Претрага
471 items
-
Decision making process in the selection recultivation open pit mine and landfils
Димитријевић Бојан, Чебашек Владимир, Илић Саша, Мајсторовић Јелена, Јанковић Иван. "Decision making process in the selection recultivation open pit mine and landfils" in Proceedings of the VI International symposium on mining and environmental protection, Vrdnik, Serbia:University of Belgrade, Faculty of mining and geology, Belgrade Center for Environmental engneering, Mining Department, Belgrade, Serbia (2017): 211-213
-
Calculation for the system of wells for protecting the open pit lignite mine Radljevo North from groung waters
Поломчић Душан, Шубарановић Томислав, Димитријевић Бојан, Петковић Владимир. "Calculation for the system of wells for protecting the open pit lignite mine Radljevo North from groung waters" in Proceedings of the XIV International conference of the open and underwater mining of minerals, Varna, Bulgaria:Scientific and technical union of mining, geology and metallurgy Bulgaria (2017): 355-360
-
The correlation of the cutting resistance (kl) and selected geomechanical parameters of work environment in the example of an open pit mine ‘’Gracanica’’ Gacko
Majstorović Jelena, Dimitrijević Bojan, Savić Dragana, Nikolić D.. "The correlation of the cutting resistance (kl) and selected geomechanical parameters of work environment in the example of an open pit mine ‘’Gracanica’’ Gacko" in Proceedings of the XII-th National conference with international participation of the open and underwater mining of minerals no. XII, Varna, Bulgaria:Scientific and Technical Union of Mining, Geology and Metallurgy (2013): 255-262
-
Komparativna analiza završnih kontura površinskog kopa Drmno
Definisanje optimalne završne konture površinskog kopa od suštinskog je značaja za ostvarivanje strateških ciljeva u razvoju rudarskih projekata. Savremeni programski paketi i metode za optimizaciju granica kopa, zasnivaju se na pronalasku završne konture koja obezbeđuje maksimalan profit. U slučaju površinskih kopova uglja, kod kojih osim profita postoji i čitav niz dodatnih kriterijuma i strateških ciljeva, princip optimizacije granica prema profitu, najčešće nije u potpunosti primenjiv. Iz rog razloga za uspešno definisanje granica površinskih kopova, neophodno je sagledati čitavu lepezu ...Dejan Stevanović, Dragan Ignjatović, Tomislav Šubaranović, Mirjana Banković, Petar Marković. "Komparativna analiza završnih kontura površinskog kopa Drmno" in XV Međunarodna konferencija OMC 2022, Zlatibor, 12-15. oktobar 2022., Jugoslovenski komitet za površinsku eksploataciju (2022)
-
Избор рекултивационог решења површинског копа Кленовник вишеатрибутном анализом: моделски приступ код избора; А selection of the land reclamation resolution of the open pit mine Klenovnik by a multi-attribute analysis: modeling approach in selection,
Вујић Слободан, Димитријевић Бојан, Николић Јовица, Милошевић Драган, Макар Ненад, Марјанац Симеон (2013)Вујић Слободан, Димитријевић Бојан, Николић Јовица, Милошевић Драган, Макар Ненад, Марјанац Симеон. "Избор рекултивационог решења површинског копа Кленовник вишеатрибутном анализом: моделски приступ код избора; А selection of the land reclamation resolution of the open pit mine Klenovnik by a multi-attribute analysis: modeling approach in selection," in Зборник радова XL Симпозијум о операционим истраживањима СYМОПИС 2013 no. XL, Златибор, Србија :Универзитет у Београду, Факултет организационих наука, Београд. (2013): 745-747
-
Parameter determination of soil oscillation law using quotient of the relative growth increments of oscillation velocity and reduced distances at “Nepričava“ open pit mine
... functional correlation is accepted as a good one. 4. REVIEW OF MASSIVE BLASTING AT "NEPRIČAVA" OPEN PIT MINE NEAR LAJKOVAC 4.1. General characteristics of "Nepričava" Open Pit Mine The limestone deposit "Nepričava" is situated at a distance of about 7.0 km west of town of Lajkovac ...
... determination of soil oscillation law using quotient of the relative growth increments of oscillation velocity and reduced distances at “Nepričava“ open pit mine;Određivanje parametara zakona oscilovanja tla preko količnika relativnih priraštaja brzina oscilovanja i redukovanih rastojanja na P.K. 'Nepričava' ...
