Претрага
25 items
-
Development of the hybrid MCDM model for evaluating and selecting bucket wheel excavators for the modernization process
This paper presents a methodology for evaluating and ranking different bucket wheel excavators (BWE) for determining which machine should enter in the process of revitalization and modernization. Various multicriteria methods are used. Combining them achieves the best effect when choosing BVE for the modernization process. AHP, TOPSIS, VIKOR, and PROMETHEE methods are used. The hybrid models are developed from the multi-criteria decision making (MCDM) methods and they are used to evaluate the basic indicators that characterize the operation of ...Snezana Savkovic, Predrag Jovancic, Stevan Djenadic, Milos Tanasijevic, Filip Miletic. "Development of the hybrid MCDM model for evaluating and selecting bucket wheel excavators for the modernization process" in Expert Systems with Applications, Elsevier BV (2022). https://doi.org/10.1016/j.eswa.2022.117199
-
Risk Evaluation: Brief Review and Innovation Model Based on Fuzzy Logic and MCDM
Stevan Djenadic, Milos Tanasijevic, Predrag Jovancic, Dragan Ignjatovic, Dejan Petrovic, Ugljesa Bugaric (2022)The risk assessment of engineering systems represents an important part of the quality of service and dependability. The existing methods for risk evaluation use crisp sets for rating partial indicators’ proposition and their cumulative products as an overall indicator. In this paper, existing FMEA and FMECA methods have been improved using the fuzzy expert system for calculating the risk priority number. The application of fuzzy logic allows the use of linguistic descriptions for risk analysis. In this way, the ...Stevan Djenadic, Milos Tanasijevic, Predrag Jovancic, Dragan Ignjatovic, Dejan Petrovic, Ugljesa Bugaric. "Risk Evaluation: Brief Review and Innovation Model Based on Fuzzy Logic and MCDM" in Mathematics, MDPI AG (2022). https://doi.org/10.3390/math10050811
-
Determining the Availability of Continuous Systems at Open Pits Applying Fuzzy Logic
This work presents a model for determining the availability of continuous systems at open pits by applying fuzzy logic and fuzzy inference systems. The applied model was formed by the synthesis of independent partial indicators of availability. The model is based on an expert system for assessing the availability of continuous mining systems. The availability of the system, as a complex state parameter, is decomposed into the partial indicators, reliability, and convenience of maintenance, and the fuzzy compositions, used ...системи, континуални систем експоатације, површински коп, рударство, расположивост, фази логика, max–min композиција, min–max композицијаMiljan Gomilanović, Miloš Tanasijević, Saša Stepanović. "Determining the Availability of Continuous Systems at Open Pits Applying Fuzzy Logic" in Energies, MDPI AG (2022). https://doi.org/10.3390/en15186786
-
A Model for Determining Fuzzy Evaluations of Partial Indicators of Availability for High-Capacity Continuous Systems at Coal Open Pits Using a Neuro-Fuzzy Inference System
This paper presents a model for determining fuzzy evaluations of partial indicators of the availability of continuous systems at coal open pits using a neuro-fuzzy inference system. The system itself is a combination of fuzzy logic and artificial neural networks. The system availability is divided into partial indicators. By combining the fuzzy logic and artificial neural networks, a model is obtained that has the ability to learn and uses expert judgment for that learning. This paper deals with the ...системи, континуални системи експлоатације (роторни багер-транспортер-дробилично постројење), рударство, расположивост, меко рачунарство, фази логика, ANN, ANFISMiljan Gomilanović, Miloš Tanasijević, Saša Stepanović, Filip Miletić. "A Model for Determining Fuzzy Evaluations of Partial Indicators of Availability for High-Capacity Continuous Systems at Coal Open Pits Using a Neuro-Fuzzy Inference System" in Energies, MDPI AG (2023). https://doi.org/10.3390/en16072958
-
Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine
Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović (2019)Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availability is an overall indicator and contains partial indicators that are oriented towards reliability, maintenance, and logistical support. Availability presents a variable value and changes in time and space. Usually, availability is shown as the ...... Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine Stevan Djenadic 1,*, Dragan Ignjatovic 1, Milos Tanasijevic 1, Ugljesa Bugaric 2, Ivan Jankovic 3 and Tomislav Subaranovic 1 1 Faculty of Mining and Geology, University of Belgrade, 11000 Belgrade, Serbia; ...
... Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine Stevan Djenadic !*, Dragan Ignjatovic !, Milos Tanasijevic 1, Ugljesa Bugaric 7, Ivan Jankovic > and Tomislav Subaranovic ! 1 Faculty of Mining and Geology, University of Belgrade, 11000 Belgrade, Serbia; ...
... Reliab. Eng. Syst. Saf. 2006, 91, 10–19. [CrossRef] 12. Ivezic, D.; Tanasijevic, M.; Ignjatovic, D. Fuzzy Approach to Dependability Performance Evaluation. Qual. Reliab. Eng. Int. 2008, 24, 779–792. [CrossRef] 13. Tanasijevic, M.; Ivezic, D.; Jovancic, P.; Catic, D.; Zlatanovic, D. Study of Dependability ...Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović. "Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine" in Energies, MDPI AG (2019). https://doi.org/10.3390/en12214044
-
A Model for Determining the Dependability of Continuous Subsystems in Coal Mines Using the Fuzzy Logic Approach
Nikola Stanić, Miljan Gomilanović, Petar Marković, Daniel Krzanović, Aleksandar Doderović, Saša Stepanović (2024)This study presents a unique model for assessing the dependability of continuous parts of combined systems in open-pit mining through the application of fuzzy logic. Continuous sub-systems as part of the combined system of coal exploitation in surface mines have the basic function of ensuring safe operation, high capacity with high reliability, and low costs. These subsystems are usually part of the thermal power plant’s coal supply system and ensure stable fuel supply. The model integrates various independent partial ...fuzzy logic, max-min composition, continuous part of combined system (CCS), open pit, mining, dependabilityNikola Stanić, Miljan Gomilanović, Petar Marković, Daniel Krzanović, Aleksandar Doderović, Saša Stepanović. "A Model for Determining the Dependability of Continuous Subsystems in Coal Mines Using the Fuzzy Logic Approach" in Applied Sciences, Basel, August 2024, MDPI (2024). https://doi.org/https://doi.org/10.3390/app14177947
-
A fuzzy-based decision support model for effectiveness evaluation - a case study of examination of bulldozers
Effectiveness evaluation is one of the basic components of engineering asset management and maintenance engineering in general. Effectiveness is an overall concept representing a measurement of quality of service level for the analyzed engineering system. This concept contains a series of partial indicators relating to time in operation and time for maintenance activities, as well as functional properties of the system. This article describes the analysis and structuring of partial indicators, as well as the development of a model ...Miloš Tanasijević, Predrag Jovančić, Dejan Ivezić, Uglješa Bugarić, Radiša Đurić. "A fuzzy-based decision support model for effectiveness evaluation - a case study of examination of bulldozers" in International Journal of Industrial Engineering: Theory, Applications and Practice (2019)
-
A Fuzzy Expert Model for Availability Evaluation
Each technical system within itself carries the great potential danger of possible occurrence of failure and damages. Mining machines are characteristic by great investment values, costs of unplanned shutdowns, complex working conditions, and environment and workers hazards. Systematic monitoring of the mining machinery is of great importance for the management of the mining companies. Availability is the overall concept of quality of service. Includes information regard to operating state, an idle state, a standby state and shut down. The ...... Availability Evaluation Dejan Ivezic Faculty of Mining and Geology University of Belgrade Belgrade, Serbia dejan.ivezic@rgf.bg.ac.rs Milos Tanasijevic Faculty of Mining and Geology University of Belgrade Belgrade, Serbia milos.tanasijevic@rgf.bg.ac.rs Radisa Djuric TPPs-OCMs Kostolac ...
