Претрага
168 items
-
Dynamics of landslide model with time delay and periodic parameter pertubacions
Kostić Srđan, Vasović Nebojša, Franović Igor, Jevremović Dragutin, Mitrinović David, Todorović Kristina (2014)Kostić Srđan, Vasović Nebojša, Franović Igor, Jevremović Dragutin, Mitrinović David, Todorović Kristina. "Dynamics of landslide model with time delay and periodic parameter pertubacions" in Communications in Nonlinear Science and Numerical Simulation 19 no. 9, Amsterdam, Netherlands:Elsevier (2014): 3346-3361. https://doi.org/10.1016/j.cnsns.2014.02.012
-
Fuzzy linear model for production optimization of mining systems with multiple entities
Slobodan Vujić, Tomo Benović, Miljanović Igor, Hudej Marjan, Milutinović Aleksandar, Pavlović Petar (2011)Slobodan Vujić, Tomo Benović, Miljanović Igor, Hudej Marjan, Milutinović Aleksandar, Pavlović Petar. "Fuzzy linear model for production optimization of mining systems with multiple entities" in International Journal of Minerals, Metallurgy and Materials 18 no. 6, -:University of Science and Technology Beijing, PR China (2011): 633-637. https://doi.org/10.1007/s12613-011-0488-8
-
The deterministic fuzzy linear approach in planning the production of mine system with several open pits
Vujić Slobodan, Miljanović Igor, Kuzmanović Marija, Zoran Bartulović, Gajić Grozdana, Lazić Predrag (2011)Vujić Slobodan, Miljanović Igor, Kuzmanović Marija, Zoran Bartulović, Gajić Grozdana, Lazić Predrag. "The deterministic fuzzy linear approach in planning the production of mine system with several open pits" in Archives of Mining Sciences 56 no. 3, -:Polish Academy of Sciences - Committee of Mining (2011): 489-497. https://doi.org/-
-
Multiattributive prediction of terrain stability above the underground mining operations
Vujić Slobodan, Miljanović Igor, Milutinović Aleksandar, Đorđević Dragan, Gojković Nebojša, Gajić Grozdana (2011)Vujić Slobodan, Miljanović Igor, Milutinović Aleksandar, Đorđević Dragan, Gojković Nebojša, Gajić Grozdana. "Multiattributive prediction of terrain stability above the underground mining operations" in Yugoslav Journal of Operations Research 21 no. 2, Belgrade:University of Belgrade, Faculty of Organizational Sciences (2011): 275-291. https://doi.org/10.2298/YJOR1102275V
-
Korelacija između sadržaja i iskorišćenja bakra u flotacijskom koncentratu iz pogona Veliki Krivelj u funkciji finoće mlevenja
Jovanović Ivana, Todorović Dejan, Miljanović Igor, Urošević Daniela, Magdalinović Srđana, Krstić Slađana (2013)Jovanović Ivana, Todorović Dejan, Miljanović Igor, Urošević Daniela, Magdalinović Srđana, Krstić Slađana. "Korelacija između sadržaja i iskorišćenja bakra u flotacijskom koncentratu iz pogona Veliki Krivelj u funkciji finoće mlevenja" in Bakar 38 no. 2, -:Institut za rudarstvo i metalurgiju Bor (2013): 45-54. https://doi.org/-
-
Development of a fuzzy model for predicting the penetration rate of tricone rotary blasthole drilling in open pit mines
Kričak Lazar, Negovanović Milanka, Mitrović Stojan, Miljanović Igor, Nurić Samir, Nurić Adila (2015)Kričak Lazar, Negovanović Milanka, Mitrović Stojan, Miljanović Igor, Nurić Samir, Nurić Adila. "Development of a fuzzy model for predicting the penetration rate of tricone rotary blasthole drilling in open pit mines" in The Journal of the Southern African Institute of Mining and Metallurgy 115 no. 11, Johannesburg, The South African Republic:The Southern African Institute of Mining and Metallurgy (2015): 1065-1071. https://doi.org/10.17159/2411-9717/2015/v115n1
-
Novi koncept izrade Osnovne hidrogeološke karte Srbije
Igor Jemcov, Zoran Stevanović, Vladimir Živanović, Saša Milanović, Dušan Polomčić, Veselin Dragišić (2022)Osnovna hidrogeološka karta (OHGK) predstavlja bazični dokument u hidrogeologiji, a ima za cilj sagledavanje osnovnih tipova izdani što da omogućava sagledavanje podzemnih vodnih resursa na području obuhvaćenom kartom. Primena postojećeg Uputstva za izradu Osnovne hidrogeološke karte SFRJ 1:100.000 (iz 1984, odnosno 1988. godine), vezana je za brojne poteškoće, što je uslovilo da je u proteklom periodu od 30 godina bilo je više inicijativa za formiranjem novog Uputstva. Sagledavajući postojeću situaciju uz činjenice o savremenim trendovima razvoja hidrogeoloških karata u ...Igor Jemcov, Zoran Stevanović, Vladimir Živanović, Saša Milanović, Dušan Polomčić, Veselin Dragišić. "Novi koncept izrade Osnovne hidrogeološke karte Srbije" in Zbornik radova XVI srpskog Simpozijum o hidrogeologiji sa međunarodnim učešćem, Univerzitet u Beograd, Rudarsko-geološki fakultet (2022)
