Analiza primene višekriterijumskih metoda u optimizaciji izbora hidruličnih bagera na površinskim kopovima uglja
Hidraulični bageri primenjuju se u različitim oblastima privrede a najzastupljeniji su u građevinarstvu i rudarstvu. Na površinskim kopovima sa kontinualnim sistemima, klasifikuju kao pomoćna mehanizacija a na površinskim kopovima sa diskontinualnim sistemima, kao osnovna mehanizacija. Kako je u oba slučaja njihova primena neizostavna, važno je izvršiti adekvatnu analizu postojećih podataka, u cilju optimizacije izbora tipa hidrauličnog bagera u odnosu na uslove rada datog površinskog kopa. U radu su opisane različite višekriterijumske metode koje su korišćene za analizu hidrauličnih bagera. ...... 2010. [8] Bescetin A, A decision support system using analy- tical hierarchy process (AHP) for the optimal envoi- rmental reclamation of an open-pit mine. Eviron- mental Geology, 52, pp. 663-672. 2007. [9] Mohamadibadi H S, Tichkowsky G, Kumar, A. De- velopment of a Multi-Criteria Assessment Model ...
... of the existing data in order to optimize the choice of the type of hydraulic excavator in relation to the working conditions of a particular open- cast mine. This paper aims to demonstrate the potential of multi-criteria optimization methods that are used in the analysis of hydraulic excavators. ...
... the quality of output information which can affect the future purchasing decisions of this machinery. Key words: multi-criteria methods, open-cast coal mine, auxiliary machines, hydraulic excavators. https://doi.org/10.1016/j.procs.2015.07.081 https://doi.org/10.1016/j.procs.2015.07.081 ...Stevan Đenadić, Predrag Jovančić, Dragan Ignjatović, Filip Miletić, Ivan Janković. "Analiza primene višekriterijumskih metoda u optimizaciji izbora hidruličnih bagera na površinskim kopovima uglja" in Tehnika, Centre for Evaluation in Education and Science (CEON/CEES) (2019). https://doi.org/10.5937/tehnika1903369D
-
Optimizacija i planiranje površinskih kopova stohastičkim modelima
Dejan R. Stevanović (2015-05-29)Savremeno rudarstvo izloženo je stalnom trendu pogoršanja uslova poslovanja.Mogućnost ostvarenja ekonomskih i drugih ciljeva rudarskog projektakompromitovana je stalnim pogoršanjem kvaliteta ležišta na kojima se vršieksploatacija, kao i značajnoj dozi neizvesnosti povezane sa geološkim,ekonomskim i tehničkim parametrima proizvodnje. U ovako kompleksnimuslovima poslovanja, matematički modeli sposobni da odgovore značajnimizazovima, odnosno ponude optimalna rešenja kojima se garantuje maksimalnoispunjenje projektovanih ciljeva, nameću se kao neophodnost.Trenutni, konvencionalni pristup optimizaciji i planiranju površinskih kopovazasniva se na algoritmima, razvijenim sredinom prošlog veka čije je opšteobeležje deterministički ...površinski kop, planiranje, optimizacija, stohastički modeli, kontrola kvaliteta uglja, neizvesnost.... production planning on the lignite open pit. Second model that is being developed is hybrid type. It has stochastic (Monte Carlo method) and deterministic component and treats the problem of optimization of open pit boundaries. Keywords: open pit mine, planning, optimization, stochastic models ...
... of waste transportation system for open pit Buvač, Tehnika, Beograd Mario, J. M, Salma, J, P, 1973, Ore Reserve Education and Open Pit Planning, X-ti APCOM, Johanesburg, South Africa Martinez, L. A. 2003. Can quantification of geological risk improve open pit mine design? MPhil, In Academic. DepartmentThe ...
