Environmental Noise Impact Assessment for Large-Scale Surface Mining Operations in Serbia
Noise emissions are a significant environmental impact caused by the mining industry in all technological phases of surface mining, mineral processing, and waste disposal. This paper presents the role of noise impact assessment and control in large-scale surface mining operations. Mine planning develops the model of mining operations, ore excavation, and waste dumping scheduling and processing rates, including spatial distribution of mining activities. Such a level of mine planning requires an environmental impact assessment study. This can be achieved ...Uros Pantelic, Petar Lilic, Aleksandar Cvjetic, Nikola Lilic. "Environmental Noise Impact Assessment for Large-Scale Surface Mining Operations in Serbia" in Sustainability, MDPI AG (2023). https://doi.org/10.3390/su15031798
-
An intelligent hybrid system for surface coal mine safety analysis
Nikola Lilić, Ivan Obradović, Aleksandar Cvjetić. "An intelligent hybrid system for surface coal mine safety analysis" in Engineering Applications of Artificial Intelligence (2010)
-
Optimizacija i planiranje površinskih kopova stohastičkim modelima
Dejan R. Stevanović (2015-05-29)Savremeno rudarstvo izloženo je stalnom trendu pogoršanja uslova poslovanja.Mogućnost ostvarenja ekonomskih i drugih ciljeva rudarskog projektakompromitovana je stalnim pogoršanjem kvaliteta ležišta na kojima se vršieksploatacija, kao i značajnoj dozi neizvesnosti povezane sa geološkim,ekonomskim i tehničkim parametrima proizvodnje. U ovako kompleksnimuslovima poslovanja, matematički modeli sposobni da odgovore značajnimizazovima, odnosno ponude optimalna rešenja kojima se garantuje maksimalnoispunjenje projektovanih ciljeva, nameću se kao neophodnost.Trenutni, konvencionalni pristup optimizaciji i planiranju površinskih kopovazasniva se na algoritmima, razvijenim sredinom prošlog veka čije je opšteobeležje deterministički ...površinski kop, planiranje, optimizacija, stohastički modeli, kontrola kvaliteta uglja, neizvesnost.... modelling approaches to risk analysis for open pit mining, The Journal of The Southern African Institute of Mining and Metallurgy, vol. 110, str. 571-579 Consuegra F.R.A., 2010, Exploring stochastic optimization in open pit mine design, Department of Mining and Materials Engineering, McGill University ...
... of final pit limits for open pit Buvač using the software package Whittle, International symposium Sustainable development of mining and energy industry ORRE 11, Serbia, 11-15 September 2011. Stevanović D., Radović R., Malbašić V, Kolonja B, 2011. Optimization of final pit limits for open pit Buvač using ...
... uncertainty and risk effects in open pit design, Mining Technology, Vol. 111, str. 82-87. Dimitrakopoulos R, Ramazan S, 2008, Stochastic integer programming for optimizing long term production schedules of open pit mines: methods, application and value of stochastic solutions, Mining Technology, Transactions ...Dejan R. Stevanović. "Optimizacija i planiranje površinskih kopova stohastičkim modelima" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2015-05-29)
-
Application of Thermal Imaging in Surface Mining
Milanka Negovanović (2022)Termalno snimanje se sve više koristi u rudarskoj industriji kao jedan od dijagnostičkih alata za praćenje određenih proizvodnih procesa, kao i stanja opreme i mašina. Predstavlja nedestruktivnu i beskontaktnu metodu ispitivanja koja omogućava rano otkrivanje problema, planiranje održavanja sa minimalnim kvarovima, sprečavanje neplaniranih poremećaja, posmatranje materijala u nepristupačnim ili opasnim područjima i poboljšanje bezbednosti i produktivnosti. Termalno snimanje koristi specijalizovane termalne kamere sa unutrašnjim detektorima koji identifikuju veoma male temperaturne varijacije i proizvode sliku tog nevidljivog infracrvenog ili toplotnog ...Termalno snimanje, nedestruktivne metode testiranja, površinska eksploatacija, termalne kamere, rudarske operacijeMilanka Negovanović. "Application of Thermal Imaging in Surface Mining" in 15th International Conference OMC 2022, Zlatibor, 12-15th October 2022, Jugoslovenski komitet za površinsku eksploataciju (2022)
-
Optimizacija površinskog kopa Ciganuša – Škorac
Vasilije Zejak (2024)U radu se govori o značaju optimizacije u savremenom rudarstvu i kako nam to softveri štede vreme, novac i olakšavaju procese planiranja.Konkretno u izradi ovog rada korišćen je softverski paket Whittle.Da bi se optimizacije mogla uspešno sprovesti, potrebno je konstruisati pre svega blok model ležišta kao i definisati niz tehno – ekonomskih parametara. Na osnovu tih podataka definiše se optimalna kontura i dinamika razvoja radova. U skladu sa definisanim podaci i odgovarajućim podlogama definisana je optimalna kontura površinskog kopa Ciganuša ...optimizacija, površinski kop Ciganuša - Škorac, blok model, strateško planiranje, optimalna kontura, dinamika razvoja, fazni razvoj... Dagdelen, K. (1985). Optimum multi period open pit mine production scheduling. Golden Colorado: ProQuest LLC. 5. Dagdelen, K. (2001). Open Pit Optimization - Strategies for Improving Economics of Mining. International Mining Congress and Exhibition of Turkey- IMCET. 6. David, M. (1977). Geostatistical ...
