Претрага
282 items
-
Development of the hybrid MCDM model for evaluating and selecting bucket wheel excavators for the modernization process
This paper presents a methodology for evaluating and ranking different bucket wheel excavators (BWE) for determining which machine should enter in the process of revitalization and modernization. Various multicriteria methods are used. Combining them achieves the best effect when choosing BVE for the modernization process. AHP, TOPSIS, VIKOR, and PROMETHEE methods are used. The hybrid models are developed from the multi-criteria decision making (MCDM) methods and they are used to evaluate the basic indicators that characterize the operation of ...Snezana Savkovic, Predrag Jovancic, Stevan Djenadic, Milos Tanasijevic, Filip Miletic. "Development of the hybrid MCDM model for evaluating and selecting bucket wheel excavators for the modernization process" in Expert Systems with Applications, Elsevier BV (2022). https://doi.org/10.1016/j.eswa.2022.117199
-
Risk Evaluation: Brief Review and Innovation Model Based on Fuzzy Logic and MCDM
Stevan Djenadic, Milos Tanasijevic, Predrag Jovancic, Dragan Ignjatovic, Dejan Petrovic, Ugljesa Bugaric (2022)The risk assessment of engineering systems represents an important part of the quality of service and dependability. The existing methods for risk evaluation use crisp sets for rating partial indicators’ proposition and their cumulative products as an overall indicator. In this paper, existing FMEA and FMECA methods have been improved using the fuzzy expert system for calculating the risk priority number. The application of fuzzy logic allows the use of linguistic descriptions for risk analysis. In this way, the ...Stevan Djenadic, Milos Tanasijevic, Predrag Jovancic, Dragan Ignjatovic, Dejan Petrovic, Ugljesa Bugaric. "Risk Evaluation: Brief Review and Innovation Model Based on Fuzzy Logic and MCDM" in Mathematics, MDPI AG (2022). https://doi.org/10.3390/math10050811
-
Application of the Fuzzy Model in the Evaluation and Selection of Hydraulic Excavators on Open-Pit Lignite Mine
Stevan Đenadić, Miloš Tanasijević, Vladimir Milisavljević, Dragan Ignjatović, Predrag Jovančić (2021)The production of lignite in large open-pit mines is mainly performed with continuously operating equipment, where bucket-wheel excavators, bucket-chain excavators, belt conveyors, and spreaders are the basic machines. Smaller machines, usually of discontinuous operating nature, are commonly categorized as auxiliary machines. This paper presents the research related to the analysis of auxiliary machine parameters with the case study for a hydraulic excavator. The purpose of the analysis was to develop a model of rating quality of service of the ...Stevan Đenadić, Miloš Tanasijević, Vladimir Milisavljević, Dragan Ignjatović, Predrag Jovančić. "Application of the Fuzzy Model in the Evaluation and Selection of Hydraulic Excavators on Open-Pit Lignite Mine" in SSRN Electronic Journal, Elsevier BV (2021). https://doi.org/10.2139/ssrn.3945617
-
A Fuzzy Expert Model for Availability Evaluation
Each technical system within itself carries the great potential danger of possible occurrence of failure and damages. Mining machines are characteristic by great investment values, costs of unplanned shutdowns, complex working conditions, and environment and workers hazards. Systematic monitoring of the mining machinery is of great importance for the management of the mining companies. Availability is the overall concept of quality of service. Includes information regard to operating state, an idle state, a standby state and shut down. The ...... .bg.ac.rs Radisa Djuric TPPs-OCMs Kostolac Electric Power Industry of Serbia Kostolac, Serbia radisa.duric@te-ko.rs Predrag Jovancic Faculty of Mining and Geology University of Belgrade Belgrade, Serbia predrag.jovancic@rgf.bg.ac.rs Abstract—Each technical system ...
... Evaluation Dejan Ivezić, Miloš Tanasijević, Predrag Jovančić, Radiša Đurić Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] A Fuzzy Expert Model for Availability Evaluation | Dejan Ivezić, Miloš Tanasijević, Predrag Jovančić, Radiša Đurić | Proceedings of the ...
