Highway construction in fossil landslides zones – Lessons learned from the Grdelica Gorge, Serbia
Landslides are common on roads, which directly affect the flow of traffic and the connection and functioning of the population in surrounding area. Therefore, it is necessary to investigate them in the shortest possible time and to determine and carry out the remediation solution. Functionality of the state roads is immensely important so it is necessary to ensure that the traffic is maintained during remediation activities. Therefore, design solutions and remediation execution technology should be adapted to these requirements. ...Biljana Abolmasov, Marinos Skempas, Svetozar Milenković, Janko Radovanović, Miloš Marjanović. "Highway construction in fossil landslides zones – Lessons learned from the Grdelica Gorge, Serbia" in 5th Regional symposium on landslides in Adriatic–Balkan Region, 23-26 March 2022, Faculty of Civil Engineering, University of Rijeka and Faculty of Mining, Geology and Petroleum Engineering, University of Zagreb (2022)
-
Underground loading-haulage equipment selection with application of topsis method with different weighting methods of criteria
The choice of adequate mining machines is one of the most complex problems in the underground exploitation of mineral raw materials. The weight of such a decision is reflected in the high prices of these machines and the occurrence of even greater costs during their use if their choice was wrongly conceived. There are numerous examples from practice in which such decisions were made solely on the basis of comparing the prices of machines, without considering any of the ...utovarno-transportna mehanizacija, izbor, TOPSIS, entropija, standardna devijacija, težina kriterijumaVladimir Krivošić, Luka Crnogorac, Rade Tokalić. "Underground loading-haulage equipment selection with application of topsis method with different weighting methods of criteria" in Underground mining engineering, University of Belgrade - Faculty of Mining and Geology (2024)
-
Linear-motor plunger pump increases lifting efficiency
Bojan Martinović, Dušan Đekić, Dušan Danilović, Pavel Isaev. "Linear-motor plunger pump increases lifting efficiency" in Oil & Gas Journal (2022)
-
WP4-Availability of Water Resources
Stevanović Zoran, Ristić-Vakanjac Vesna, Milanović Saša. "WP4-Availability of Water Resources" in Climate Changes and Impacts on Water Supply, Beograd, Srbija:Rudarsko-geološki fakultet (2012): 133-176
-
Development of terminological resources for expert knowledge: a case study in mining
Ljiljana Kolonja, Ranka Stanković, Ivan Obradović, Olivera Kitanović, Aleksandar Cvjetić. "Development of terminological resources for expert knowledge: a case study in mining" in Knowledge Management Research & Practice, Palgrave Macmillan (2015). https://doi.org/10.1057/kmrp.2015.10
-
Assessment of Landscape Sensitivity Based on Geochemical Characteristics of Sediments (Kremna Basin, Serbia)
Kašanin-Grubin Milica, Šajnović Aleksandra, Perunović Tamara, Stojanović Ksenija, Simić Vladimir, Gajica Gordana, Brčeski Ilija (2018)Kašanin-Grubin Milica, Šajnović Aleksandra, Perunović Tamara, Stojanović Ksenija, Simić Vladimir, Gajica Gordana, Brčeski Ilija. "Assessment of Landscape Sensitivity Based on Geochemical Characteristics of Sediments (Kremna Basin, Serbia)" in Natural Resources and Sustainable Development 2 no. 8, Oradea, Debrecen:University of Oradea, Faculty of Enviromental Protection Enviromental Engineering Department and University of Debrecen, Faculty of Agricultural and Food Sciences and Environmental Management (2018): 148-165. https://doi.org/10.31924/nrsd.v8i2.016
-
Mesozoic carbonate rocks in Serbia used as dimension stone
Matović Vesna, Vojnović Ćalić Tijana (2015)Matović Vesna, Vojnović Ćalić Tijana. "Mesozoic carbonate rocks in Serbia used as dimension stone" in Bulletin of Engineering Geology and the Environment, :Springer (2015). https://doi.org/10.1007/s10064-015-0722-0
-
Development of an integrated model for open-pit-mine discontinuous haulage system optimization
Miodrag Čelebić, Dragoljub Bajić, Sanja Bajić, Mirjana Banković, Duško Torbica, Aleksej Milošević , Dejan Stevanović (2024)Miodrag Čelebić, Dragoljub Bajić, Sanja Bajić, Mirjana Banković, Duško Torbica, Aleksej Milošević , Dejan Stevanović . "Development of an integrated model for open-pit-mine discontinuous haulage system optimization" in Sustainability, MDPI (2024). https://doi.org/10.3390/su16083156
-
A business intelligence approach to mine safety management
Ljiljana Kolonja, Ranka Stanković, Ivan Obradović, Olivera Kitanović, Dejan Stevanović, Marija Radojičić (2016)... Mining and Geology research team in the development of a business intelligence system for accident analysis in mines. Mining engineering, as all other engineering disciplines, generates large amounts of heterogeneous data and needs interoperability among various related information technology applications ...
