Претрага
575 items
-
Redesign, upgrading and unification of the drum at belt conveyors of the main mining equipment at opencast mines
Ignjatović Dragan, Maneski Taško, Jovančić Predrag, Tanasijević Miloš. "Redesign, upgrading and unification of the drum at belt conveyors of the main mining equipment at opencast mines" in 8th International Symposium Mine Haulage and Hoisting ISTI 1, Zlatibor:Rudarsko-geološki fakultet (2011): 50-59 M33
-
Using previously polluted sites for waste storage, Prahovo phosphogypsum storage case study
Knežević Dinko, Lilić Nikola, Nišić Dragana, Stanić Miloš, Kuzmanović Vladan. "Using previously polluted sites for waste storage, Prahovo phosphogypsum storage case study" in Proceedings of the 5th International Symposium Mining and Environmental Protection, Vrdnik:Faculty of Mining and Geology, University of Belgrade (2015): 356-365 M33
-
Environmental Noise Management in Serbian Open Pit Mines
Cvjetić Aleksandar, Lilić Nikola, Milisavljević Vladimir, Pantelić Uroš. "Environmental Noise Management in Serbian Open Pit Mines" in Mining and Environmental Protection, 6th International Symposium, MEP 17, Vrdnik, 21-24 June 2017, Beograd:University of Belgrade, Faculty of Mining and Geology (2017): 349-354 M33
-
Isolation of old works and the possibility of a durable solution for the drainage of the pit mine Soko
Denić Miodrag, Svrkota Igor, Stojadinović Saša, Dragišić Veselin, Živanović Vladimir, Joković Dragan (2015)Denić Miodrag, Svrkota Igor, Stojadinović Saša, Dragišić Veselin, Živanović Vladimir, Joković Dragan. "Isolation of old works and the possibility of a durable solution for the drainage of the pit mine Soko" in Proceedings of the 5th International Symposium Mining And Environmental Protection, June 10-13,2015, Vrdnik, Serbia, Beograd:Faculty of Mining and Geology (2015): 331-337 M33
-
Procedural decision making Algoritam in selection of reclamation solutions
Димитријевић Бојан, Мајсторовић Јелена, Јанковић Иван, Чебашек Владимир. "Procedural decision making Algoritam in selection of reclamation solutions" in Proceedings of the XIV International conference of the open and underwater mining of minerals, Varna, Varna, Bulgaria:Scientific and technical union of mining, geology and metallurgy Bulgaria, Sofia (2017): 240-243 M33
-
Technical Solution for Reclamation of the Trachyte Open Pit Mine Kisnjeva Glava at Fruska Gora
Šubaranović Tomislav, Petrović Branko, Ivoš Vladimir, Ristović Ivica. "Technical Solution for Reclamation of the Trachyte Open Pit Mine Kisnjeva Glava at Fruska Gora" in Proceedings of the VI International symposium on mining and environmental protection, Vrnjacka Banja, Serbia:University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2017): 206-210 M33
-
Protection of lignite opencast mine Radljevo North from the water of river Pljostanica
Šubaranović Tomislav, Ivoš Vladimir, Pavlović Vladimir, Minić Zvonko. "Protection of lignite opencast mine Radljevo North from the water of river Pljostanica" in Proceedings of the XIV International conference of the open and underwater mining of minerals, Varna, Bulgaria:Scientific and technical union of mining, geology and metallurgy Bulgaria (2017): 350-354 M33
-
Sustainable development in oil sector of the Republic of Serbia
Karović Maričić Vesna, Leković Branko, Danilović Dušan. "Sustainable development in oil sector of the Republic of Serbia" in 6th International Symposium Mining and Environmental Protection – Proceedings, Vrdnik:University of Belgrade Faculty of Mining And Geology (2017): 34-42 M33
-
Optimising in electrical energy consumption in mining plants
Snežana Aleksandrović, Vesna Damnjanović, Ilija Jeftenić. "Optimising in electrical energy consumption in mining plants" in 17th International Symposium INFOTEH-JAHORINA 2018, Istočno Sarajevo : Elektrotehnički fakultet, Univerzitet u Istočnom Sarajevu (2018) M33
-
Quantification of Uncertainty in Mining Project Related to Metal Price Using Mean Reversion Process and Interval Type-2 Fuzzy Sets Theory
Gligorić Zoran, Beljić Čedomir, Gluščević Branko. "Quantification of Uncertainty in Mining Project Related to Metal Price Using Mean Reversion Process and Interval Type-2 Fuzzy Sets Theory" in Podzemni radovi no. 22, Beograd:Univerzitet u Beogradu, Rudarsko-geološki fakultet (2013): 71-84 M51
-
Fuzzy linear model for production optimization of mining systems with multiple entities
Slobodan Vujić, Tomo Benović, Miljanović Igor, Hudej Marjan, Milutinović Aleksandar, Pavlović Petar (2011)Slobodan Vujić, Tomo Benović, Miljanović Igor, Hudej Marjan, Milutinović Aleksandar, Pavlović Petar. "Fuzzy linear model for production optimization of mining systems with multiple entities" in International Journal of Minerals, Metallurgy and Materials 18 no. 6, -:University of Science and Technology Beijing, PR China (2011): 633-637. https://doi.org/10.1007/s12613-011-0488-8 M22
-
Project solution for land reclamation and spatial arrangement of the „Srebro“ open pit mine at the Fruška gora national park
Vujić Slobodan, Cvejić Jasminka, Miljanović Igor, Petrovski Aleksandar. "Project solution for land reclamation and spatial arrangement of the „Srebro“ open pit mine at the Fruška gora national park" in The Journal of the South African Institute of Mining and Metallurgy 111 no. 5, -:South African Institute of Mining and Metallurgy (2011): 365-370. https://doi.org/- M23