... and synthesis using fuzzy sets and evidential reasoning. Reliability Engineering and System Safety, 47(2), 103-118, 1995. [9] Ignjatovic, D., Jovancic, P., Optimization of operation and costs of auxiliary mechanization in order to increase the utilization of overburden and coal systems on the open ...Dejan Ivezić, Miloš Tanasijević, Predrag Jovančić, Radiša Đurić. "A Fuzzy Expert Model for Availability Evaluation" in Proceedings of the 2019 20th International Carpathian Control Conference (ICCC), AGH University of Science and Technology, Kraków - Wieliczka, Poland (2019)
-
Effectiveness Analysis of Different Bucket-wheel Excavators
Coal production in open-pit lignite mines in the Republic of Serbia is performed with continuous work systems. In addition to coal production, the same systems are used for the exploitation of large quantities of overburden. According to the reliability concept, continuous systems are in linear connection. If the failure occurs in one part of the system, that will produce a downtime of the entire system. The initial and most important factor of continuous systems is the bucket-wheel excavator. It ...Stevan Đenadić, Predrag Jovančić, Dragan Ignjatović, Miloš Tanasijević, Filip Miletić. "Effectiveness Analysis of Different Bucket-wheel Excavators" in 8th International Conference Mining and Environmental Protection, Sokobanja, 22-25 September 2021, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2021)
-
Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine
Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović (2019)Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availability is an overall indicator and contains partial indicators that are oriented towards reliability, maintenance, and logistical support. Availability presents a variable value and changes in time and space. Usually, availability is shown as the ...... 13. Tanasijevic, M.; Ivezic, D.; Jovancic, P.; Catic, D.; Zlatanovic, D. Study of Dependability Evaluation for Multi-hierarchical Systems Based on Max–Min Composition. Qual. Reliab. Eng. Int. 2013, 29, 317–326. [CrossRef] 14. Tanasijevic, M.; Ivezic, D.; Jovancic, P.; Ignjatovic, D.; Bugaric, U. ...
... PA, USA, 2000. 29. Djenadic, S.; Jovancic, P.; Ignjatovic, D.; Miletic, F.; Jankovic, I. Analiza primene višekriterijumskih metoda u optimizaciji izbora hidrauličnih bagera na površinskim kopovima. Tehnika 2019, 70, 369–377. [CrossRef] 30. Ignjatovic, D.; Jovancic, P. Optimisation of Operation and ...
... fuzzy methodology an introductory overview. Fuzzy Sets Syst. 1996, 83, 113–133. [CrossRef] 10. Miodragovic, R.; Tanasijevic, M.; Mileusnic, Z.; Jovancic, P. Effectiveness assessment of agricultural machinery based on fuzzy sets theory. Expert Syst. Appl. 2012, 39, 8940–8946. [CrossRef] 11. Ebramhimipour ...Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović. "Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine" in Energies, MDPI AG (2019). https://doi.org/10.3390/en12214044
-
The optimization of auxiliary machinery in open-cast lignite mines: a case study of bulldozers
One of the most important prerequisites for the successful operation of the open-cast lignite mine is to carry out all the auxiliary works timely with the necessary quality. The most important and most commonly used auxiliary machines are bulldozers. Engaging time of bulldozers use is in direct relation with the coefficients of the time and capacity utilization of the continuous system for the excavation of coal and tailings, which indicates their importance. More than 100 bulldozers have been hired ...... Ignjatović, Predrag Jovančić, Stevan Đenadić, Ivan Janković, Ivica Ristović Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] The optimization of auxiliary machinery in open-cast lignite mines: a case study of bulldozers | Dragan Ignjatović, Predrag Jovančić, Stevan ...
... 297-305. Life Cycle Asset Management, Life Cycle Engineering, Inc. Available online: www.LCE.com 6. Jankovic, I.; Djenadic, S.; Ignjatovic, D.; Jovancic, P.; Subaranovic, T.; Ristovic, I. Multi-Criteria Approach for Selecting Optimal Dozer Type in Open-Cast Coal Mining. Energies 2019, 12, 2245. https://doi ...
... September 2019, Vrdnik, Serbia THE OPTIMIZATION OF AUXILIARY MACHINERY IN OPEN-CAST LIGNITE MINES: A CASE STUDY OF BULLDOZERS Dragan Ignjatović!, Predrag Jovančić!, Stevan Đenadić!, Ivan Janković?, Ivica Ristović! !- University ог Belgrade – Faculty ог Mining and Geology, Belgrade, SERBIA, dragan ...Dragan Ignjatović, Predrag Jovančić, Stevan Đenadić, Ivan Janković, Ivica Ristović. "The optimization of auxiliary machinery in open-cast lignite mines: a case study of bulldozers" in 7th International Symposium Mining and Environmental Protection, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2019)
-
Multi-Criteria Approach for Selecting Optimal Dozer Type in Open-Cast Coal Mining
Ivan Janković, Stevan Đenadić , Dragan Ignjatović , Predrag Jovančić , Tomislav Šubaranović, Ivica Ristović (2019)... Article Multi-Criteria Approach for Selecting Optimal Dozer Type in Open-Cast Coal Mining Ivan Jankovic 1, Stevan Djenadic 2, Dragan Ignjatovic 2, Predrag Jovancic 2, Tomislav Subaranovic 2 and Ivica Ristovic 2,* 1 Ministry of Mining and Energy, 11000 Belgrade, Serbia; ivan.jankovic@mre.gov.rs 2 Faculty ...