... Beograd. 8. Dowd P. A., Onur A.H. (1993). Open-pit optimization - part 1: Optimal open- pit design. Trans. Inst. Min. Metall. 1993,102, A95-A104. 9. Githiria J. (2016). Cut-off grade optimisation to maximise the net present value using whittle 4X. /nf. J. Mining and Mineral Engineering, 7(4). 10. ...
... (1987). Opfimization Techniques For Open Pit Mine Scheduling. Perth: School of Mathematics and Statistics Curtin University of Technology. Preuzeto sa https://www.mssanz.org.au/ MODSIM99/Vo!1%203/Hill.pdf 3. Coombes J. (2004). Resource Estimation. Snowden Mining Industry Consultants. 4. Dagdelen ...Vasilije Zejak. Optimizacija površinskog kopa Ciganuša – Škorac, 2024
-
Аnaliza mogućnosti povećanja nagiba završne kosine površinskog kopa “Podbraćan”
Vladimir Čebašek, Veljko Rupar (2018)Eksploatacijom boksita iz ležišta "Podbraćan" formiran je površinski kop sa maksimalnom visinom zavšne kosine od 280 m. Redovnom kontrolom stabilnosti trenutnog stanja kosina površinskog kopa utvrđeno je da faktor sigurnosti iznosi Fs = 1.71 – 1.85, a što je ukazalo da postoji mogućnost povećanja nagiba kosine. U radu je prikazan postupak analize mogućnosti povećanja nagiba završne kosine površinskog kopa "Podbraćan".Vladimir Čebašek, Veljko Rupar. "Аnaliza mogućnosti povećanja nagiba završne kosine površinskog kopa “Podbraćan”" in Mining and Geology Today, II international symposium, Belgrade, 04 - 05.12.2018., Rudarski institut, Balkanska akademija nauka, Akademija inženjerskih nauka Srbije (2018). https://doi.org/10.25075/SI.2018.17
-
A Fuzzy Expert Model for Availability Evaluation
Each technical system within itself carries the great potential danger of possible occurrence of failure and damages. Mining machines are characteristic by great investment values, costs of unplanned shutdowns, complex working conditions, and environment and workers hazards. Systematic monitoring of the mining machinery is of great importance for the management of the mining companies. Availability is the overall concept of quality of service. Includes information regard to operating state, an idle state, a standby state and shut down. The ...... bulldozers that operate to three different open pit mines in Serbia was evaluated using the proposed expert model. Machines were compared individually (selected machine at selected open pit mine), but also integral comparisons between machines and open pit mines were made. Obtain results should be ...
... AVAILABILITY INDICATORS A n a ly st N o . A v a il a b il it y in d ic a to r Questionnaire: Bulldozer Liebherr – Drmno Open Pit Mine Grade: Excellent Good Average Adequate Poor The degree of affiliation, % 1 R 40 60 M 100 S 100 2 R 20 80 M 100 ...