... A. and J.L. Dietz, The benefit of enterprise ontology in identifying business components, in The Past and Future of Information Systems: 1976–2006 and Beyond. 2006, Springer. p. 243-254. 12. Grimaldi, J.V. and R.H. Simonds, Safety management. 1975: Irwin. 13. Dhillon, B.S., Engineering safety: ...
... References 1. Danihelka, P., Safety and Security Research and its Relation to VŠB-TU Ostrava. Transactions of the VSB-Technical University of Ostrava, Safety Engineering Series, 2012. 7(2): p. 1-5. 2. Vaught, C., et al., Knowledge management and transfer for mine emergency response. In ...Ljiljana Kolonja, Ranka Stanković, Ivan Obradović, Olivera Kitanović, Dejan Stevanović, Marija Radojičić . "A business intelligence approach to mine safety management" in 13th International Symposium Continuous Surface Mining, Beograd : Yugoslav Opencast Mining Committee (2016)
-
Correlation Between Dynamic CBR and Compaction and Bearing Capacity of Pavement Foundation Layers
This paper presents a dynamic California Bearing Ratio (CBRd) device that can be used on a prepared pavement foundation layer to obtain a certain parameter of the tested material in the laboratory and in situ in a direct and fast way. For the selected natural material (gravel), it is shown that the laboratory CBRd can be used to estimate the compaction and bearing capacity, because it correlates well with the parameters of the standard and modifed Proctor compaction tests. ...korelacija parametara, donji slojevi saobraćajnica, laboratorijska i terenska ispitivanja, dinamički kalifornijski indeks nosivosti CBRd... ]. Sulewska, “Dynamic CBR as a method of embankment assessment,” Proc. 18% International Conference on Soil Mechanics and Geotechnical Engineering, Paris (2015). Forschungsgesellschaft fur Strafšen - und Verkehrswesen, “Prifverfahren zur Bestimmung des CBR-Wertes (California bearing ratio),” in: Technische ...
... of Belgrade Faculty of Mining and Geology archives faculty publications available in open access, as well as the employees' publications. - The Repository is available at: www.dr.rgf.bg.ac.rs DO!I 10.1007/511204-024-09939-x Soil Mechanics and Foundation Engineering, Vol. 61, No. 1, March, 2024 (Russian ...
... the strength of a material, and depends on factors such as the grain size distribution, shape, and roughness of the grain, water content, and compaction, and can be expressed in the range of 20% < CBR, < 150% [6]. A CBR, test can be performed in the laboratory (CBR,) and in situ (CBR+p) (Fig. 1). ...Milan Bogdanović, Snežana Bogdanović, Dragoslav Rakić, Irena Basarić Ikodinović. "Correlation Between Dynamic CBR and Compaction and Bearing Capacity of Pavement Foundation Layers" in Soil Mechanics and Foundation Engineering, Springer Science and Business Media LLC (2024). https://doi.org/10.1007/s11204-024-09939-x
-
Noise management - Case study Buvač open cast mine
Aleksandar Cvjetić, Ljubica Figun, Vladimir Milisavljević, Uroš Pantelić, Aleksandra Tomašević (2015)Aleksandar Cvjetić, Ljubica Figun, Vladimir Milisavljević, Uroš Pantelić, Aleksandra Tomašević. "Noise management - Case study Buvač open cast mine" in Mining and Environmental Protection, 5th International Symposium, Beograd:Rudarsko-geološki fakultet, Center for Environmental Engineering (2015): 410-419
-
Развој хибридног модела за оптиматизацију завршне контуре одлагалишта у површинској експлоатацији лежишта минералних сировина
Aлександар Додеровић (2024)Површинска експлоатација минералних сировина захтијева претходно откопавање значајних( милионских) количина јаловине, које је неопходно транспортовати до локације на којој ће сеона трајно одложити. Традиционални приступ избора локације и дизајна одлагалишта се карактерише парцијалним приступом, заснованом на анализи неколико водећих критеријума као и на личном искуству инжењера, често занемарујући синергетски ефекат осталих утицајних фактора Технолошке операције које се односе на манипулацију јаловином, међу којима предњачи транспорт, генеришу највећи дио трошкова у површинској експлоатацији. Такође, цјелокупан процес експлоатације додатно је ограничен ...оптимизације завршне контуре одлагалишта, хибридни модел, површинска експлоатација, генетски алгоритамAлександар Додеровић. Развој хибридног модела за оптиматизацију завршне контуре одлагалишта у површинској експлоатацији лежишта минералних сировина, Београд : [А. Додеровић], 2024