... determination of soil oscillation law using quotient of the relative growth increments of oscillation velocity and reduced distances at “Nepričava“ open pit mine;Određivanje parametara zakona oscilovanja tla preko količnika relativnih priraštaja brzina oscilovanja i redukovanih rastojanja na P.K. 'Nepričava' ...Suzana Lutovac, Sanja Bajić, Marina Ravilić, Radmila Gaćina. "Parameter determination of soil oscillation law using quotient of the relative growth increments of oscillation velocity and reduced distances at “Nepričava“ open pit mine" in Underground Mining Engineering, Belgrade : University of Belgrade, Faculty of Mining and Geology (2015). https://doi.org/10.5937/podrad1526009L
-
Optimizacija faznog razvoja Površinskog kopa Ciganuša – Škorac u cilju definisanja dugoročne dinamike eksploatcije
Definisanje dugoročne dinamike razvoja rudarskih radova koja je u potpunosti usaglašena sa strateškim ciljevima Investitora, veoma je zahtevan zadatak, koji vrlo često podrazumeva veliki broj ograničenja. Adekvatno definisana dinamika razvoja rudarskih radova treba da obezbedi dugoročne zahteve u pogledu kapaciteta, kvaliteta i raspodele resursa neophodnih za ispunjavanje strateških ciljeva, koji se po pravilu svode na ostvarenje maksimalnog profita. Uspešno definisanje dinamike eksploatacije (posebno kod metaličnih ležišta) u najvećoj meri zavisi od optimizacije faznog razvoja površinskog kopa, odnosno od pravilnog ...Dejan Stevanović, Petar Marković, Mirjana Banković, Milan Živković. "Optimizacija faznog razvoja Površinskog kopa Ciganuša – Škorac u cilju definisanja dugoročne dinamike eksploatcije" in XV Međunarodna konferencija OMC 2022, Zlatibor, 12-15. oktobar 2022., Jugoslovenski komitet za površinsku eksploataciju (2022)
-
Coal homogenization stockyard sizing “Tamnava – Zapad” case study
... Process at Open-Pit Stockyards: A Northern Kazakhstan Mining Company Case Study. In Mine Planning and Equipment Selection (pp. 1017-1027). Springer International Publishing. 8. Stevanović D., Kolonja B., Stanković R., Knežević D., Jovanović M., “Application of stochastic models for mine planning ...
... blending coals of various qualities produces the quality the customer demands. However, when the stockyard is connected with a mine (pit), it is used for homogenization of run-of-mine coal or other ore or material. In order to restrict the time necessary for homogenization activities, stockyards are divided ...
... for the homogenization process to be carried out. It then follows that for the contractually specified range, in deciding on the level of the pit (mine), for safety reasons that range should be decreased, particularly considering the level of data confidence and exploration of the deposit. This ...Božo Kolonja, Dinko Knežević, Ranka Stanković, Dejan Stevanović, Detlef Trummer. "Coal homogenization stockyard sizing “Tamnava – Zapad” case study" in Proceedings of 13th International Symposium Continuous Surface Mining, ISCSM 2016, / (2016)
-
Influence of GPS telemetry on increasing the energetic efficiency and decreasing technical technological risks at open pit mines
Vujić Slobodan, Miljanović Igor, Milutinović Aleksandar, Gajić Grozdana, Petrovski Aleksandar, Josipović Pejović Milena (2011)Vujić Slobodan, Miljanović Igor, Milutinović Aleksandar, Gajić Grozdana, Petrovski Aleksandar, Josipović Pejović Milena. "Influence of GPS telemetry on increasing the energetic efficiency and decreasing technical technological risks at open pit mines" in Proceedings of the 4th Balkan Mining Congress BALKANMINE 2011, 18-20.10.2011 - no. -, Ljubljana, Slovenia:Velenje Coal Mine, Slovenia, University of Ljubljana, Faculty of Natural Sciences and Engineering (2011): 273-276. https://doi.org/-
-
A hydrogeological model of the open-cast mine Tamnava - West Field (Kolubara Coal Basin, Serbia)
... managing dewatering in an open pit mine. In: MCCULLOUGH, C.D., LUND, M.A., and WYSE, L. (eds.) Proceedings of the International Mine Water Association Symposium. Bunbury, Australia, 2012. Bunbury: IMWA, pp. 557-567. BUHAČ, D. et al. (2012) Designe solution of open pit „South Field” dewatering from ...
