Ventilation Planning and Design of the Omerler B Mine
Lilić Nikola, Čokorilo Vojin, Cvjetić Aleksandar, Milisavljević Vladimir. "Ventilation Planning and Design of the Omerler B Mine" in Podzemni radovi no. 21, Beograd:Rudarsko-geološki fakultet (2012): 33-42 M52
-
Simulation Model – Support to Investment Decision-Making in the Coal Industry
Gligorić Zoran, Beljić Čedomir, Čokorilo Vojin, Dragosavljević Zlatko. "Simulation Model – Support to Investment Decision-Making in the Coal Industry" in Thermal Science 14 no. 4, Beograd:Society of Thermal Engineers of Serbia (2010): 835-844 M22
-
Application of unconventional methods of underground premises construction in coal mines
Vidanović Nebojša, Ognjanović Saša, Ilinčić Nebojša, Ilić Nebojša, Tokalić Rade. "Application of unconventional methods of underground premises construction in coal mines" in Technics Technologies Education Management / TTEM 6 no. 4, Sarajevo, Bosnia & Herzegovina:DRUNPP, Sarajevo (2011): 861-865 M23
-
Justification of coal exploitation from the “Cerje-Jovačko polje” deposit
Vidanović Nebojša, Tokalić Rade, Mitić Saša. "Justification of coal exploitation from the “Cerje-Jovačko polje” deposit" in Underground Mining Engineering no. 21, Belgrade, Serbia:University of Belgrade, Faculty of Mining and Geology (2012): 89-95 M51
-
The Character of the Corelation Between Drilling speed and Changes of the Opserved Technical Parameters in Various Working Environments
Savic Lj, Janković R, Vidanović Nebojša, Lutovac Suzana. "The Character of the Corelation Between Drilling speed and Changes of the Opserved Technical Parameters in Various Working Environments" in Technics Technologies Education Management / TTEM 6 no. 4 (2011): 392-402 M23
-
Polimerne smole sa efektom pene i njihova primena u rudarstvu
Trifunović Prvoslav, Tokalić Rade, Vidanović Nebojša, D. Marković. "Polimerne smole sa efektom pene i njihova primena u rudarstvu" in Mining and Metallurgy Engineering no. 3, Bor:Institut za rudarstvo i metalurgiju Bor (2015): 157-163 M24
-
Criteria for CO2 storage in geological formations
Tomić Lola, Karović-Maričić Vesna, Danilović Dušan, Crnogorac Miroslav. "Criteria for CO2 storage in geological formations" in Podzemni radovi no. 32, Beograd:Univerzitet u Beogradu, Rudarsko-geološki fakultet (2018): 61-74 M51
-
A model for estimation of stress-dependent deformation modulus of rock mass
Slavko Torbica, Veljko Lapčević (2019)Slavko Torbica, Veljko Lapčević. "A model for estimation of stress-dependent deformation modulus of rock mass" in International Journal of Mining and Geo-Engineering (2019). https://doi.org/10.22059/IJMGE.2018.255295.594729 М53
-
Analiza delovanja vazdušnih udara nastalih kao posledica miniranja na krečnjaku
Suzana Lutovac, Miloš Gligorić, Jelena Majstorović. "Analiza delovanja vazdušnih udara nastalih kao posledica miniranja na krečnjaku" in XVI međunarodna rudarska konferencija OMC 2024, Jugoslovenski komitet za površinsku eksploataciju (2024) М33
-
Geohemija
Dejan Prelević (2021)Dejan Prelević. Geohemija, Beograd : Univerzitet u Beogradu, Rudarsko-geološki fakultet, 2021 Без категорије
-
The challenges for Z-generation geologists
Dejan Radivojević (2022)Nastupajuća generacija geologa suočava se sa nekim problemima koji su poznati i njihovim prethodnicima, ali takođe i sa do sada novim i nepoznatim izazovima. Činjenica da mnogi geologiju povezuju sa „prljavim“ industrijama u kojima će biti sve manje prilika za zaposlenje u vreme kada se teži čistoj vodi, zemljištu i vazduhu kao i to da je smatraju zastarelom u sadašnje vreme brzog tehnološkog razvoja dovela je do velikog pada interesovanja za studije geologije svuda u svetu. Neophodno je još ...Dejan Radivojević. "The challenges for Z-generation geologists" in Tehnika, Beograd : Savez inženjera i tehničara Srbije (2022). https://doi.org/10.5937/tehnika2201037R М52