... stohastičkim modelima;Open pit mine optimization and planning with stochastic models Dejan R. Stevanović Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Optimizacija i planiranje površinskih kopova stohastičkim modelima;Open pit mine optimization and planning ...Dejan R. Stevanović. "Optimizacija i planiranje površinskih kopova stohastičkim modelima" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2015-05-29)
-
Optimizacija utovarno-transportnih sistema u funkciji planiranja površinskog kopa
Mirjana V. Banković (2018-07-13)Profitabilna eksploatacija sve složenijih ležišta je težak zadatak koji zavisi odtemeljnog procesa analize, planiranja i projektovanja rudnika. Izvodljiv strateškiplan mora da zadovoljava društvena, regulatorna, tehnološka, geometrijska iekonomska ograničenja. Kako bi se postigao osnovni cilj, odnosno profitabilnost iodrživost rudarskog projekta na duži period, neophodno je unapređenjematematičkih modela i informatičke podrške procesima planiranja i optimizacijekoji će omogućiti efikasnu realizaciju ovih ciljeva...tehnološki model, integralni model, planiranje, optimizacija,utovarno-transportni sistem, neto sadašnja vrednost projekta... shovel-truck system in open pit mines. International Journal of Surface Mining, Reclamation and Environment, 6 (2), 57-59. Dagdelen, K., 1985, Optimum multi period open pit mine production scheduling. PhD Thesis, Colorado School of Mines. Dagdelen, K., 1986, Optimum open pit mine production scheduling ...
... Optimum design of open pit mines. Transactions CIM Bullitin, Vol. 58, 17-24. Li, Z., 1995, Truck-haulage economics of mining open pits by high bench. CIM bulletin, 88, 50-52. 200 Lizotte, Y., 1988, Economic and technical relations between open-pit design and equipment selection. Mine Planning and ...
... (ed.). Ramazan, S., 2001, Open pit mine scheduling based on fundamental tree algorithm. PhD Thesis, Colorado School of Mines. Arthur Lakes Library. Ramazan, S., Dagdelen, K., Johnson, T., 2005, Fundamental tree algorithm in optimising production scheduling for open pit mine design. Mining Technology ...Mirjana V. Banković. "Optimizacija utovarno-transportnih sistema u funkciji planiranja površinskog kopa" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2018-07-13)
-
WebGIS Cadastre of Abandoned Mines in Autonomous Province of Vojvodina
Ranka Stanković, Nikola Vulović, Nikola Lilić, Ivan Obradović, Radule Tošović, Milica Pešić-Georgiadis (2015)... facilities consist of a name, place, municipality, district and site address. Object type is selected from the list of provided terms: open pit, underground mine, processing, waste deposit, maintenance workshop, other facility. Data on cadastral parcel or parcels and the titleholder are entered if ...
... bench heights, the overall depth of the pit, volume, as well as general data collected during the field visit related to recultivation, water level (whether the mine is above, below, or above and below water level), as well as the site, for example, a pit, a landfill, workshop or plant. Figure 1 ...
... else needed to create a web GIS application. GeoServer is an open source tool designed in Java which enables users to serve spatial data. Its primary role is to serve as connection in an open spatial data infrastructure (SDI). Using the open 4 standards of the OGC, GeoServer allows significant ...Ranka Stanković, Nikola Vulović, Nikola Lilić, Ivan Obradović, Radule Tošović, Milica Pešić-Georgiadis. "WebGIS Cadastre of Abandoned Mines in Autonomous Province of Vojvodina" in Proceedings of the 5th International Symposium Mining And Environmental Protection,June 10-13,2015, Vrdnik, Serbia, Belgrade : Faculty of Mining and Geology (2015)
-
A Fuzzy Expert Model for Availability Evaluation
Each technical system within itself carries the great potential danger of possible occurrence of failure and damages. Mining machines are characteristic by great investment values, costs of unplanned shutdowns, complex working conditions, and environment and workers hazards. Systematic monitoring of the mining machinery is of great importance for the management of the mining companies. Availability is the overall concept of quality of service. Includes information regard to operating state, an idle state, a standby state and shut down. The ...... bulldozers that operate to three different open pit mines in Serbia was evaluated using the proposed expert model. Machines were compared individually (selected machine at selected open pit mine), but also integral comparisons between machines and open pit mines were made. Obtain results should be ...