-
From post-disaster landslides inventory to open landslides data
Biljana Abolmasov, Miloš Marjanović, Uroš Đurić, Jelka Krušić. "From post-disaster landslides inventory to open landslides data" in Proceedings of 3rd European Regional Conference of IAEG/ Athens/ Greece/ 6-10 October 2021, International Association for Engineering Geology and the Environment (2021)
-
Definition of criteria and alternatives for choosing the optimal mining method deposits when applying multi: Criteria optimization, Belgrade, June 2024
Sanja Bajić, Dragoljub Bajić, Branko Gluščević, Radmila Gaćina, Josip Išek. "Definition of criteria and alternatives for choosing the optimal mining method deposits when applying multi: Criteria optimization, Belgrade, June 2024" in Podzemni radovi, Beograd, jun 2024, Centre for Evaluation in Education and Science (CEON/CEES) (2024). https://doi.org/10.5937/podrad2444071B
-
Mikroelementi u uljnim šejlovima Aleksinca i njihov uticaj na životnu sredinu
Nikoleta Aleksić (2021)... Soils, Environmental Science & Technology 46, 1035−1043. 7. Abel, S., Nybom, I., Mäenpää, K., Hale, E.S., Cornelissen, G., and Akkanen, J. 2017. Mixing and capping techniques for activated carbon based sediment remediation - efficiency and adverse Effects for Lumbriculus variegatus, Water Research ...
... Separation and purification Technology , 38 (1), 11-41 [6] Kobya, M., Demirbas, E., Ulu, F. (2016). Evaluation of operating parameters with respect to charge loading on the removal efficiency of arsenic from potable water by electrocoagulation. Journal of Environmental Chemical Engineering, 4, 1484–1494 ...
... Treatment Technologies. Critical Reviews in Environmental Science and Technology, 41, 807-878. [6] Darwesh, O.M., Matter, I.A., Eida, M.F. (2019).Development of enzyme immobilized magnetic nanoparticles for bioremediation of textile wastewater dyes. Engineering, 7, 102805. [7] Nilsson, R., Norlinder ...Nikoleta Aleksić. "Mikroelementi u uljnim šejlovima Aleksinca i njihov uticaj na životnu sredinu" in VIII Memorijalni naučni skup iz zaštite životne sredine „Docent dr Milena Dalmacija“, 2021, Prirodno-matematički fakultet, Novi Sad (2021)
-
Parametri zbijanja komunalnog otpada određeni različitim laboratorijskim metodama
Jovana M Janković Pantić, Dragoslav R Rakić, Irena G Basarić Ikodinović, Tina D Đurić, Snežana Bogdanović (2021)Zbijanje komunalnog otpada predstavlja jednu od osnovnih faza korišćenja komunalne deponije. Zbog toga je kao i kod drugih nasutih građevina, veoma korisno odrediti parametre zbijanja: maksimalnu suvu zapreminsku težinu (dmax) i optimalnu vlažnost (wopt). Dobijeni rezultati mogu da posluže prilikom projektovanja kapaciteta deponije kao i prilikom definisanja obradivosti otpada. U dosadašnjoj praksi najčešći način određivanja parametra zbijanja je standardna metoda (Proktorov opit) koja se koristi u mehanici tla, uz eventualnu redukciju energije zbijanja. Međutim, različiti tretmani komunalnog otpada na ...... фс geotechnical classification of municipal waste landfills т Serbia, Environmental Geotechnics, Vol. 7, Issue 7. 2020, pp. 501-511. Reddy K.P., Hettiarachch H., Naveen P., Janardhanan G., Jean B., Thomas L.: Hydraulic Conductivity of MSW т Landfills, Journal ol Environmental Engineering 135(8) ...
... Kawano Y., Kameda M., Fukvi S., Koelsch F., and Yonai, У : Mechanical Properties of Minicipal Waste Deposits апа Ground Improvement, Proceedings of the Sixteenth International Coference on Soil Mechanich and Geotechnical Enginering, Volume 4, Millpress Science Publishers, Rotterdam, (ће Nethcrlands ...