-
A decision support system for mine project selection under uncertainty using fuzzy topsis technique
Gligorić Zoran, Beljić Čedomir, Gluščević Branko, Jovanović Saša. "A decision support system for mine project selection under uncertainty using fuzzy topsis technique" in Proceedings of the 23rd International Mining Congress of Turkey, Antalya,Turkey:Chamber of Mining Engineers of Turkey (2013): 1471-1482 M33
-
Recycling of coal ashes from Serbian Nicola Tesla Power Plant
Marinković Slobodanka, Trifunović Prvoslav, Tokalić Rade, A. Kostić-Pulek. "Recycling of coal ashes from Serbian Nicola Tesla Power Plant" in The 43rd International October Conference on Mining and Metallurgy, Bor:Technical faculty in Bor University of Belgrade (2011): 55-58 M63
-
Apriori accuracy evaluation for the crosscut in a horizontal plane between the VI horizon and the P2SD adit of the Blagodat
Stoiljković Vladimir, Milutinović Aleksandar, Ganić Aleksandar, Mikanović Radenko. "Apriori accuracy evaluation for the crosscut in a horizontal plane between the VI horizon and the P2SD adit of the Blagodat" in Časopis Underground Mining Engineering/Podzemni radovi no. 23, Beograd:Rudarsko-geološki fakultet, Beograd (2013): 33-44 M51
-
Fuzzy Model for Selection of Underground Mine Development System in a Bauxite Deposit
Jovanović Saša, Gligorić Zoran, Beljić Čedomir, Gluščević Branko, Cvijović Čedomir. "Fuzzy Model for Selection of Underground Mine Development System in a Bauxite Deposit" in Arabian Journal for Science and Engineering (AJSE) 6 no. 39, :Springer Publishing (2014): 4529-4539. https://doi.org/AJSE-D-13-00220R3 M23
-
The rational technology model selection of the underground drivage development for the given conditions
Tokalić Rade, Vidanović Nebojša, Savić Ljubinko. "The rational technology model selection of the underground drivage development for the given conditions" in Underground Mining Engineering no. 23, Belgrade, Serbia:University of Belgrade, Faculty of Mining and Geology (2013): 11-20 M51
-
Formiranje jalovišta “Pekina glavica” za deponovanje filtrirane flotacijske jalovine
Torbica Slavko, Knežević Динко, Hadži-Niković Gordana. "Formiranje jalovišta “Pekina glavica” za deponovanje filtrirane flotacijske jalovine" in Tehnika -Rudarstvo, geologija i metalurgija 64 no. 1, Beograd, Srbija:Savez inženjera i tehničara Srbije, Beograd (2013): 39-45 M52
-
Uticaj načina pripreme hidromešavine na karakteristike deponovanog pepela iz termoelektrane Gacko
Beatović Sreten, Knežević Dinko, Stojanović Lazar, Torbica Slavko, Sekulić Živko. "Uticaj načina pripreme hidromešavine na karakteristike deponovanog pepela iz termoelektrane Gacko" in Tehnika -Rudarstvo, geologija i metalurgija 65 no. 3, Beograd, Srbija:Savez inženjera i tehničara Srbije, Beograd (2014): 401-408 M52
-
Calculation method as the source of errors in connecting and orienting underground mining rooms
Ganić Aleksandar, Milutinović Aleksandar, Miljanović Igor, Gojković Zoran. "Calculation method as the source of errors in connecting and orienting underground mining rooms" in Časopis Podzemni radovi 1 no. 32, Beograd:Univerzitet u Beogradu, Rudarsko-geološki fakultet (2018): 47-59 M51
-
Mathematics as a tool for solving problems in the exploitation of mineral deposits
Sanja Bajić, Dragoljub Bajić, Branko Gluščević . "Mathematics as a tool for solving problems in the exploitation of mineral deposits" in Book of abstracts of the XVIII Serbian Geological Congress, Belgrade : Serbian Geological Society (2022) М64