Претрага
45 items
-
Composition of organic matter and thermal maturity of Mesozoic and Cenozoic sedimentary rocks in East Herzegovina (External Dinarides, Bosnia and Herzegovina)
This paper presents the first data on the organic matter and thermal maturity of Mesozoic and Cenozoic sedimentary rocks in the East Herzegovina region of the External Dinarides. Representative, organic-rich samples from outcropping sedimentary rocks of different ages in the area (Triassic to Neogene) were selected and analysed. The organic matter was studied by Rock-Eval pyrolysis and under the microscope in reflected non-polarized light and incident blue light. The results obtained show the presence of different types of organic ...... history of sedi- mentary basins, maturation indices, and kinetics of oil and gas generation. AAPG Bulletin, 71: 1445–1466. Tissot, B. P. & Welte, D. H., 1978. Petroleum Formation and Occurrence: A New Approach to Oil and Gas Exploration. Springer-Verlag, Berlin, 538 pp. Van Gijzel, P., 1981. Char ...
... history of sedi- mentary basins, maturation indices, and kinetics of oil and gas generation. AAPG Bulletin, 71: 1445-1466. Tissot, B. PR & Welte, D. H., 1978. Petroleum Formation and Occurrence: A New Approach to Oil and Gas Exploration. Springer-Verlag, Berlin, 538 pp. Van Gijzel, P., 1981. Charac ...
... n risk in the area, in terms of the petroleum sys- tem, is uncertainty about the existence of e�cient seals. �ere has been no drilling for oil and gas so far, but there is a well-known bitumen seep east of Ljubinje (Mišljen, Fig. 1C – on the le� border) in the Cretaceous limestone. �e Mišljen ...Nikoleta Aleksić, Aleksandar Kostić, Miloš Radonjić. "Composition of organic matter and thermal maturity of Mesozoic and Cenozoic sedimentary rocks in East Herzegovina (External Dinarides, Bosnia and Herzegovina)" in Annales Societatis Geologorum Poloniae (2021). https://doi.org/10.14241/asgp.2021.16
-
A survey of greenhouse gases production in central European lignites
Anna Pytlak, Anna Szafranek-Nakonieczna, Weronika Goraj, Izabela Śnieżyńska, Aleksandra Krążała, Artur Banach, Ivica Ristović, Mirosław Słowakiewicz, Zofia Stępniewska (2021)... lignite remains largely unrecognized. Both the guidelines for national greenhouse gas inventories (Eggleston et al., 2006) and the recently updated version in- dicate that “surface mines may continue to emit methane as the gas leaks from the coal seams thatwere broken or damaged duringmining” but “there ...
... septa and aluminium cap to allow for headspace gas sampling. Measurements were conducted at 30 °C. Triplicate samples were prepared for each treatment. The concentrations of gases (CH4, CO2) during the experiment were determined using a Varian 3800 gas chromatograph equipped with flame ionization (FID ...
... was set to 120 °C and oven temperature was set to 40 °C. Helium was used as the carrier gas. Methane and carbon dioxide production rate was determined based on the linear increase in the concentration of a given gas in time and expressed as a nmol per gram dry mass per day (nmol g-1 day-1). 2.6. Global ...Anna Pytlak, Anna Szafranek-Nakonieczna, Weronika Goraj, Izabela Śnieżyńska, Aleksandra Krążała, Artur Banach, Ivica Ristović, Mirosław Słowakiewicz, Zofia Stępniewska. "A survey of greenhouse gases production in central European lignites" in Science of The Total Environment, Elsevier (2021). https://doi.org/10.1016/j.scitotenv.2021.149551
-
Утечњени природни гас (УПГ) – технологија производње и регасификације
Јована Милетић (2024)У овом раду истраживање је обухватило сагледавање карактеристика утечњеног природног гаса као извора енергије и његове улоге у савременој расподели потрошње енергије на глобалном и европском нивоу. Проучени су елементи тржишта утечњеног природног гаса, сектори коришћења, транс-портне руте и количине испорука. Сагледан је пут природног гаса од лежишта до корисника преко утечњавања и транспорта у резервоарима, са посебним акцентом на технологијама производње и регасификације. Објашњено је пречишћавање сировог природног гаса ради уласка у процес утечњавања, процеси утешњавања и настојања ...утечњени природни гас, технологија производње и рега- сификације, транспорт, директно коришћење УПГ-а, могућност коришћења УПГ-а у Србији... evaluation of trimethylene glycol regeneration process using flash gas as stripping gas in a domestic natural gas dehydration unit. DOI: 10.1002/eng2.12153 Aleksić, A. (2024). Tečni prirodni gas (LNG). Alhajji, A. (2023). EU Gas Imports in 2023 and Outlook for 2024. Energy Outlook Advisors. h ...