... Article Multi-Criteria Approach for Selecting Optimal Dozer Type in Open-Cast Coal Mining Ivan Jankovic 1, Stevan Djenadic 7, Dragan Ignjatovic *, Predrag Jovancic 2, Tomislav Subaranovic 2 and Ivica Ristovic *’* 1 2 Ministry of Mining and Energy, 11000 Belgrade, Serbia; ivan.jankovic@mre.gov.rs Faculty ...
... Mining and Geology, University of Belgrade, 11000 Belgrade, Serbia; stevan.djenadic@rgf.bg.ac.rs (S.D.); dragan.ignjatovic@rgf.bg.ac.rs (D.I.); predrag jovancic@rgf.bg.ac.rs (PJ.); tomislav.subaranovic@ref.bg.ac.rs (T.S.) Correspondence: ivica.ristovic@rgf.bg.ac.rs; Tel.: +381-11-3241-121 check for Received: ...Ivan Janković, Stevan Đenadić , Dragan Ignjatović , Predrag Jovančić , Tomislav Šubaranović, Ivica Ristović . "Multi-Criteria Approach for Selecting Optimal Dozer Type in Open-Cast Coal Mining" in Energies, MDPI (2019). https://doi.org/https://doi.org/10.3390/en12122245
-
Indeksi kontrole održavanja i korišćenja rotornog bagera
Razvoj površinske eksploatacije se u velikom stepenu zasniva na svestranoj mehanizaciji rudarskih radova. Kako bi se zadovoljili potrebni kapaciteti, neophodna je primena savremene mehanizacije, velikih kapaciteta i pouzdanosti u radu. Naime, sa stepenom povećanja mehanizovanosti radova smanjuje se broj zaposlenih radnika, povećava produktivnost rada, smanjuju troškovi po jedinici proizvoda, a samim tim i povećava ekonomičnost površinske eksploatacije. Predmet istraživanja su rotorni bageri SRs 1200 koji predstavljaju samohodne mašine kontinuiranog dejstva namenjene za otkopavanje jalovine i korisne supstance na površinskim ...Jovana Mitrović, Predrag Jovančić, Dragan Ignjatović, Stevan Đenadić, Filip Miletić. "Indeksi kontrole održavanja i korišćenja rotornog bagera" in XI Međunarodna konferencija "Ugalj i kritični minerali 2023", CCM 2023, Zlatibor, 11-14. oktobar 2023., Beograd : Jugoslovenski komitet za površinsku eksploataciju (2023)
-
Determining the Availability of Continuous Systems at Open Pits Applying Fuzzy Logic
This work presents a model for determining the availability of continuous systems at open pits by applying fuzzy logic and fuzzy inference systems. The applied model was formed by the synthesis of independent partial indicators of availability. The model is based on an expert system for assessing the availability of continuous mining systems. The availability of the system, as a complex state parameter, is decomposed into the partial indicators, reliability, and convenience of maintenance, and the fuzzy compositions, used ...системи, континуални систем експоатације, површински коп, рударство, расположивост, фази логика, max–min композиција, min–max композицијаMiljan Gomilanović, Miloš Tanasijević, Saša Stepanović. "Determining the Availability of Continuous Systems at Open Pits Applying Fuzzy Logic" in Energies, MDPI AG (2022). https://doi.org/10.3390/en15186786
-
Izbor rotornih bagera za proces revitalizacije: primer rotornih bagera SRs 1200 u rudarskom basenu Kolubara
Predrag Jovančić, Dragan Ignjatović, Stevan Đenadić, Filip Miletić, Goran Todorović, Dragan Novaković (2020)Revitalizacija je proces ili skup tehničkih zahvata na mašini kojim se vrši zamena svih dotrajalih ili oštećenih delova metalne konstrukcije. Sastavni deo procesa revitalizacije je i modernizacija zastarele elektro-mašinske opreme. Principi revitalizacije sasvim sigurno nisu sadržani u okviru redovnog godišnjeg ili dnevnog održavanja. Oni predstavljaju održavanje onih veličina koje su značajne za mašinu kao celinu (u ovom slučaju rotorni bager). U ovom radu su analizirani rotorni bageri oznake SRs 1200. Na površinskim kopovima rudarskog basena Kolubara takvih bagera ima ...Predrag Jovančić, Dragan Ignjatović, Stevan Đenadić, Filip Miletić, Goran Todorović, Dragan Novaković. "Izbor rotornih bagera za proces revitalizacije: primer rotornih bagera SRs 1200 u rudarskom basenu Kolubara" in XIV Međunarodna konferencija OMC 2020, Zlatibor, Srbija, 14-17. oktobar 2020., Jugoslovenski komitet za površinsku eksploataciju (2020)