... Сотраспоп Characteristics of Municipal Solid Waste, Journal ог Geotechnical and Geocnvironmcental Engincering, Vol. 136, No. 8., 2010, pp. 1095-1102. Hettiarachchi C.H.: Mechanics of Biocell landfill settlements, Ph.D Dissertation, New Jersay Institute of Technology, Newark, NY, 2005. ltoh T., Тоећаја ...Jovana M Janković Pantić, Dragoslav R Rakić, Irena G Basarić Ikodinović, Tina D Đurić, Snežana Bogdanović . "Parametri zbijanja komunalnog otpada određeni različitim laboratorijskim metodama" in Građevinski kalendar, Savez građevinskih inženjera Srbije (2021)
-
Self-Engineering: Possibilities for Maintenance Operations in the Mining Machines Industry
Self-engineering is a relatively new branch of knowledge that aims to understand how systems could “autonomously” re-configure or repair themselves without the intervention of the operators. A direct field of application is within the maintenance spectrum. Having systems or machines capable of self-detecting or even self-repairing could represent a game-changer, in capital asset fields such as the mining industry in particular. This paper aims to investigate the possible benefits and challenges of self-engineering / self-maintenance concerning mining machines, specifically bucket-wheel ...self-engineering, self-maintenance, maintenance operations, mining industry, bucket-wheel excavator, gearbox revitalizationSteven Manders, Milorad Pantelić, Vladimir Milisavljević, Alberto Martinetti. "Self-Engineering: Possibilities for Maintenance Operations in the Mining Machines Industry" in SSRN Electronic Journal, Elsevier BV (2021). https://doi.org/10.2139/ssrn.3945979
-
Towards a Mining Equipment Ontology
... of information technology (IT) is today indispensable in almost all mining engineering areas, including mining equipment management and maintenance. Basically, IT is introduced through computer-aided information systems, with the aim of securing reliable information for management and decision making ...
... for mining engineering developed at the University of Belgrade Faculty of Mining and Geology, can be used for generating a mining equipment ontology. RudOnto is an integral part of a specialized mining engineering information system, which features functionalities for management and maintaining ...
... which contains over 900 terms and 200 synonyms covering major mining engineering areas including exploration, extraction, extractive metallurgy, geology, equipment, safety, and more,1 or the Corporate Equipment Taxonomy developed by Meridium Asset Performance Management Software2. Terminological resources ...Ranka Stanković, Ivan Obradović, Olivera Kitanović, Ljiljana Kolonja. "Towards a Mining Equipment Ontology" in Proceedings of the 12th International Conference Research and Development in Mechanical Industry, RaDMI 2012, September 2012, Vrnjačka Banja, Serbia no. 1, Vrnjačka Banja, Serbia : SaTCIP (Scientific and Technical Center for Intellectual Property) Ltd. (2012)
-
Multiple-Criteria Decision-Making in Mine Development Planning
Sanja Bajić (2023)The Borska Reka ore deposit is an experimental location where developed methodologies have been applied. It is the largest ore body within the Bor mining complex, which has been the subject of numerous studies and analyses for more than three decades. The paper focuses on the application of FAHP and the VIKOR method to address ranking of alternatives and select the optimal mining method by means of fuzzy multicriteria optimization.Sanja Bajić. "Multiple-Criteria Decision-Making in Mine Development Planning" in Proceedings of the 5th International Underground Excavations Symposium, 5-6-7 June 2023, Istanbul, Topkapi : Dinç Ofset Mat. Rek. San. ve Tic. Ltd. Şti. (2023)
-
Geochemical evaluation of dolostone deposits in Montenegro: Implications for potential industrial applications
Darko Bozovic, Vladimir Simic, Dragan Radulovic, Slobodan Radusinovic, Vesna Matovic, Anja Terzic (2024)This study presents a unique model for assessing the dependability of continuous parts of combined systems in open-pit mining through the application of fuzzy logic. Continuous sub-systems as part of the combined system of coal exploitation in surface mines have the basic function of ensuring safe operation, high capacity with high reliability, and low costs. These subsystems are usually part of the thermal power plant’s coal supply system and ensure stable fuel supply. The model integrates various independent partial ...примарне сировине, минералогија, физичко-механичка својства, технолошка својства, наука о материјалимаDarko Bozovic, Vladimir Simic, Dragan Radulovic, Slobodan Radusinovic, Vesna Matovic, Anja Terzic. "Geochemical evaluation of dolostone deposits in Montenegro: Implications for potential industrial applications" in Science of Sintering, Bor, August 2024, National Library of Serbia (2024). https://doi.org/10.2298/SOS240701029B