... no 27.6.2024. Arab Oil Natural Gas, AONG Website. 4mine Gas treatment. https://www.arab-oil- naturalgas.com/the-technologies-of-natural-gas-sweetening/amine-gas-treatment/ pristupljeno 20.8.2024. Argonne National Laboratory. Case Sfudy – Liquified Natural Gas. SAD, Lemont. Buades, L.S. (2017) ...
... 2024. Mokhatab, S. (2019). Gas prefreatment considerations for LNG plants feeding with pipeline-quality gas. Gas processing & LNG. Canada, Nova Scotia. gasprocessingnews.com/articles/2019/02gas-pretreatment-considerations-for-Ing- plants-feeding-with-pipeline-quality-gas/ pristupljeno 20.8.2024. ...Јована Милетић. Утечњени природни гас (УПГ) – технологија производње и регасификације, 2024
-
Proračun recirkulacionih pumpi u postrojenju za odsumporavanje dimnih gasova ,,TENT B"
Tomislav Trpković (2024)Predmet ovog rada baziraće se na proračunu i usvajanju mašinskih instalacija potrebnih za nesmetano funkcionisanje sistema dve međusobno povezane celine Absorber - Pumpna stanica, preko FRP ( Fiberglass Reinforced Plastic) cevovoda kojim se odvija transport suspenzije krečnjaka neophodnog u samom procesu odsumporavanja dimnih gasova. Pored tehničkog opisa same tehnologije koja uključuje tri objekta: Absorber, Pumpna Stanica i cevovod, glavni deo rada odnosiće se na proračun i usvajanje mašinskih instalacija koji uključuju recirkulacione radijalne centrifugalne pumpe i cevovode kojima ...postrojenje za odsumporavanje dimnih gasova, termoelektrana, pumpna stanica, FRP cevovod, Absorber, transport suspenzije gipsa, prirubnica, ventil, potisni cevovod, usisni cevovod... dimnog gasa Parametri dimnog gasa na ulazu u sistem ODG prikazani su u tabeliTabela 2.1 Tabela 2.1 Parametri dimnog gasa i “ Blok BIJ Blok · Bž Opis Jedinica mere Absorber Absorber Protok dimnog gasa na ulazu u ODG (vlažno) Nm#?/h, vlažno 3.950. 3.95 044 0.04 4 Protok dimnog gasa na ulazu ...
... postrojenje. Dimni gasovi nakon izlaska iz kotla prolaze kroz regenerativni zagrejač vazduha, a potom se dimnim kanalima usmeravaju ka elektrofilterskom postrojenju i dimnjaku pomoću ventilatora dimnih gasova. Svaki blok ima instalirana po dva ventilatora dimnih gasova. Dimni gasovi iz blokova B1 ...
... suvo 3.063. 3.06 259 3.25 9 Pritisak dimnog gasa na ulazu u ODG mbar -2.90 - 2.90 Projektni pritisak postojećeg sistema dimnog gasa mabr 2.55 2.55 Temperatura dimnog gasa na ulazu u ODG oC 180 80 Projektna temperatura postojećeg sistema dimnog gasa oC 190 90 H.O vol% 22,45 22,4 5 O> vol% ...Tomislav Trpković. Proračun recirkulacionih pumpi u postrojenju za odsumporavanje dimnih gasova ,,TENT B", 2024
-
Application of Gel for Water Shutoff: A Case Study of Kelebija Oil Field
This paper focuses on the results of water shutoff operations using DSGA polymer gel in the Kelebija oil field. The methodology of candidate wells selection and the manner of performing the operation will also be included. The Kelebija oil field is characterized by a complex reservoir system with heterogeneous layers of different permeability and dual porosity, which led to the early breakthrough of water. For the last 25 years, average water cut was above 90%. Implementation of water shutoff ...intervención de pozos petroleros, reservoir characterization, production control, well logging, downhole intervention, enhanced recovery, complex reservoir, reservoir surveillance, water shut-off, upstream oil & gasIrina Zahirovic, Petar Skrobonja, Dušan Danilović. "Application of Gel for Water Shutoff: A Case Study of Kelebija Oil Field" in SPE Production & Operations, SPE (2022). https://doi.org/10.2118/209590-PA