... be used for the improvement of maintenance and logistic support at open pit mines, as well as an important parameter during the further purchase of this type of machines. Since the models based on experts’ opinions in principle carry a dose of subjectivity, the presented model and obtained results ...Dejan Ivezić, Miloš Tanasijević, Predrag Jovančić, Radiša Đurić. "A Fuzzy Expert Model for Availability Evaluation" in Proceedings of the 2019 20th International Carpathian Control Conference (ICCC), AGH University of Science and Technology, Kraków - Wieliczka, Poland (2019)
-
Razvoj integralnog modela za optimizaciju diskontinualnog sistema proizvodnje na površinskim kopovima nemetala
Miodrag Čelebić (2024)Izbor optimalne mehanizacije u diskontinualnom sistemu transporta je jedna od najvažnijih odluka koju treba donijeti prilikom projektovanja površinskih kopova. Pri izboru optimalne mehanizacije, uticaj ima veliki broj faktora, kako prirodnih – geoloških i ekoloških, tako i tehničkih, ekonomskih i socijanih. Neki od njih se mogu izraziti numerički, u određenim mijernim jedinicama, a neki opisno, lingvističkim varijablama, shodno uslovima koji vladaju na rudnim ležištima, a koje karakterišu visok stepen neizvjesnosti i neodređenosti kako prilikom istraživanja, tako i tokom procesa eksploatacije ...izbor mehanizacije, tehnologija eksploatacije, diskontinualani sistem, ekspertsko odlučivanje, lingvističke varijable, MCDM, FAHPMiodrag Čelebić. Razvoj integralnog modela za optimizaciju diskontinualnog sistema proizvodnje na površinskim kopovima nemetala, Beograd : [M. Čelebić], 2024
-
Quantitative landslide risk assessment in the city of Tuzla
In the climate-changing conditions, geological environment interacts more dramatically with the urban fabric than before. The urbanization is expansive and more aggressive than before, but so are the weather extremes and long-term climate trends. In effect, many processes which can be triggered by either side, nature or engineering, are becoming more pervasive than before, and such is the case with landslides. Dealing and managing landslides requires few crucial steps, starting from collecting data on landslide location and typology – ...... procedure of its aggregation into dummy variables was followed. Distance to mining sites was calculated to depict disturbed zones, since mining in Tuzla region includes open pit coal and underground salt mining. Both mining types can affect stability by causing subsidence (m order of magnitude) or ...
... Tuzla in Bosnia and Herzegovina, which is known for instabilities due to rugged steep slopes, but also destabilizing effects of underground and open pit mining, which has a long tradition in Tuzla. However, the main motive for considering this case study lies in severe landslidng episode triggered ...
... in BiH spreads over approximately 294 km 2 of mostly rugged and steep hilly terrain (Fig. 2). The city is known for its underground and open pit mining tradition, but also suffers from related ground instabilities (especially subsidence), but the actual motivation for a detailed study was the ...Miloš Marjanović, Biljana Abolmasov, Cvjetko Sandić, Miralem Mulać, Petar Begović. "Quantitative landslide risk assessment in the city of Tuzla" in SCG-Xiii International Symposium on Landslides. Cartagena, Colombia- February 22-26, 2021, International Society for Soil Mechanics and Geotechnical Engineering (2021)
-
Split-Desktop software for the analysis of fragment size distribution of blasted rock mass
Milanka Negovanović, Lazar Kričak, Stefan Milanović, Jovan Marković, Nikola Simić, Snežana Ignjatović (2023)Drobljenje stena je najvažniji pokazatelj u proceni efekata miniranja pri proizvodnom miniranju u površinskoj eksploataciji. Stepen drobljenja stena ima veliki uticaj na efikasnost daljih operacija utovara, transporta, drobljenja i mlevenja. Optimalno drobljenje stena pri proizvodnom miniranju utiče na smanjenje ukupnih troškova proizvodnje. Stoga je pouzdana procena veličine drobljenja odminirane stenske mase veoma važno pitanje, ne samo u operacijama miniranja, već i u rudarskoj proizvodnji. Za predviđanje distribucije veličine komada odminirane stenske mase postoje različiti empirijski modeli. KUZ-RAM model omogućava ...Milanka Negovanović, Lazar Kričak, Stefan Milanović, Jovan Marković, Nikola Simić, Snežana Ignjatović. "Split-Desktop software for the analysis of fragment size distribution of blasted rock mass" in 9th International Conference Mining and environmental protection, Sokobanja, Serbia, 24 – 27. May 2023, Belgrade : University of Belgrade, Faculty of Mining and Geology (2023)
-
WebGIS Cadastre of Abandoned Mines in Autonomous Province of Vojvodina
Ranka Stanković, Nikola Vulović, Nikola Lilić, Ivan Obradović, Radule Tošović, Milica Pešić-Georgiadis (2015)... abandoned facilities consist of a name, place, municipality, district and site address. Object type is selected from the list of provided terms: open pit, underground mine, processing, waste deposit, maintenance workshop, other facility. Data on cadastral parcel or parcels and the titleholder are ...