-
Ostvarivanje dobiti pri uvođenju sistema agregatnih zamena na osnovnoj rudarskoj mehanizaciji površinskih kopova EPS
Jedan od osnovnih zadataka na površinskim kopovima uglja je ostvarivanje zadovoljavajućeg vremenskog i kapacitetnog iskorišćenja kontinualnih sistema. Da bi se to postiglo, neophodno je izvršiti izmene u postojećoj strategiji održavanja. Preduslov je uvođenje agregatne zamene vitalnih delova na rudarskim mašinama. Benefiti su višestruki. Očekivani rezultati ovakvog pristupa su: smanjenje zastoja i povećanje vremena rada; direktne materijalne uštede; bolja organizacija rada; racionalizaciju radioničkih i magacinskih kapaciteta; povećanje vrednosti mašina. Da bi se uvela agregatna zamena neophodne su investicije za nabavku ...Predrag Jovančić, Ignjatović Dragan, Đenadić Stevan. "Ostvarivanje dobiti pri uvođenju sistema agregatnih zamena na osnovnoj rudarskoj mehanizaciji površinskih kopova EPS" in X Međunarodna konferencija UGALJ, Zlatibor, Srbija, 13-16. Oktobar 2021., Jugoslovenski komitet za površinsku eksploataciju (2021)
-
Priprema ruda antimona
Lazić Predrag (2014)Lazić Predrag. "Priprema ruda antimona" in Srpsko rudarstvo i geologija u drugoj polovini XX veka, Beograd:Akademija inženjerskih nauka Srbije, Matica srpska, Rudarski institut (2014): 465-468
-
Priprema ruda olova i cinka
Lazić Predrag (2014)Lazić Predrag. "Priprema ruda olova i cinka" in Srpsko rudarstvo i geologija u drugoj polovini XX veka, Beograd:Akademija inženjerskih nauka Srbije, Matica srpska, Rudarski institut (2014): 479-495
-
Postrojenja za pripremu ruda metala i uglja
Lazić Predrag (2014)Lazić Predrag. "Postrojenja za pripremu ruda metala i uglja" in Srpsko rudarstvo i geologija u drugoj polovini XX veka, Beograd:Akademija inženjerskih nauka Srbije, Matica srpska, Rudarski institut (2014): 527-534
-
[Без наслова]
Lazić Predrag (2012)Lazić Predrag. "[Без наслова]" in zbornik radova VIII Kolokvijuma o pripremi mineralnih sirovina, Beograd: (2012)
-
Opravdanost i domen primene zasipavanja otkopanog prostora pri podzemnoj eksploataciji ležišta uglja
Predrag Dimovski (1992)Predrag Dimovski. Opravdanost i domen primene zasipavanja otkopanog prostora pri podzemnoj eksploataciji ležišta uglja, Beograd:Rudarsko-geološki fakultet, 1992
-
Ispitivanje uslova rada čekićne drobilice na efekte drobljenja i habanje drobećih površina pri usitnjavanju krečnjaka
Predrag Lalić (1991)Predrag Lalić. Ispitivanje uslova rada čekićne drobilice na efekte drobljenja i habanje drobećih površina pri usitnjavanju krečnjaka, Beograd:Rudarsko-geološki fakultet, 1991
-
Utvrđivanje korelacije između fizičko-mehaničkih svojstava mermera i efekta drobljenja
Predrag Lazić (1994)Predrag Lazić. Utvrđivanje korelacije između fizičko-mehaničkih svojstava mermera i efekta drobljenja, Beograd:Rudarsko-geološki fakultet, 1994
-
Uticaj uspora HE Đerdap I na pojavu šteta usled visokih nivoa podzemnih voda na području Velikoselskog rita
Predrag Pajić (2012)Predrag Pajić. Uticaj uspora HE Đerdap I na pojavu šteta usled visokih nivoa podzemnih voda na području Velikoselskog rita, Beograd:Rudarsko-geološki fakultet, 2012