... AVAILABILITY INDICATORS A n a ly st N o . A v a il a b il it y in d ic a to r Questionnaire: Bulldozer Liebherr – Drmno Open Pit Mine Grade: Excellent Good Average Adequate Poor The degree of affiliation, % 1 R 40 60 M 100 S 100 2 R 20 80 M 100 ...
... be used for the improvement of maintenance and logistic support at open pit mines, as well as an important parameter during the further purchase of this type of machines. Since the models based on experts’ opinions in principle carry a dose of subjectivity, the presented model and obtained results ...Dejan Ivezić, Miloš Tanasijević, Predrag Jovančić, Radiša Đurić. "A Fuzzy Expert Model for Availability Evaluation" in Proceedings of the 2019 20th International Carpathian Control Conference (ICCC), AGH University of Science and Technology, Kraków - Wieliczka, Poland (2019)
-
Model za optimizaciju graničnog saržaja metala u rudi u funkciji dugoročnog planiranja površinskih kopova
Daniel P. Kržanović (2016-06-14)Optimizacija graničnog sadržaja metala u rudi jedan je od osnovnih koraka u planiranju i dizajniranju površinskih kopova i ima za cilj postizanje maksimalne neto sadašnje vrednosti (NPV). Iz tog razloga, optimizacija graničnog sadržaja i danas je predmet mnogih istraživanja u rudarskoj nauci, sa ciljem rešavanja praktičnih problema u eksploataciji ležišta.Dugoročno planiranje eksploatacije na površinskim kopovima podrazumeva sagledavanje svih relevantih parametara i faktora (geologije rudnog ležišta, tehnologije proizvodnog procesa, kapaciteta otkopavanja i prerade, troškova, cena metala, iskorišćenja i dr) kako ...površinski kop, dugoročno planiranje, optimizacija graničnog sadržaja, maksimizacija neto sadašnje vrednosti (NPV).... W., Kuchta, M., 1995, Open pit mine planning and design, Balkema, Rottherdam, pp. 427-442. Hustrulid, W., Kuchta, M., 1998, Open Pit Mine Planning and Design, A.A. Balkema, Rotterdam, Netherlands, vol. 1, ISBN 9054101814. Hustrulid, W., Kuchta, M., 2006, Open Pit Mine Planning and Design – Volume ...
... 64-67. Dowd, P.A., Onur, A.H., 1992, Optimizing open pit design and sequencing, Proceedings of 23rd APCOM symp., Tucson, Arizona, pp. 411 – 422. Dowd, P.A., Onur, A.H., 1993, Optimization of Open-pit Mine Design-Part 1: Optimal Open-pit Design, Transactions of the Institute of Mining and ...
... Profitability Sensitivity Analysis of a Mining Venture, Mine Evaluation Seminar at the University of Minesota. Bernabe, D., Dagdelen, K., 2002, Comparative analysis of open pit mine scheduling techniques for strategic mine planning of TINTAYA copper mine in Peru, SME Annual Meeting. Berry, E.S., 1922 ...Daniel P. Kržanović. "Model za optimizaciju graničnog saržaja metala u rudi u funkciji dugoročnog planiranja površinskih kopova" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2016-06-14)
-
Improving efficiency of thermal power plants through mine coal quality planning and control
Главни циљ контроле квалитета угља у рудницима лигнита је снабдевање термоелектрана угљем чији квалитет мора да се креће унутар одређених квалитативних ограничења. Карактеристике угља могу да утичу на ефикасност, поузданост и расположивост како котла тако и јединица за контролу емисије. У овом раду аутори су презентовали интегрисану симулацију рударског процеса као нови приступ у истраживању променљивости калоричне вредности угља приликом експлоатације комплексног лежишта лигнита. Резултати таквог приступа омогућавају драгоцен увид у перформансе континуалног рударског система у смислу контроле променљивости ...Mirjana Banković, Dejan Stevanović, Milica Pešić, Aleksandra Tomašević, Ljiljana Kolonja. "Improving efficiency of thermal power plants through mine coal quality planning and control" in Thermal Science, Vinča Institute of Nuclear Sciences (2018). https://doi.org/10.2298/TSCI170605209B
-
Eksploatacioni učinci ugljenih sistema na površinskom kopu Tamnava–Zapadno polje
U radu su analizirani eksploatacioni učinci ugljenih sistema na površinskom kopu Tamnava–Zapadno polje. Period analize je prvih šest meseci tekuće godine. Analiza je vršena sa aspekta ostvarene proizvodnje, kvaliteta uglja, efektivnog vremena rada, kapacitetnog i vremenskog iskoršćenja i zastoja sistema. Za poređenje podataka različitih parametara koji po svojoj prirodi nisu međusobno uporedivi, u radu su korišćene metode višekriterijumskog odlučivanja.... Eksploatacioni učinci ugljenih sistema na površinskom kopu Tamnava–Zapadno polje Exploatation effects of coal systems on the open pit mine Tamnava–West field Marko Lazić[footnoteRef:1], Filip Miletić[footnoteRef:2], Milena Lekić2, Veljko Rupar2, Željko Petrović[footnoteRef:3], Lazar ...