-
Formiranje fuzzy verbalnog modela procesa pripreme mineralnih sirovina
Miljanović Igor, Petrovski Aleksandar, Benović Tomo, Maksimović Svetomir, Milutinović Aleksandar, Josipović Pejović Milena (2010)Miljanović Igor, Petrovski Aleksandar, Benović Tomo, Maksimović Svetomir, Milutinović Aleksandar, Josipović Pejović Milena. "Formiranje fuzzy verbalnog modela procesa pripreme mineralnih sirovina" in Zbornik radova XXXVII Simpozijuma o operacionim istraživanjima Symopis, 21-24.09.2010. - no. -, Tara, Srbija:Ministarstvo odbrane Republike Srbije (2010): 643-646. https://doi.org/-
-
Fuzzy model of a multigrade structure for support of decision-making and management in mineral processing
Vujić Slobodan, Miljanović Igor, Benović Tomo, Milutinović Aleksandar, Petrovski Aleksandar, Josipović Pejović Milena (2011)Vujić Slobodan, Miljanović Igor, Benović Tomo, Milutinović Aleksandar, Petrovski Aleksandar, Josipović Pejović Milena. "Fuzzy model of a multigrade structure for support of decision-making and management in mineral processing" in Proceedings of the 35th APCOM Symposium, Wollongong, Australia - no. -, Wollongong, Australia:University of Wollongong, Australia (2011): 485-490. https://doi.org/-
-
Influence of GPS telemetry on increasing the energetic efficiency and decreasing technical technological risks at open pit mines
Vujić Slobodan, Miljanović Igor, Milutinović Aleksandar, Gajić Grozdana, Petrovski Aleksandar, Josipović Pejović Milena (2011)Vujić Slobodan, Miljanović Igor, Milutinović Aleksandar, Gajić Grozdana, Petrovski Aleksandar, Josipović Pejović Milena. "Influence of GPS telemetry on increasing the energetic efficiency and decreasing technical technological risks at open pit mines" in Proceedings of the 4th Balkan Mining Congress BALKANMINE 2011, 18-20.10.2011 - no. -, Ljubljana, Slovenia:Velenje Coal Mine, Slovenia, University of Ljubljana, Faculty of Natural Sciences and Engineering (2011): 273-276. https://doi.org/-
-
Application of fuzzy inference models on the example of zinc ore flotation concentration
Miljanović Igor, Vujić Slobodan, Lazić Predrag, Jovanović Ivana, Josipović Pejović Milena, Petrovski Aleksandar (2013)Miljanović Igor, Vujić Slobodan, Lazić Predrag, Jovanović Ivana, Josipović Pejović Milena, Petrovski Aleksandar. "Application of fuzzy inference models on the example of zinc ore flotation concentration" in Proceedings of the XI Balkan Conference on Operations Research BALCOR, 7-11.09.2013. - no. -, Beograd, Zlatibor, Srbija:University of Belgrade, Faculty of Organizational Sciences, Belgrade (2013): 532-537
-
Predictive modeling for U and Th concentrations in mineral and thermal waters, Serbia
Earth-Surface Processes, Geology, Pollution, Soil Science, Water Science and Technology, Environmental Chemistry, Global and Planetary ChangeMarina Ćuk Đurović, Igor Jemcov, Maja Todorović, Ana Mladenović, Petar Papić, Jana Štrbački. "Predictive modeling for U and Th concentrations in mineral and thermal waters, Serbia" in Environmental Earth Sciences, Springer Science and Business Media LLC (2020). https://doi.org/10.1007/s12665-020-09204-y
-
A Model for Determining the Dependability of Continuous Subsystems in Coal Mines Using the Fuzzy Logic Approach
Nikola Stanić, Miljan Gomilanović, Petar Marković, Daniel Krzanović, Aleksandar Doderović, Saša Stepanović (2024)This study presents a unique model for assessing the dependability of continuous parts of combined systems in open-pit mining through the application of fuzzy logic. Continuous sub-systems as part of the combined system of coal exploitation in surface mines have the basic function of ensuring safe operation, high capacity with high reliability, and low costs. These subsystems are usually part of the thermal power plant’s coal supply system and ensure stable fuel supply. The model integrates various independent partial ...fuzzy logic, max-min composition, continuous part of combined system (CCS), open pit, mining, dependabilityNikola Stanić, Miljan Gomilanović, Petar Marković, Daniel Krzanović, Aleksandar Doderović, Saša Stepanović. "A Model for Determining the Dependability of Continuous Subsystems in Coal Mines Using the Fuzzy Logic Approach" in Applied Sciences, Basel, August 2024, MDPI (2024). https://doi.org/https://doi.org/10.3390/app14177947