... Safety, 168, Pages 53-69, 2017. [4] NATO ARMP-4, Guidance for writing NATO r & m requirements documents (second ed.), ARMP-4, pp. 2-5, 1996. [5] Tanasijevic M., A fuzzy-based decision support model for evaluation of mining machinery. Full Papers Proceeding of International Conference, 48th International ...Dejan Ivezić, Miloš Tanasijević, Predrag Jovančić, Radiša Đurić. "A Fuzzy Expert Model for Availability Evaluation" in Proceedings of the 2019 20th International Carpathian Control Conference (ICCC), AGH University of Science and Technology, Kraków - Wieliczka, Poland (2019)
-
Local people's attitudes towards quality of environment in municipality of Bogatić
Bartula Mirjana, Ristić-Vakanjac Vesna, Vakanjac Boris, Ninkovic Milos. "Local people's attitudes towards quality of environment in municipality of Bogatić" in International Conference „Ecological Improvment of Devastated Sites for Sustainable Development“ – ECOIDS-2014, Beograd, Srbija:Faculty of Applied Ecology Futura (2014): 257-263
-
Adaptive neuro-fuzzy prediction of operation of the bucket wheel drive based on wear of cutting elements
The capacity of the rotor excavator depends largely on the operation of the subsystem for digging. There is a great contribution to the correct and sharp teeth when the capacity is the highest. In the function of time, the teeth become clogged due to abrasive wear, or changes in their geometric shape. To analyze the bucket wheel drive in depend on wear of the cutting elements in this study adaptive neuro fuzzy inference system (ANFIS) approach was implemented. ANFIS ...Filip Miletić, Predrag D. Jovančić, Milos Milovančević, Dragan Ignjatović. "Adaptive neuro-fuzzy prediction of operation of the bucket wheel drive based on wear of cutting elements" in Advances in Engineering Software, Elsevier BV (2020). https://doi.org/10.1016/j.advengsoft.2020.102824
-
Interpretation of Trace Element Chemistry of Zircons from Bor and Cukaru Peki: Conventional Approach and Random Forest Classification
Dina Klimentyeva, Milos Velojic , Albrecht Von Quadt, Shawn Hood. "Interpretation of Trace Element Chemistry of Zircons from Bor and Cukaru Peki: Conventional Approach and Random Forest Classification" in Geosciences (2022). https://doi.org/https://doi.org/10.3390/geosciences12110396
-
Development of the Cost-Based Model for Monitoring the Lifetime of the Earth Moving Machines
This paper presents the model for the identification of reference points on the lifetime curve of engineering systems. This curve commonly represents the increase and decline of failure in relation to time. A direct correlation between failure rate and costs is assumed in this paper, therefore, statistical and empirical analysis of costs provided reference points. This approach is used for positioning stages of the engineering system’s lifetime with a minimal number of failures and costs, regardless of whether these ...Electrical and Electronic Engineering,Industrial and Manufacturing Engineering, Control and Optimization, Mechanical Engineering, Computer Science (miscellaneous), Control and Systems EngineeringUgljesa Bugarić, Milos Tanasijević, Stevan Djenadić, Dragan Ignjatović, Ivan Janković. "Development of the Cost-Based Model for Monitoring the Lifetime of the Earth Moving Machines" in Machines, MDPI AG (2022). https://doi.org/10.3390/machines10110995
-
The Fuzzy–AHP Synthesis Model for Energy Security Assessment of the Serbian Natural Gas Sector
Natural gas is used for the production of almost 20% of total energy today. The natural gas security of the Republic of Serbia is an urgent strategic, political and security issue. Serbia is one of the most vulnerable countries in Southeast Europe, because it only has one supply route. This study is a contribution to efforts to better understand the factors affecting energy security through the implementation of a new methodology based on the fuzzy–AHP synthesis model for measuring ...... Syst. Appl. 2012, 39, 8940–8946. [CrossRef] 64. Tanasijevic, M.; Ivezic, D.; Ignjatovic, D.; Polovina, D. Dependability as criteria for bucket wheel excavator revitalization. J. Sci. Ind. Res. 2011, 70, 13–19. 65. Djenadic, S.; Ignjatovic, D.; Tanasijevic, M.; Bugaric, U.; Jankovic, I.; Subaranovic, T ...