... uporedivi, u radu su korišćene metode višekriterijumskog odlučivanja. Abstract: This paper analyzed the exploitation effects of coal systems at the open–pit mine Tamnava–West field for the first six months of the current year. The analysis was performed in the aspect of reached production, coal quality, effective ...
... mining and mineral processing: Applications and trends. Expert [8] Bazzazi, A. A., Osanloo, M., & Karimi, B. (2011). Deriving preference order of open pit mines equipment through MADM methods: Application of modified VIKOR method. Expert Systems with Applications, 38(3), 2550-2556;Systems with Applications ...Marko Lazić, Filip Miletić, Milena Lekić, Veljko Rupar, Željko Petrović, Lazar Žujović . "Eksploatacioni učinci ugljenih sistema na površinskom kopu Tamnava–Zapadno polje" in 10th International Conference Coal 2021, Jugoslovenski komitet za površinsku eksploataciju, Zlatibor (2021)
-
Multi-Criteria Approach for Selecting Optimal Dozer Type in Open-Cast Coal Mining
Ivan Janković, Stevan Đenadić , Dragan Ignjatović , Predrag Jovančić , Tomislav Šubaranović, Ivica Ristović (2019)... continuous (twenty-four hours a day) production and to excavate the planned amount of ore and overburden in an open-cast coal mine, it is necessary to achieve optimal working conditions. The operational efficiency of the basic (continuous) machinery is in a direct correlation with the work of the auxiliary ...
... (discontinuous) machinery, whose role is to accomplish all of the auxiliary workings on time. In effect, in the process of production in an open-cast coal mine, there must always be several different auxiliary machines available. The absence or insufficient number of the adequate auxiliary machinery ...
... method of evaluation is supposed to show the connection between the characteristics of the machines and the exact working conditions in the open-cast coal mine, leading to the right choice of machine in relation to those conditions. Energies 2019, 12, 2245; doi:10.3390/en12122245 www.mdpi.com/journ ...Ivan Janković, Stevan Đenadić , Dragan Ignjatović , Predrag Jovančić , Tomislav Šubaranović, Ivica Ristović . "Multi-Criteria Approach for Selecting Optimal Dozer Type in Open-Cast Coal Mining" in Energies, MDPI (2019). https://doi.org/https://doi.org/10.3390/en12122245
-
A Knowledge-Based Approach to Mine Ventilation Planning in Yugoslav Mining Practice
Ventilation system analysis is a complex process based on the calculation and analysis of numerous parameters. These problems can be successfully solved by the SimVent numerical package, but a full understanding and use of the obtained results require the involvement of an experienced specialist in the ventilation field. The solution was found in the creation of a hybrid system INVENTS, whose knowledge base represents a formalization of the expert knowledge in the mine ventilation field. In this paper, we ...... the total air flow volume is 42.4 m3/s. The workings in the pit are ventilated auxiliary, in a compression mode, with the use of axial fans of the APXE-630 type. In order to assess the overall mine ventilation system state of the “Soko” mine the following measurements were initially undertaken: te ...
... 03:36:16 A Knowledge-Based Approach to Mine Ventilation Planning in Yugoslav Mining Practice Nikola Lilić, Ivan Obradović, Ranka Stanković Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] A Knowledge-Based Approach to Mine Ventilation Planning in Yugoslav Mining ...