... geology. Herceg Novi, Montenegro, 2002. Herceg Novi: pp 389-396. A hydrogeological model of the open-cast mine… 53 POLOMČIĆ, D. and BAJIĆ, D. (2011). 3D Hydrodinamic model of open pit mine “Polje E” (Kolubara coal basin). In: PAVLOVIĆ, V. (ed.) Proceedings of the V International Conference ...
... lignite field, West Macedonia, Greece. In: Proceedings of the 7th International Mine Water Association Congress. Ustron, Poland, 2000. Ustron: IMWA, pp. 519-529. ĐINĐIĆ, I. et al. (2016) The impact of dewatering of open pit mine „Tamnava“ on groundwater regime of groundwater source „Kalenić“. In: VRANJEŠ ...Jelena Ratković, Dušan Polomčić, Dragoljub Bajić, Bojan Hajdin. "A hydrogeological model of the open-cast mine Tamnava - West Field (Kolubara Coal Basin, Serbia)" in Underground Mining Engineering no. 29, Belgrade : University of Belgrade - Faculty of mining and geology (2016): 43-54
-
Application of the Fuzzy Model in the Evaluation and Selection of Hydraulic Excavators on Open-Pit Lignite Mine
Stevan Đenadić, Miloš Tanasijević, Vladimir Milisavljević, Dragan Ignjatović, Predrag Jovančić (2021)The production of lignite in large open-pit mines is mainly performed with continuously operating equipment, where bucket-wheel excavators, bucket-chain excavators, belt conveyors, and spreaders are the basic machines. Smaller machines, usually of discontinuous operating nature, are commonly categorized as auxiliary machines. This paper presents the research related to the analysis of auxiliary machine parameters with the case study for a hydraulic excavator. The purpose of the analysis was to develop a model of rating quality of service of the ...Stevan Đenadić, Miloš Tanasijević, Vladimir Milisavljević, Dragan Ignjatović, Predrag Jovančić. "Application of the Fuzzy Model in the Evaluation and Selection of Hydraulic Excavators on Open-Pit Lignite Mine" in SSRN Electronic Journal, Elsevier BV (2021). https://doi.org/10.2139/ssrn.3945617
-
Evaluation And Perspectives Of Underground Coal Mines In Serbia
... operation (Soko, Strmosten pit in REMBAS mine, Lubnica and Štavalj) and for closure of those mines without potential (Tadenje and Jarando pits of Ibarski mines, Senjski rudnik pit of REMBAS, Bogovina and Vrška Čuka). This approach leaves Jasenovac mine and Block IV pit of REMBAS mine in between these ...
... ranking, while the Jarando pit of Ibarski mines has the worst ranking. This result is mainly because Soko has significant coal reserves, stable market and potential for improvement (mechanization and investment), while these criteria are completely opposite in case of Jarando pit in Ibarski mines. However ...
... non-producing mine whose workers are hired as contractors in other mines. These mines are dispersed throughout Serbia, and they are producing various types of coal, as given in Table 1. Table 1. Mines, location, type of coal produced and number of workers (as of March, 2017) Mine Town / Municipality ...Vladimir Milisavljević, Milena Lekić, Ivica Ristović, Vojin Čokorilo, Aleksandar Cvjetić. "Evaluation And Perspectives Of Underground Coal Mines In Serbia" in 7th Balkan Mining Congress Preceedings - BalkanMine2017, Prijedor, 11-13. oktobar 2017., Banjaluka : University of Banjalika, Faculty of Mining, RS, BiH (2017)
-
Razvoj ARCGIS geobaze površinskog kopa korišćenjem UML CASE alata
... by the example of the "Field G" open pit, followed by an outline of the way spatial-temporal data are handled, as well as by an example of visualization of spatial classes in ArcMap. Keywords: geographic information system, GIS, geodatabase, UML, ArcGIS, open pit INTRODUCTION The growing complexity ...
... originating from the pre-project and feasibility study for opening and developing the “Field G” open pit (Idejni projekat sa studijom opravdanosti otvaranja i izgradnje površinskog kopa “Polje G”). Open pit "Field G" is currently not in function. Its opening, preliminary scheduled for 2015, will provide ...