-
Demise of the Wetterstein Carbonate Platform and onset of the Dachstein Carbonate Platform recorded in deep-water successions of the East Bosnian-Durmitor megaunit (Pliješevina, northern Montenegro, Dinarides)
Milica Mrdak, Eva Wagerer, Milan Sudar, Nevenka Djerić, Martin Đaković, Hans-Jürgen Gawlick. "Demise of the Wetterstein Carbonate Platform and onset of the Dachstein Carbonate Platform recorded in deep-water successions of the East Bosnian-Durmitor megaunit (Pliješevina, northern Montenegro, Dinarides)" in Geologica Carpathica, Central Library of the Slovak Academy of Sciences (2024). https://doi.org/10.31577/GeolCarp.2023.26
-
Risks in optimization of consumables supplies in mining
Vujić Slobodan, Boševski Stefko, Miljanović Igor, Petrovski Aleksandar, Milutinović Aleksandar, Čebašek Vladimir, Gajić Grozdana (2011)Vujić Slobodan, Boševski Stefko, Miljanović Igor, Petrovski Aleksandar, Milutinović Aleksandar, Čebašek Vladimir, Gajić Grozdana. "Risks in optimization of consumables supplies in mining" in Proceedings of 22nd International Mining Congress, Ankara, Turkey, Ankara, Turkey:UCTEA,The Chamber of Mining Engineers of Turkey (2011): 29-34
-
Influencing the energetic efficiency of clay minerals open pit mines by corrections in technology processes real time
Vujić Slobodan, Kasaš Karolj, Miljanović Igor, Petrovski Aleksandar, Kermeci Žolt, Popov Katica, Milutinović Aleksandar (2011)Vujić Slobodan, Kasaš Karolj, Miljanović Igor, Petrovski Aleksandar, Kermeci Žolt, Popov Katica, Milutinović Aleksandar. "Influencing the energetic efficiency of clay minerals open pit mines by corrections in technology processes real time" in Proceedings, 22nd International Mining Congress 1, Ankara, Turkey:UCTEA, The Chamber of Mining Engineers (2011): 181-188
-
Human factor risk management procedures applied in the case of open pit mine
Snežana Kirin, Aleksandar Sedmak, Wei Li, Miodrag Brzaković, Igor Miljanović, Ana Petrović, Simon Sedmak (2021)Risk management aims to provide a controlled work environment to ensure the safe operation of the high-risk systems. It is a dynamic process which work in a continual state of change. The issue of human factor risk and rules and regulations in open pit mine is a main focus of this paper in order to develop predictive models of behavior of workers in relation to compliance with the procedures and rules. Presented survey was conducted in open pit coal ...Snežana Kirin, Aleksandar Sedmak, Wei Li, Miodrag Brzaković, Igor Miljanović, Ana Petrović, Simon Sedmak. "Human factor risk management procedures applied in the case of open pit mine" in Engineering Failure Analysis (2021). https://doi.org/https://doi.org/10.1016/j.engfailanal.2021.105456
-
GPS podržani sistemi daljinskog nadzora i upravljanja rudničkim proizvodnim kompleksima
Vujić Slobodan, Miljanović Igor, Petrovski Aleksandar, Josipović Pejović Milena, Milutinović Aleksandar, Čebašek Vladimir, Dimitrijević Bojan (2010)Vujić Slobodan, Miljanović Igor, Petrovski Aleksandar, Josipović Pejović Milena, Milutinović Aleksandar, Čebašek Vladimir, Dimitrijević Bojan. "GPS podržani sistemi daljinskog nadzora i upravljanja rudničkim proizvodnim kompleksima" in VIII Međunarodni simpozijum Mehanizacija i automatizacija u rudarstvu i energetika MAREN 2010, Beograd, Srbija:Rudarsko-geološki fakultet (2010): 351-359
-
Formiranje fuzzy verbalnog modela procesa pripreme mineralnih sirovina
Boševski Stefko, Vujić Slobodan, Miljanović Igor, Petrovski Aleksandar, Josipović Pejović Milena, Milutinović Aleksandar, Čebašek Vladimir (2010)Boševski Stefko, Vujić Slobodan, Miljanović Igor, Petrovski Aleksandar, Josipović Pejović Milena, Milutinović Aleksandar, Čebašek Vladimir. "Formiranje fuzzy verbalnog modela procesa pripreme mineralnih sirovina" in XXXVII Symopis (2010): 635-638
-
Optimizacija zaliha materijala u rudarstvu: problemi i zamke
Vujić Slobodan, Boševski Stefko, Miljanović Igor, Petrovski Aleksandar, Josipović Pejović Milena, Milutinović Aleksandar, Čebašek Vladimir (2010)Vujić Slobodan, Boševski Stefko, Miljanović Igor, Petrovski Aleksandar, Josipović Pejović Milena, Milutinović Aleksandar, Čebašek Vladimir. "Optimizacija zaliha materijala u rudarstvu: problemi i zamke" in XXXVII Symopis (2010): 639-642