... faculty publications available in open access, as well as the employees' publications. - The Repository is available at: www.dr.rgf.bg.ac.rs Mineral Resources Engineering, Vol. 11, No. 4 (2002) 361–382 c© Imperial College Press A KNOWLEDGE-BASED APPROACH TO MINE VENTILATION PLANNING IN YUGOSLAV ...Nikola Lilić, Ivan Obradović, Ranka Stanković. "A Knowledge-Based Approach to Mine Ventilation Planning in Yugoslav Mining Practice" in Mineral Resources Engineering 11 no. 4, Imperial College Press (2002): 361-382. https://doi.org/10.1142/S0950609802001014
-
A WebGIS Decision Support System for Management of Abandoned Mines
Ranka Stanković, Nikola Vulović, Nikola Lilić, Ivan Obradović, Radule Tošović, Milica Pešić-Georgiadis (2016)... average bench heights, the overall depth of the pit, volume, as well as general data collected during the field visit related to reclamation, water level (whether the mine is above, below, or above and below water level), as well as the site, for example, a pit, a landfill, workshop or plant. Figure 8 shows ...
... resources domain. This includes, in particular: (a) urban development, namely its impact on the environment, especially the wider area around the open pit; (b) spatial planning of the same wider area within reclamation; (c) the soil and its relationship with agricultural activities in the wider area ...
... was mostly used for geoprocessing and supporting calculations. The most important technical and technological factors: degraded area, volume of open pit, type of mineral resource, remediation type, type of mining site or facility, legal and working status, and type of ownership. Energies 2016 ...Ranka Stanković, Nikola Vulović, Nikola Lilić, Ivan Obradović, Radule Tošović, Milica Pešić-Georgiadis. "A WebGIS Decision Support System for Management of Abandoned Mines" in Energies 7 no. 9 (2016): 567. https://doi.org/10.3390/en9070567
-
Maceralni sastav i rang uglja Ibarskog basena
Donjemiocenski ugljonosni Ibarski basen se nalazi u južnoj Srbiji. Intramontanski ektenzivni basen, izdužen u pravcu severozapad-jugoistok ispunjen je slatkovodnim sedimentima koji su formirani kao deo Dinarskog neogenog jezerskog sistema. Paleoreljef basena izgrađen je od paleozojskih amfibolskih škriljaca, sericit-hloritskih škriljaca, krečnjaka, mermera i metabazičnih stena, mezozojskih peščara, laporca, laporovitih krečnjaka, krečnjaka, dolomita, ofiolita i oligo-/miocenskih magmatskih stena. Tercijarne magmatske stene izgrađene su od oligocenskih dacito-andezita i neogenih kvarctlatita/riodacita i piroklastičnih stena. Miocenski sedimenti izgrađeni su od aluvijalnih breča, konglomerata, peščara, ...Željana Novković, Nevena Andrić -Tomašević, Vladimir Simić, Dragana Životić. "Maceralni sastav i rang uglja Ibarskog basena" in 18. Kongres geologa Srbije "Geologija rešava probleme", Divčibare, 01-04 jun 2022., Srpsko geološko društvo (2022)
-
Concept od predictive hydrodynamic calculations: An overview of the case studies from Serbia
Dušan Polomčić, Dragoljub Bajić, Jelena Ratković, Vesna Ristić Vakanjac, Marina Čokorilo Ilić (2019)groundwater management, hydrodynamic model, multiple-criteria decision making, open cast mine, groundwater source.0Dušan Polomčić, Dragoljub Bajić, Jelena Ratković, Vesna Ristić Vakanjac, Marina Čokorilo Ilić. "Concept od predictive hydrodynamic calculations: An overview of the case studies from Serbia" in National Conference with international participation “Geosciences 2019”, Bulgaria, 2019, Sofia : Bulgarian Geological Society (2019)
-
Keyword-Based Search on Bilingual Digital Libraries
This paper outlines the main features of Biblisha, a tool that offers various possibilities of enhancing queries submitted to large collections of aligned parallel text residing in bilingual digital library. Biblishsa supports keyword queries as an intuitive way of specifying information needs. The keyword queries initiated, in Serbian or English, can be expanded, both semantically, morphologically and in other language, using different supporting monolingual and bilingual resources. Terminological and lexical resources are of various types, such as wordnets, electronic ...Ranka Stanković, Cvetana Krstev, Duško Vitas, Nikola Vulović, Olivera Kitanović. "Keyword-Based Search on Bilingual Digital Libraries" in Semantic Keyword-Based Search on Structured Data Sources - Second COST Action IC1302 International KEYSTONE Conference, IKC 2016, Springer (2017). https://doi.org/10.1007/978-3-319-53640-8_10
-
Soil oscillation law parameter determination with the application of Lagrange’s theorem at “Kovilovača“ open pit
... “Kovilovača“ open pit Suzana Lutovac, Nebojša Vidanović, Čedomir Beljić, Zoran Gligorić Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Soil oscillation law parameter determination with the application of Lagrange’s theorem at “Kovilovača“ open pit | Suzana Lutovac ...