... Faculty of Mining and Geology archives faculty publications available in open access, as well as the employees' publications. - The Repository is available at: www.dr.rgf.bg.ac.rs 1 USING UML CASE TOOLS FOR DEVELOPMENT OF AN OPEN PIT ARCGIS GEODATABASE Aleksandra Tomašević, Ljiljana Kolonja, Ivan ...Aleksandra Tomašević, Ljiljana Kolonja, Ivan Obradović, Ranka Stanković, Olivera Kitanović. "Razvoj ARCGIS geobaze površinskog kopa korišćenjem UML CASE alata" in Podzemni radovi, Beograd : Univerzitet u Beogradu - Rudarsko-geološki fakultet (2012)
-
Geomechnical research for the new bucket wheel excavator testing at Open pit “Filijala”
Since 1976 cement marl excavation at open-pit mine „Filijala” is carried out by continuous exploitation technology using bucket wheel excavator SH 400 manufactured by Orenstein und Koppel (O & K) company. Due to the bucket wheel excavator time-worn and high operating cost it was necessary to replace it with new one. In order to test the new bucket wheel excavator and prove its capacity a testing zone was defined as test block for excavation, in which the bucket wheel ...Vladimir Čebašek, Nebojša Gojković, Veljko Rupar, Miodrag Pribićević. "Geomechnical research for the new bucket wheel excavator testing at Open pit “Filijala”" in Рударски гласник, Рударски институт - Београд (2020). https://doi.org/10.25075/BM.2020.07
-
BEYOND 2020 - Geology explorations and open pit activities affectation in reclamation designing in Kolubara Coal Mines (KCM) Serbia, new considerations
Geology explorations in KCM runs from 1936. year up to these days and still ongoing. Results in >7,200 drill holes with ≈600,000 m of core drilling and gave lignite ore resources of > 4,1Bt, which 1,15Bt are excavated since 1986. of XIX up to early years of XXI century. For further mining operations in open pits stay 1,5Bt of lignite. Under waste heaps are ≈80 km2, additional 85 km2 should be filled. All of that masses/areas were, are ...Bojan Dimitrijević, Bogoljub Vučković, Radmila Gaćina. "BEYOND 2020 - Geology explorations and open pit activities affectation in reclamation designing in Kolubara Coal Mines (KCM) Serbia, new considerations" in 17th International Conference of the open and underwater mining of minerals, Sts. Constantine and Helena Resort, Varna, 18-22 September, Bulgaria, Sofia, Bulgaria : Scientific and Technical Union of Mining, Geology and Metallurgy, (2023)
-
Analysis of the exhaust emissions inventory from auxiliary mining machines
Stevan Đenadić, Aleksandar Mirković, Jovana Mitrović, Filip Miletić, Predrag Jovančić, Dragan Ignjatović (2023)Open-pit coal mines are equipped with a large number of mining machines and vehicles with diesel engines. Due to common daily operation of these machines and vehicles large amounts of exhaust gases which contain numerous pollutants are emitted into the atmosphere. The demand to reduce air pollution induced the activities in developed countries to map and calculate all gases emitted by industries to formulate and select adequate preventive activities. In collaboration with machine manufacturers, emission standards for off-road machines ...Stevan Đenadić, Aleksandar Mirković, Jovana Mitrović, Filip Miletić, Predrag Jovančić, Dragan Ignjatović. "Analysis of the exhaust emissions inventory from auxiliary mining machines" in 9th International Conference Mining and Environmental Protection, University of Belgrade, Faculty of Mining and Geology (2023)
-
Ograničenja primene optimizacionih algoritama u slučaju kopova
Proces optimizacije površinskih kopova, kao sastavni deo strateškog planiranja, veoma je važan sa stanovišta ostvarivanja maksimalnih efekata proizvodnje. To je složen zadatak koji vrlo često podleže vrlo strogim geometrijskim i drugim praktičnim rudarskim ograničenjima. Ova ograničenja u posebno su izražena na površinskim kopovima uglja, te u značajnoj meri mogu povećati stepen neizvesnosti rudarskog projekta, odnosno izazvati neželjena dejstva u pogledu profitabilnosti poslovanja. Iz tog razloga, veoma je važna primena savremenih optimizacionih alata, koji u značajnoj meri mogu olakšati celokupan ...... presents issues related to the process of optimization of open pit coal mines using modern optimization algorithms, as well as the possibility of finding optimal solutions within a set of constraints. Ključne reči: Optimization, open pit coal mine, constraints, profitability 1. Uvod Nesumnjivo Je ...