... Претрага репозиторијума доступна је на www.dr.rgf.bg.ac.rs The Digital repository of The University of Belgrade Faculty of Mining and Geology archives faculty publications available in open access, as well as the employees' publications. - The Repository is available at: www.dr.rgf.bg.ac.rs 1 ...
... bench heights, the overall depth of the pit, volume, as well as general data collected during the field visit related to recultivation, water level (whether the mine is above, below, or above and below water level), as well as the site, for example, a pit, a landfill, workshop or plant. Figure 1 ...Ranka Stanković, Nikola Vulović, Nikola Lilić, Ivan Obradović, Radule Tošović, Milica Pešić-Georgiadis. "WebGIS Cadastre of Abandoned Mines in Autonomous Province of Vojvodina" in Proceedings of the 5th International Symposium Mining And Environmental Protection,June 10-13,2015, Vrdnik, Serbia, Belgrade : Faculty of Mining and Geology (2015)
-
Model za optimizaciju graničnog saržaja metala u rudi u funkciji dugoročnog planiranja površinskih kopova
Daniel P. Kržanović (2016-06-14)Optimizacija graničnog sadržaja metala u rudi jedan je od osnovnih koraka u planiranju i dizajniranju površinskih kopova i ima za cilj postizanje maksimalne neto sadašnje vrednosti (NPV). Iz tog razloga, optimizacija graničnog sadržaja i danas je predmet mnogih istraživanja u rudarskoj nauci, sa ciljem rešavanja praktičnih problema u eksploataciji ležišta.Dugoročno planiranje eksploatacije na površinskim kopovima podrazumeva sagledavanje svih relevantih parametara i faktora (geologije rudnog ležišta, tehnologije proizvodnog procesa, kapaciteta otkopavanja i prerade, troškova, cena metala, iskorišćenja i dr) kako ...površinski kop, dugoročno planiranje, optimizacija graničnog sadržaja, maksimizacija neto sadašnje vrednosti (NPV).... Cutoff Grade Optimization for Open Pit Mining Complexes, Les Cahiers du GERAD G-2013-55, pp 1-12. Asad, M.W.A., 2005a, Cut-off grade optimization algorithm with stockpiling option for open pit mining operations of two economic minerals, International Journal of Mining, Reclamation and Environment ...
... optimum cut-off grade policy of open pit mining operations, The Journal of The Southern African Institute of Mining and Metallurgy, vol. 111, pp. 741-750. Askari-Nasab, H., Awauh-Offei, K., 2009, Open pit optimisation using discounted economic block values, Mining Technology, vol. 118, pp. 1-12 ...
... most of a mining investment, Min. Eng., pp. 64-67. Dowd, P.A., Onur, A.H., 1992, Optimizing open pit design and sequencing, Proceedings of 23rd APCOM symp., Tucson, Arizona, pp. 411 – 422. Dowd, P.A., Onur, A.H., 1993, Optimization of Open-pit Mine Design-Part 1: Optimal Open-pit Design, T ...Daniel P. Kržanović. "Model za optimizaciju graničnog saržaja metala u rudi u funkciji dugoročnog planiranja površinskih kopova" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2016-06-14)
-
Model upravljanja investicionim projektima otvaranja površinskih kopova uglja
Cvjetko P. Stojanović (2015-04-27)Brze promene u okruženju pred rukovodioce postavljaju mnogobrojne zahteve,pre svega, one koji se tiču ostvarenja ciljeva u zadatom vremenu i raspoloživimsredstvima što zahteva fleksibilan pristup u organizovanju aktivnosti i efikasnost unjihovom sprovođenju.Upravljanje projektima, bilo koje vrste, suštinski, predstavlja veoma složenproces odlučivanja uslovljen velikim brojem ulaznih faktora. Ti faktori treba daomoguće fokusiranje na prioritete i ciljeve, praćenje realizacije, fleksibilnost uprevazilaženju teškoća, prilagođavanje promenama, te kontrolu nad ostvarenimrezultatima. Ovakav način upravljanja zahteva korišćenje proverenih tehnika i alata tetimski rad angažovanih na ...Cvjetko P. Stojanović. "Model upravljanja investicionim projektima otvaranja površinskih kopova uglja" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2015-04-27)
-
Open Educational Resources in Serbia
... of The University of Belgrade Faculty of Mining and Geology archives faculty publications available in open access, as well as the employees' publications. - The Repository is available at: www.dr.rgf.bg.ac.rs Chapter # - will be assigend by editors OPEN EDUCATIONAL RESOURCES IN SERBIA AUTHOR(s) ...