... the functional cor- relation is accepted as a good one. 4 REVIEW OF MASSIVE BLASTING AT THE “KOVILOVAČA“ OPEN PIT - DESPOTOVAC 4.1 General characteristics of the “Kovilovača" open pit The “Kovilovača“ limestone deposits have an exceptionally simple geological structure. Limestones of this ...
... Tokalić R.; (2008): Analysis of the Soil Oscillation Law in the Example of the Open Pit „Kovilovača“, Podzemni radovi No.16, pp. 47-56, December 2008, RGF Belgrade. [10] Savić M., (2000): Blasting at the Open Pits, Monograph, RTB Bor, Copper Institute Bor, Indok Center, Bor, pp. 317, (In ...Suzana Lutovac, Nebojša Vidanović, Čedomir Beljić, Zoran Gligorić. "Soil oscillation law parameter determination with the application of Lagrange’s theorem at “Kovilovača“ open pit" in Mining and Metallurgy Engineering Bor, Bor : Mining and Metallurgy Institute Bor (2015). https://doi.org/10.5937/MMEB1503053L
-
Uticaj geološke neizvesnosti u razvoju rudarskih projekata
Rudarstvo je industrija koja se nosi sa različitim vrstama neizvesnosti i rizika zbog svoje prirode i specifičnosti. Neizvesnost u rudarstvu može poticati iz različitih izvora i uticati na različite aspekte rudarskih projekata. Kao jedan od dominantnih faktora, ističe se geološka neizvesnost. Geološka neizvesnost igra ključnu ulogu u rudarstvu i može značajno uticati na procenu resursa i rezervi, planiranje eksploatacije, ekonomsku isplativost i upravljanje rizicima. Ova neizvesnost se ne može eliminisati, ali se uz primenu adekvatnih standarda i zakona može ...... (2018). Advances in Applied Strategic Mine Planning. Springer International Publishing. [6] Dimitrakopoulos, R., Farrelly, C. T., and Cheuiche Godoy, M. (2002). Moving forward from traditional optimization: Grade uncertainty and risk effects in open-pit design. Transactions of the Institution ...
... 445-464. [9] G. Lagos et al. (2011). Robust planning for an open-pit mining problem under ore-grade uncertainty. Electronic Notes in Discrete Mathematics , 31, 15-20. [10] Goodfellow R., Dimitrakopoulos R. (2016). Global optimization of open pit mining complexes with uncertainty. Applied Soft Computing ...
... posledično i za rudarsku praksu, posebno bitno, uskladiti važeće zakone sa pravilnicima. 91 Literatura [1] Armstrong M. et al. (2021). Adaptive open-pit mining planning under geological uncertainty. Resources Policy , 72. [2] (2012). Australasian Code for Reporting of Exploration Results, Mineral ...Petar Marković, Dejan Stevanović, Mirjana Banković. "Uticaj geološke neizvesnosti u razvoju rudarskih projekata" in XI Međunarodna konferencija "Ugalj i kritični minerali 2023", CCM 2023, Zlatibor, 11-14. oktobar 2023., Beograd : Jugoslovenski komitet za površinsku eksploataciju (2023)
-
Towards a Mining Equipment Ontology
... including relations of a semantic nature between terms. The simplest semantic relations are those between general and specific terms, such as coal mine, and open pit, as a specific type of coal mines. Such semantic relations result in hierarchies among terms, represented by a hierarchical tree. Terminological ...