... min–max composition rule and its superiority over the usual max–min composition. Fuzzy Sets Syst. 2008, 93, 319–329. [CrossRef] 52. Petrovic, D.; Tanasijevic, M.; Milic, V.; Lilic, N.; Stojadinovic, S.; Svrkota, I. Risk assessment model of mining equipment failure based on fuzzy logic. Expert Syst. Appl ...
... Quantifying, measuring, and strategizing energy security: Determining the most meaningful dimensions and metrics. Energy 2014, 76, 838–849. 56. Tanasijevic, M.; Zivkovic, M.; Ivezic, D.; Madzarevic, A. Model for Assessing the Security of Heat Supply. In Proceedings of the X IIPP Symposium, Serbia, Belgrade ...Aleksandar R. Madžarević, Dejan D. Ivezić, Miloš L. Tanasijević, Marija A. Živković. "The Fuzzy–AHP Synthesis Model for Energy Security Assessment of the Serbian Natural Gas Sector" in Symmetry, MDPI AG (2020). https://doi.org/10.3390/sym12060908
-
Indeksi kontrole održavanja i korišćenja rotornog bagera
Razvoj površinske eksploatacije se u velikom stepenu zasniva na svestranoj mehanizaciji rudarskih radova. Kako bi se zadovoljili potrebni kapaciteti, neophodna je primena savremene mehanizacije, velikih kapaciteta i pouzdanosti u radu. Naime, sa stepenom povećanja mehanizovanosti radova smanjuje se broj zaposlenih radnika, povećava produktivnost rada, smanjuju troškovi po jedinici proizvoda, a samim tim i povećava ekonomičnost površinske eksploatacije. Predmet istraživanja su rotorni bageri SRs 1200 koji predstavljaju samohodne mašine kontinuiranog dejstva namenjene za otkopavanje jalovine i korisne supstance na površinskim ...Jovana Mitrović, Predrag Jovančić, Dragan Ignjatović, Stevan Đenadić, Filip Miletić. "Indeksi kontrole održavanja i korišćenja rotornog bagera" in XI Međunarodna konferencija "Ugalj i kritični minerali 2023", CCM 2023, Zlatibor, 11-14. oktobar 2023., Beograd : Jugoslovenski komitet za površinsku eksploataciju (2023)
-
Application of the Fuzzy Model in the Evaluation and Selection of Hydraulic Excavators on Open-Pit Lignite Mine
Stevan Đenadić, Miloš Tanasijević, Vladimir Milisavljević, Dragan Ignjatović, Predrag Jovančić (2021)The production of lignite in large open-pit mines is mainly performed with continuously operating equipment, where bucket-wheel excavators, bucket-chain excavators, belt conveyors, and spreaders are the basic machines. Smaller machines, usually of discontinuous operating nature, are commonly categorized as auxiliary machines. This paper presents the research related to the analysis of auxiliary machine parameters with the case study for a hydraulic excavator. The purpose of the analysis was to develop a model of rating quality of service of the ...Stevan Đenadić, Miloš Tanasijević, Vladimir Milisavljević, Dragan Ignjatović, Predrag Jovančić. "Application of the Fuzzy Model in the Evaluation and Selection of Hydraulic Excavators on Open-Pit Lignite Mine" in SSRN Electronic Journal, Elsevier BV (2021). https://doi.org/10.2139/ssrn.3945617
-
Ostvarivanje dobiti pri uvođenju sistema agregatnih zamena na osnovnoj rudarskoj mehanizaciji površinskih kopova EPS
Jedan od osnovnih zadataka na površinskim kopovima uglja je ostvarivanje zadovoljavajućeg vremenskog i kapacitetnog iskorišćenja kontinualnih sistema. Da bi se to postiglo, neophodno je izvršiti izmene u postojećoj strategiji održavanja. Preduslov je uvođenje agregatne zamene vitalnih delova na rudarskim mašinama. Benefiti su višestruki. Očekivani rezultati ovakvog pristupa su: smanjenje zastoja i povećanje vremena rada; direktne materijalne uštede; bolja organizacija rada; racionalizaciju radioničkih i magacinskih kapaciteta; povećanje vrednosti mašina. Da bi se uvela agregatna zamena neophodne su investicije za nabavku ...Predrag Jovančić, Ignjatović Dragan, Đenadić Stevan. "Ostvarivanje dobiti pri uvođenju sistema agregatnih zamena na osnovnoj rudarskoj mehanizaciji površinskih kopova EPS" in X Međunarodna konferencija UGALJ, Zlatibor, Srbija, 13-16. Oktobar 2021., Jugoslovenski komitet za površinsku eksploataciju (2021)