... the initiator of the Open Education Initiative Serbia, which is intended for all those who work in education and share the view that knowledge is a common good and that it should be available for everyone. Ranka Stanković University of Belgrade, Faculty of Mining and Geology Đušina 7 ...
... provides a review of open educational resources in Serbia. It covers different aspects of open educational resources: policy, resources, licenses, curriculum and teaching methodology, outcome, stakeholders and impact. All mentioned aspects give an overview of the current state of open educational resources ...Ivan Obradović, Ranka Stanković, Marija Blagojević, Danijela Milošević. "Open Educational Resources in Serbia" in Current State of Open Educational Resources in the “Belt and Road” Countries, Springer Singapore (2020). https://doi.org/10.1007/978-981-15-3040-1_10
-
Model upravljanja investicionim projektima otvaranja površinskih kopova uglja
Cvjetko P. Stojanović (2015-04-27)Brze promene u okruženju pred rukovodioce postavljaju mnogobrojne zahteve,pre svega, one koji se tiču ostvarenja ciljeva u zadatom vremenu i raspoloživimsredstvima što zahteva fleksibilan pristup u organizovanju aktivnosti i efikasnost unjihovom sprovođenju.Upravljanje projektima, bilo koje vrste, suštinski, predstavlja veoma složenproces odlučivanja uslovljen velikim brojem ulaznih faktora. Ti faktori treba daomoguće fokusiranje na prioritete i ciljeve, praćenje realizacije, fleksibilnost uprevazilaženju teškoća, prilagođavanje promenama, te kontrolu nad ostvarenimrezultatima. Ovakav način upravljanja zahteva korišćenje proverenih tehnika i alata tetimski rad angažovanih na ...Cvjetko P. Stojanović. "Model upravljanja investicionim projektima otvaranja površinskih kopova uglja" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2015-04-27)
-
Multi-Criteria Approach for Selecting Optimal Dozer Type in Open-Cast Coal Mining
Ivan Janković, Stevan Đenadić , Dragan Ignjatović , Predrag Jovančić , Tomislav Šubaranović, Ivica Ristović (2019)... the analytical hierarchy process (AHP). Keywords: analytical hierarchy process (AHP); dozers; coal mining; open-cast mining 1. Introduction The process of ore exploitation in open-cast coal mining is complex and demands hiring many people and providing varied equipment. In order to provide continuous ...
... the analytical hierarchy process (AHP). Keywords: analytical hierarchy process (AHP); dozers; coal mining; open-cast mining 1. Introduction The process of ore exploitation in open-cast coal mining is complex and demands hiring many people and providing varied equipment. In order to provide continuous ...
... Selecting Optimal Dozer Type in Open-Cast Coal Mining Ivan Jankovic 1, Stevan Djenadic 2, Dragan Ignjatovic 2, Predrag Jovancic 2, Tomislav Subaranovic 2 and Ivica Ristovic 2,* 1 Ministry of Mining and Energy, 11000 Belgrade, Serbia; ivan.jankovic@mre.gov.rs 2 Faculty of Mining and Geology, University of ...Ivan Janković, Stevan Đenadić , Dragan Ignjatović , Predrag Jovančić , Tomislav Šubaranović, Ivica Ristović . "Multi-Criteria Approach for Selecting Optimal Dozer Type in Open-Cast Coal Mining" in Energies, MDPI (2019). https://doi.org/https://doi.org/10.3390/en12122245
-
Definition of criteria and alternatives for choosing the optimal mining method deposits when applying multi: Criteria optimization, Belgrade, June 2024
Sanja Bajić, Dragoljub Bajić, Branko Gluščević, Radmila Gaćina, Josip Išek. "Definition of criteria and alternatives for choosing the optimal mining method deposits when applying multi: Criteria optimization, Belgrade, June 2024" in Podzemni radovi, Beograd, jun 2024, Centre for Evaluation in Education and Science (CEON/CEES) (2024). https://doi.org/10.5937/podrad2444071B
-
Eksploatacioni učinci ugljenih sistema na površinskom kopu Tamnava–Zapadno polje
U radu su analizirani eksploatacioni učinci ugljenih sistema na površinskom kopu Tamnava–Zapadno polje. Period analize je prvih šest meseci tekuće godine. Analiza je vršena sa aspekta ostvarene proizvodnje, kvaliteta uglja, efektivnog vremena rada, kapacitetnog i vremenskog iskoršćenja i zastoja sistema. Za poređenje podataka različitih parametara koji po svojoj prirodi nisu međusobno uporedivi, u radu su korišćene metode višekriterijumskog odlučivanja.... Brito-Parada, R. (2019). Multi-criteria decision making for the choice problem in mining and mineral processing: Applications and trends. Expert [8] Bazzazi, A. A., Osanloo, M., & Karimi, B. (2011). Deriving preference order of open pit mines equipment through MADM methods: Application of modified VIKOR method ...