... okviru određenog skupa ograničenja. Ključne reči: Optimizacija, površinski kop uglja, ograničenja, profitabilnost Abstract The process of open pit mine optimization, as an integral part of strategic planning, is very important from the point of view of achieving maximum economic efficiency of ...
... 2023-10-17 11:47:14 Ograničenja primene optimizacionih algoritama u slučaju kopova ;Application constraines of optimization algorithms in the case of open pit coal mines Dejan Stevanović, Mirjana Banković, Milica Pešić Georgiadis, Petar Marković, Dejan Ranković Дигитални репозиторијум Рударско-геолошког ...Dejan Stevanović, Mirjana Banković, Milica Pešić Georgiadis, Petar Marković, Dejan Ranković. "Ograničenja primene optimizacionih algoritama u slučaju kopova" in XIV Međunarodna konferencija OMC 2020, Zlatibor, Srbija, 14-17. oktobar 2020., Beograd : Jugoslovenski komitet za površinsku eksploataciju (2020)
-
A Model for Determining Fuzzy Evaluations of Partial Indicators of Availability for High-Capacity Continuous Systems at Coal Open Pits Using a Neuro-Fuzzy Inference System
This paper presents a model for determining fuzzy evaluations of partial indicators of the availability of continuous systems at coal open pits using a neuro-fuzzy inference system. The system itself is a combination of fuzzy logic and artificial neural networks. The system availability is divided into partial indicators. By combining the fuzzy logic and artificial neural networks, a model is obtained that has the ability to learn and uses expert judgment for that learning. This paper deals with the ...системи, континуални системи експлоатације (роторни багер-транспортер-дробилично постројење), рударство, расположивост, меко рачунарство, фази логика, ANN, ANFISMiljan Gomilanović, Miloš Tanasijević, Saša Stepanović, Filip Miletić. "A Model for Determining Fuzzy Evaluations of Partial Indicators of Availability for High-Capacity Continuous Systems at Coal Open Pits Using a Neuro-Fuzzy Inference System" in Energies, MDPI AG (2023). https://doi.org/10.3390/en16072958
-
Fragmentation Size Prediction of Blasted Material Using a Specialized Software for Drilling and Blasting
Stefan Milanović, Nikola Simić, Lazar Kričak, Milanka Negovanović, Nikola Đokić, Miljan Gomilanović (2024)Design and optimizing the drilling and blasting parameters, should fill the requirements for the capacity, fragmentation size, and technical characteristics of loading and transport equipment, and enable a safe work at the open pit. Besides mentioned, it also achieves the minimal impact on the environment of the open pit and decreases the negative effects on the environment, especially in the blast vibration and flyrock. To obtain the best possible blasting effects and consider all the factors, a specialized software is ...Stefan Milanović, Nikola Simić, Lazar Kričak, Milanka Negovanović, Nikola Đokić, Miljan Gomilanović. "Fragmentation Size Prediction of Blasted Material Using a Specialized Software for Drilling and Blasting" in The 55th International October Conference on Mining and Metallurgy, Mining and Metallurgy Institute Bor (2024). https://doi.org/10.5937/IOC24077M
-
Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine
Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović (2019)Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availability is an overall indicator and contains partial indicators that are oriented towards reliability, maintenance, and logistical support. Availability presents a variable value and changes in time and space. Usually, availability is shown as the ...... and spreaders) has been demonstrated. In case of low availability, the open-pit mine must have a larger number of units or there will not be enough machines for operation. In the structure and extent of auxiliary works in open-pit mines, the most commonly used earthworks are those which are performed ...
... publications available in open access, as well as the employees' publications. - The Repository is available at: www.dr.rgf.bg.ac.rs energies Article Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine Stevan Djenadic 1 ...
... Измењено: 2023-10-14 04:29:43 Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović Дигитални репозиторијум Руд ...Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović. "Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine" in Energies, MDPI AG (2019). https://doi.org/10.3390/en12214044