-
Концепт расположивости при дефинисању ефикасног одржавања помоћне механизације на површинским коповима
Radiša D. Đurić (2016-05-30)Оцена расположивости представља основну компоненту уинжењерском управљању опремом. Расположивост је свеобухватни концепткоји представља меру употребног квалитета техничких система, који садржичитаву серију парцијалних индикатора који се односе на време у раду ивреме у отказу система као и на његову функционалну погодност. Овадисертација даје структурну анализу парцијалних индикатора као и развојмодела њихове синтезе на ниво расположивости. Поменути подаци имајухибридни карактер (измерени и експертски добијени) и њихова интеграцијаи синтеза је остварена коришћењем фази пропозиције и фази закључивања.Овакав приступ омогућава оцену техничког система ...управљање опремом, инжењерство одржавања,расположивост, фази закључивање, прикупљање података, булдозер... 2006.01.006. Bugaric, U., Tanasijevic, M., Polovina, D., Ignjatovic, D., Jovancic, P., 2012. Lost production costs of the overburden excavation system caused by rubber belt failure. Eksploatacja i Niezawodnosc – Maintenance and Reliability; 14(4): 333-341 Tanasijevic, M., Bugaric, U., Jovancic ...
... активности одржавања [Bugaric и остали, 2012; Jaarsveld и остали, 2011], у смислу истраживања зависности између поузданости и појава као што су умор [Tanasijevic и остали, 2012; Thies и остали, 2012], корозија [Chateauneuf и остали, 2011] и тако даље, или у погледу поузданости која је заснована на дизајну ...
... раднике су високи. Ове чињенице наглашавају значај анализе поузданости у раду рударске опреме [Barabady и остали, 2008; Bugaric и остали, 2012; Tanasijevic и остали, 2012; Uzgoren и остали, 2010]. Сагласно томе, у наредном тексту су дати примери израчунавања поузданости и расположивости типских булдозера ...Radiša D. Đurić. "Концепт расположивости при дефинисању ефикасног одржавања помоћне механизације на површинским коповима" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2016-05-30)
-
Geodynamics of basins above subducted slabs: An integrated modelling study of tectonics, sedimentation, and magmatism in the Timok Magmatic Complex
Uros Stojadinovic, Marinko Toljic, Branislav Trivic, Radoje Pantovic, Danica Sreckovic-Batocanin, Nemanja Krstekanic, Bojan Kostic, Milos Velojic, Jelena Stefanovic, Nikola Randjelovic, Maja Males (2024)Uros Stojadinovic, Marinko Toljic, Branislav Trivic, Radoje Pantovic, Danica Sreckovic-Batocanin, Nemanja Krstekanic, Bojan Kostic, Milos Velojic, Jelena Stefanovic, Nikola Randjelovic, Maja Males. "Geodynamics of basins above subducted slabs: An integrated modelling study of tectonics, sedimentation, and magmatism in the Timok Magmatic Complex" in Annales geologiques de la Peninsule balkanique, National Library of Serbia (2024). https://doi.org/10.2298/GABP240116003S
-
Fuzzy Model for Risk Assessment of Machinery Failures
The main goal of this research was the development of an algorithm for the implementation of negative risk parameters in a synthesis model for a risk level assessment for a specific machine used in the mining industry. Fuzzy sets and fuzzy logic theory, in combination with statistical methods, were applied to analyze the time picture state of the observed machine. Fuzzy logic is presented through fuzzy proposition and a fuzzy composition module. Using these tools, the symmetric position of the ...... Tanasijević, M.; Ignjatović, D. Fuzzy approach to dependability performance evaluation. Qual. Reliab. Eng. Int. 2008, 24, 779–792. [CrossRef] 27. Tanasijevic, M.; Jovancic, P.; Ivezic, D.; Bugaric, U.; Djuric, R. A fuzzy-based decision support model for effectiveness evaluation—A case study of examination ...