... specific equipment (excavation machinery, conveying and auxiliary machinery, pumps etc.). Data on exploitation areas, open pit or work bench are modeled by the class Područje. The open pit, that is, the area where the equipment is operating is modeled by the class OpremaUPodrucju. Values of predefined ...
... Stanković, R., Vuković, F., Obradović, I.: An Approach to Management Decision Support: The Coal Mine Pljevlja Management Information System. In: Proceedings of the Fifteenth International Symposium on Mine Planning and Equipment Selection, Torino, Italy, Vol. 1, pp. 436-441, 2006. [6] Liadey D. M.: ...Ranka Stanković, Ivan Obradović, Olivera Kitanović, Ljiljana Kolonja. "Towards a Mining Equipment Ontology" in Proceedings of the 12th International Conference Research and Development in Mechanical Industry, RaDMI 2012, September 2012, Vrnjačka Banja, Serbia no. 1, Vrnjačka Banja, Serbia : SaTCIP (Scientific and Technical Center for Intellectual Property) Ltd. (2012)
-
Multi-Criteria Fuzzy-Stochastic Diffusion Model of Groundwater Control System Selection
When considering data and parameters in hydrogeology, there are often questions of uncertainty, vagueness, and imprecision in terms of the quantity of spatial distribution. To overcome such problems, certain data may be subjectively expressed in the form of expert judgment, whereby a heuristic approach and the use of fuzzy logic are required. In this way, decision-making criteria relating to an optimal groundwater control system do not always have a numerical value. Groundwater control scenarios (alternatives) are identified through hydrodynamic ...expert judgment, linguistic variables, fuzzy dynamic TOPSIS, hydrogeology, groundwater control system, open-cast mine, geometric Brownian motionDušan Polomčić, Zoran Gligorić, Dragoljub Bajić, Miloš Gligorić, Milanka Negovanović. "Multi-Criteria Fuzzy-Stochastic Diffusion Model of Groundwater Control System Selection" in Symmetry, MDPI AG (2019). https://doi.org/10.3390/sym11050705
-
Application of VIКOR method in the selection of an optimal splution of excavation “Borska Reka” ore deposit
Sanja Bajić, Dragoljub Bajić, Branko Glušćević, Radmila Gaćina. "Application of VIКOR method in the selection of an optimal splution of excavation “Borska Reka” ore deposit" in 9th International Conference Mining and Environmental protection MEP, 24 – 27 May 2023, Sokobanja, Serbia , Belgrade : University of Belgrade-Faculty of mining and geology (2023)
-
Flyrock induced by blasting in surface mining
Milanka Negovanović, Lazar Kričak, Snežana Ignjatović, Stefan Milanović, Jovan Marković, Nikola Simić, Rade Šarac (2022)Miniranje predstavlja i dalje najefikasniji i najjeftiniji način eksploatacije velikih količina čvrstih mineralnih sirovina na površinskim kopovima. Energija eksplozije se koristi za fragmentaciju čvrste stenske mase do zahtevane granulacije. Pored pozitivnih efekata miniranja, postoje i određeni neželjeni efekti svakog procesa miniranja koji se mogu javiti, a to su: potresi tla, razletanje komada stene, vazdušni udari, otrovni i zagušljivi gasovi i prašina. Razletanje komada stene je nekontrolisano izbacivanje fragmenata odminirane stenske mase i predstavlja jedan od glavnih izvora materijalne štete ...Milanka Negovanović, Lazar Kričak, Snežana Ignjatović, Stefan Milanović, Jovan Marković, Nikola Simić, Rade Šarac. "Flyrock induced by blasting in surface mining" in Rudarski glasnik, Beograd : Rudarski institut (2022). https://doi.org/10.25075/BM.2022.05