозиције и фази закључивања.Овакав приступ омогућава оцену техничког система ...управљање опремом, инжењерство одржавања,расположивост, фази закључивање, прикупљање података, булдозер... 2006.01.006. Bugaric, U., Tanasijevic, M., Polovina, D., Ignjatovic, D., Jovancic, P., 2012. Lost production costs of the overburden excavation system caused by rubber belt failure. Eksploatacja i Niezawodnosc – Maintenance and Reliability; 14(4): 333-341 Tanasijevic, M., Bugaric, U., Jovancic ...
... даљем тексту ОПП) [Jaarsveld и остали, 2011; Zhou и остали, 2007], у смислу смањења трошкова одржавања и побољшање ефикасности активности одржавања [Bugaric и остали, 2012; Jaarsveld и остали, 2011], у смислу истраживања зависности између поузданости и појава као што су умор [Tanasijevic и остали, 2012; ...
... Ризик за животну средину и раднике су високи. Ове чињенице наглашавају значај анализе поузданости у раду рударске опреме [Barabady и остали, 2008; Bugaric и остали, 2012; Tanasijevic и остали, 2012; Uzgoren и остали, 2010]. Сагласно томе, у наредном тексту су дати примери израчунавања поузданости и р ...Radiša D. Đurić. "Концепт расположивости при дефинисању ефикасног одржавања помоћне механизације на површинским коповима" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2016-05-30)
-
The Fuzzy–AHP Synthesis Model for Energy Security Assessment of the Serbian Natural Gas Sector
Natural gas is used for the production of almost 20% of total energy today. The natural gas security of the Republic of Serbia is an urgent strategic, political and security issue. Serbia is one of the most vulnerable countries in Southeast Europe, because it only has one supply route. This study is a contribution to efforts to better understand the factors affecting energy security through the implementation of a new methodology based on the fuzzy–AHP synthesis model for measuring ...... ity as criteria for bucket wheel excavator revitalization. J. Sci. Ind. Res. 2011, 70, 13–19. 65. Djenadic, S.; Ignjatovic, D.; Tanasijevic, M.; Bugaric, U.; Jankovic, I.; Subaranovic, T. Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in ...Aleksandar R. Madžarević, Dejan D. Ivezić, Miloš L. Tanasijević, Marija A. Živković. "The Fuzzy–AHP Synthesis Model for Energy Security Assessment of the Serbian Natural Gas Sector" in Symmetry, MDPI AG (2020). https://doi.org/10.3390/sym12060908
-
Развој модела употребног квалитета помоћне механизације на површинским коповима лигнита
Драгица Јагодић Крунић (2021)Тренутно стање помоћне механизације на површинским коповима лигнита је незадовољавајуће узроковано пре свега старошћу и неблаговременом заменом машима услед чега је расположивост недовољна а трошкови експлоатације и одржавања високи. Тренутно стање и захтеви који се постављају пред ове машине указују на неопходност оптимизације процеса управљања помоћном механизацијом. Одређивање оптималног времена замене и преосталих могућности је најодговорнији управљачки задатак који треба да буде заснован на свеобухватном сагледавању економских, техничких и других узрочно последичних веза. Са економског аспекта гледано треба одржавати ...помоћна механизација, употребни квалитет, ефективност, расположивост, сигурност функционисања, ризик, трошкови животног циклуса, фази логика, Монте Карло метода... 1586. [95] Bugaric, U., Tanasijevic, M., Polovina, D., Ignjatovic, D., Jovancic, P., Lost production costs of the overburden excavation system caused by rubber belt failure, Eksploatacja i Niezawodnosc – Maintenance and Reliability, 2012, 14(4): 333-341. [96] Tanasijevic, M., Bugaric, U., Jovancic ...Драгица Јагодић Крунић. Развој модела употребног квалитета помоћне механизације на површинским коповима лигнита, Београд : [Д. Јагодић Крунић], 2021