... synthesis using fuzzy sets and evidential reasoning. Reliab. Eng. Syst. Safe. 1995, 47, 103–118. [CrossRef] 34. Djenadic, S.; Ignjatovic, D.; Tanasijevic, M.; Bugaric, U.; Jankovic, I.; Subaranovic, T. Development of the availability concept by using fuzzy theory with AHP correction, a Case study: ...
... Article Fuzzy Model for Risk Assessment of Machinery Failures 1,* 2 Dejan V. Petrovié , SaSa Stojadinovié 1, Jelena Ivaz 1 and Pavle Stojkovi¢ ! , Milos Tanasijevi¢ 1 Technical Faculty in Bor, University of Belgrade, VJ 12, 19210 Bor, Serbia; sstojadinovic@tfbor.bg.ac.rs (S.S.); jivaz@tfbor.bg.ac.rs ...Dejan V. Petrović, Miloš Tanasijević, Saša Stojadinović, Jelena Ivaz, Pavle Stojković. "Fuzzy Model for Risk Assessment of Machinery Failures" in Symmetry, MDPI AG (2020). https://doi.org/10.3390/sym12040525
-
Selection of Artificial Lift Methods: A Brief Review and New Model Based on Fuzzy Logic
Miroslav Crnogorac, Miloš Tanasijević, Dušan Danilović, Vesna Karović Maričić, Branko Leković (2020)Artificial lift methods have applications in oil wells where oil production is no longer possible due to natural reservoir energy, so this necessary energy is added by introducing lift methods. In order to achieve optimum production, the selection of an artificial lift method is very important. This paper uses fuzzy logic as a mathematical and conceptual model for selection of the optimal artificial lift method. The outcome or IF-THEN rules, as the central part of the model, is based ...... Traffic Control and Transport Planning: A Fuzzy Sets and Neural Networks Approach. Int. Ser. Intell. Technol. 1998. [CrossRef] 21. Miodragovic, R.; Tanasijevic, M.; Mileusnic, Z.; Jovancic, P. Effectiveness assessment of agricultural machinery based on fuzzy sets theory. Expert Syst. Appl. 2012, 39, 8940–8946 ...
... energies energies (mort, Article Selection of Artificial Lift Methods: A Brief Review and New Model Based on Fuzzy Logic Miroslav Crnogorac *, Milos Tanasijevi¢, Dusan Danilovi¢, Vesna Karovi¢ Mari¢i¢é and Branko Lekovié Faculty of Mining and Geology, University of Belgrade, 11000 Belgrade, Serbia; ...Miroslav Crnogorac, Miloš Tanasijević, Dušan Danilović, Vesna Karović Maričić, Branko Leković. "Selection of Artificial Lift Methods: A Brief Review and New Model Based on Fuzzy Logic" in Energies, MDPI AG (2020)