... Eksploatacioni učinci ugljenih sistema na površinskom kopu Tamnava–Zapadno polje Exploatation effects of coal systems on the open pit mine Tamnava–West field Marko Lazić[footnoteRef:1], Filip Miletić[footnoteRef:2], Milena Lekić2, Veljko Rupar2, Željko Petrović[footnoteRef:3], Lazar ...
... uporedivi, u radu su korišćene metode višekriterijumskog odlučivanja. Abstract: This paper analyzed the exploitation effects of coal systems at the open–pit mine Tamnava–West field for the first six months of the current year. The analysis was performed in the aspect of reached production, coal quality ...Marko Lazić, Filip Miletić, Milena Lekić, Veljko Rupar, Željko Petrović, Lazar Žujović . "Eksploatacioni učinci ugljenih sistema na površinskom kopu Tamnava–Zapadno polje" in 10th International Conference Coal 2021, Jugoslovenski komitet za površinsku eksploataciju, Zlatibor (2021)
-
Analiza primene višekriterijumskih metoda u optimizaciji izbora hidruličnih bagera na površinskim kopovima uglja
Hidraulični bageri primenjuju se u različitim oblastima privrede a najzastupljeniji su u građevinarstvu i rudarstvu. Na površinskim kopovima sa kontinualnim sistemima, klasifikuju kao pomoćna mehanizacija a na površinskim kopovima sa diskontinualnim sistemima, kao osnovna mehanizacija. Kako je u oba slučaja njihova primena neizostavna, važno je izvršiti adekvatnu analizu postojećih podataka, u cilju optimizacije izbora tipa hidrauličnog bagera u odnosu na uslove rada datog površinskog kopa. U radu su opisane različite višekriterijumske metode koje su korišćene za analizu hidrauličnih bagera. ...... SELECTION OF HYDRAULIC EXCAVATORS ON OPEN-CAST COAL MINING Hydraulic excavators are used in different areas of industry, most often in construction and mining. On open-cast coal mines with continuous systems, they are classified as auxiliary machinery, while on open- cast coal mines with discontinuous ...
... 021, 2010. [8] Bescetin A, A decision support system using analy- tical hierarchy process (AHP) for the optimal envoi- rmental reclamation of an open-pit mine. Eviron- mental Geology, 52, pp. 663-672. 2007. [9] Mohamadibadi H S, Tichkowsky G, Kumar, A. De- velopment of a Multi-Criteria Assessment ...
... Претрага репозиторијума доступна је на www.dr.rgf.bg.ac.rs The Digital repository of The University of Belgrade Faculty of Mining and Geology archives faculty publications available in open access, as well as the employees' publications. - The Repository is available at: www.dr.rgf.bg.ac.rs S. ĐENADIĆ i ...Stevan Đenadić, Predrag Jovančić, Dragan Ignjatović, Filip Miletić, Ivan Janković. "Analiza primene višekriterijumskih metoda u optimizaciji izbora hidruličnih bagera na površinskim kopovima uglja" in Tehnika, Centre for Evaluation in Education and Science (CEON/CEES) (2019). https://doi.org/10.5937/tehnika1903369D
-
Побољшање ефикасности одлучивања у рударству применом линеарних оптимизационих модела
Трајче Бошевски (2021)Одлучивање и управљање у рударству је захтеван и сложен задатак изложен ризицима. Конвенционални-искуствени приступи доношења одлука, у пракси често показују слабост која се огледа у недовољној поузданости и прецизности. Предмет истраживања докторске дисертације, под називом „Побољшање ефикасности одлучивања у рударству применом линеарних оптимизационих модела“ је да, сагледавањем научних метода линеарног програмирања, приступи формирању локацијских модела који би били засновани на анализи и прилагођавању постојећих и увођењу нових претпоставки за случајеве као што је експлоатација и потрошња кречњака. У дисертацији ...Трајче Бошевски. Побољшање ефикасности одлучивања у рударству применом линеарних оптимизационих модела, [Т. Бошевски], 2021