-
Regional-scale screening of groundwater pollution risk induced by historical mining activities in Serbia
Atanacković Nebojša, Dragišić Veselin, Živanović Vladimir, Gardijan Sunčica, Magazinović Sava (2016)Atanacković Nebojša, Dragišić Veselin, Živanović Vladimir, Gardijan Sunčica, Magazinović Sava. "Regional-scale screening of groundwater pollution risk induced by historical mining activities in Serbia" in Environmental Earth Sciences no. 75, :Springer Berlin Heidelberg (2016): 1152. https://doi.org/10.1007/s12665-016-5983-9 M22
-
Coal cleaning before combustion – practice and experience in Serbia
Milena Kostović, Ivana Simović, Nebojša Kostović, Nina Pantelić. "Coal cleaning before combustion – practice and experience in Serbia" in Underground Mining Engineering, University of Belgrade, Faculty of Mining and Geology (2022) М51
-
Estimation of damage on the equipment during the floods in opencast mines Tamnava-West field and Veliki Crljeni
Dragan Ignjatović, Predrag Jovančić, Vladimir Pavlović. "Estimation of damage on the equipment during the floods in opencast mines Tamnava-West field and Veliki Crljeni" in 13th International symposium Continuous Surface Mining ISCSM 2016, 12-14 September 2016, Belgrade – Serbia, Belgrade : Yugoslav Opencast Mining Committee (2016) М33
-
Volcanogenic-sedimentary Formations in Parts of South-Western Nigeria, and their Mineral Potentiality
B.E. Bafor (1979)B.E. Bafor. Volcanogenic-sedimentary Formations in Parts of South-Western Nigeria, and their Mineral Potentiality, Belgrade:Faculty of Mining and Geology, 1979
-
Fuzzy expert analysis of the severity of mining machinery failure
Mining machinery failure is almost an everyday occurrence. Usually the failures bare certain consequences, which require additional financial costs to repair and restore the system to its operational state. The consequences are viewed through negative and damaging effects a failure has on the machine, health and safety of the employees, work environment, and on the environment. The removal of the consequences of the failure requires additional financial investment, which has a negative impact on the company’s business. In order ...Dejan V. Petrović, Miloš Tanasijević, Saša Stojadinović, Jelena Ivaz, Pavle Stojković. "Fuzzy expert analysis of the severity of mining machinery failure" in Applied Soft Computing, Elsevier BV (2020). https://doi.org/10.1016/j.asoc.2020.106459 М21а
-
Flyrock induced by blasting in surface mining
Milanka Negovanović, Lazar Kričak, Snežana Ignjatović, Stefan Milanović, Jovan Marković, Nikola Simić, Rade Šarac (2022)Miniranje predstavlja i dalje najefikasniji i najjeftiniji način eksploatacije velikih količina čvrstih mineralnih sirovina na površinskim kopovima. Energija eksplozije se koristi za fragmentaciju čvrste stenske mase do zahtevane granulacije. Pored pozitivnih efekata miniranja, postoje i određeni neželjeni efekti svakog procesa miniranja koji se mogu javiti, a to su: potresi tla, razletanje komada stene, vazdušni udari, otrovni i zagušljivi gasovi i prašina. Razletanje komada stene je nekontrolisano izbacivanje fragmenata odminirane stenske mase i predstavlja jedan od glavnih izvora materijalne štete ...Milanka Negovanović, Lazar Kričak, Snežana Ignjatović, Stefan Milanović, Jovan Marković, Nikola Simić, Rade Šarac. "Flyrock induced by blasting in surface mining" in Rudarski glasnik, Beograd : Rudarski institut (2022). https://doi.org/10.25075/BM.2022.05 М54
-
Underground loading-haulage equipment selection with application of topsis method with different weighting methods of criteria
The choice of adequate mining machines is one of the most complex problems in the underground exploitation of mineral raw materials. The weight of such a decision is reflected in the high prices of these machines and the occurrence of even greater costs during their use if their choice was wrongly conceived. There are numerous examples from practice in which such decisions were made solely on the basis of comparing the prices of machines, without considering any of the ...utovarno-transportna mehanizacija, izbor, TOPSIS, entropija, standardna devijacija, težina kriterijumaVladimir Krivošić, Luka Crnogorac, Rade Tokalić. "Underground loading-haulage equipment selection with application of topsis method with different weighting methods of criteria" in Underground mining engineering, University of Belgrade - Faculty of Mining and Geology (2024) М51
-
Optimal dynamic management of exploitation life of the mining machinery: models with limited interval
Vujić Slobodan, Miljanović Igor, Boševski Stefko, Kasaš Karolj, Milutinović Aleksandar, Gojković Nebojša, Josipović Pejović Milena, Dimitrijević Bojan, Gajić Grozdana, Čebašek Vladimir (2010)Vujić Slobodan, Miljanović Igor, Boševski Stefko, Kasaš Karolj, Milutinović Aleksandar, Gojković Nebojša, Josipović Pejović Milena, Dimitrijević Bojan, Gajić Grozdana, Čebašek Vladimir. "Optimal dynamic management of exploitation life of the mining machinery: models with limited interval" in Journal of Mining Science 46 no. 5, Germany/USA:Springer (2010): 554-560 M22