Претрага
403 items
-
A Knowledge-Based Approach to Mine Ventilation Planning in Yugoslav Mining Practice
Ventilation system analysis is a complex process based on the calculation and analysis of numerous parameters. These problems can be successfully solved by the SimVent numerical package, but a full understanding and use of the obtained results require the involvement of an experienced specialist in the ventilation field. The solution was found in the creation of a hybrid system INVENTS, whose knowledge base represents a formalization of the expert knowledge in the mine ventilation field. In this paper, we ...... 03:36:16 A Knowledge-Based Approach to Mine Ventilation Planning in Yugoslav Mining Practice Nikola Lilić, Ivan Obradović, Ranka Stanković Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] A Knowledge-Based Approach to Mine Ventilation Planning in Yugoslav Mining ...
... faculty publications available in open access, as well as the employees' publications. - The Repository is available at: www.dr.rgf.bg.ac.rs Mineral Resources Engineering, Vol. 11, No. 4 (2002) 361–382 c© Imperial College Press A KNOWLEDGE-BASED APPROACH TO MINE VENTILATION PLANNING IN YUGOSLAV ...
... software that are at the disposition of mine engineers. Software packages for mine ventilation simulation are now playing a key role in the process of mine ventilation planning and design.7–10 In this paper, we propose a six-step approach to the solution of mine ventilation design problem, the design ...Nikola Lilić, Ivan Obradović, Ranka Stanković. "A Knowledge-Based Approach to Mine Ventilation Planning in Yugoslav Mining Practice" in Mineral Resources Engineering 11 no. 4, Imperial College Press (2002): 361-382. https://doi.org/10.1142/S0950609802001014
-
A hydrogeological model of the open-cast mine Tamnava - West Field (Kolubara Coal Basin, Serbia)
... al model of the open-cast mine Tamnava - West Field (Kolubara Coal Basin, Serbia) Jelena Ratković, Dušan Polomčić, Dragoljub Bajić, Bojan Hajdin Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] A hydrogeological model of the open-cast mine Tamnava - West Field ...
... y comprised of several open-cast mines: Field A, Field B, Field C, Field D, Field E, Field F, Field G, Veliki Crljeni, Šopić-Lazarevac, Tamnava - West Field, Tamnava – East Field, Radljevo, Zvizdar, Ruklade, and Trlić. The paper focuses on the largest active open-cast mine: Tamnava - West Field. ...
... geology. Herceg Novi, Montenegro, 2002. Herceg Novi: pp 389-396. A hydrogeological model of the open-cast mine… 53 POLOMČIĆ, D. and BAJIĆ, D. (2011). 3D Hydrodinamic model of open pit mine “Polje E” (Kolubara coal basin). In: PAVLOVIĆ, V. (ed.) Proceedings of the V International Conference ...Jelena Ratković, Dušan Polomčić, Dragoljub Bajić, Bojan Hajdin. "A hydrogeological model of the open-cast mine Tamnava - West Field (Kolubara Coal Basin, Serbia)" in Underground Mining Engineering no. 29, Belgrade : University of Belgrade - Faculty of mining and geology (2016): 43-54
-
Design of the Opencast Coal Mine Drmno Dewatering System
Development of mining in the opencast mine Drmno from Kostolac basin in Serbia is carried out in the increasingly complex geological and hydro geological conditions with the decline of the coal seams to the alluvial part of Europe's largest river Danube. Greater depth and inflow of groundwater significantly increase costs for dewatering facilities construction with the requirement for optimizing of this more and more important surface mining process. Making decision on screen construction in the opencast mine with redesign ...dewatering system, groundwater, hydrodynamic model, dewatering wells, screen, reliability, environmental effects.Vladimir Pavlović, Dušan Polomčić, Tomislav Šubaranović. "Design of the Opencast Coal Mine Drmno Dewatering System" in Proceedings of the 12th International Symposium Continuous Surface Mining - Aachen 2014, Springer International Publishing (2014). https://doi.org/10.1007/978-3-319-12301-1_11
-
A business intelligence approach to mine safety management
Ljiljana Kolonja, Ranka Stanković, Ivan Obradović, Olivera Kitanović, Dejan Stevanović, Marija Radojičić (2016)... relations established between general and more specific terms, such as "coal mine", and "open pit", which is a specific type of coal mine, as well as synonyms relations, such as those between "opencast", "surface mine", and "quarry". One approach to development of mining ontologies has been reported ...
... intelligence approach to mine safety management Ljiljana Kolonja, Ranka Stanković, Ivan Obradović, Olivera Kitanović, Dejan Stevanović, Marija Radojičić Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] A business intelligence approach to mine safety management | ...
... Belgrade Faculty of Mining and Geology archives faculty publications available in open access, as well as the employees' publications. - The Repository is available at: www.dr.rgf.bg.ac.rs A Business Intelligence Approach to Mine Safety Management Ljiljana Kolonja1, Ranka Stanković1, Ivan Obradović1, ...Ljiljana Kolonja, Ranka Stanković, Ivan Obradović, Olivera Kitanović, Dejan Stevanović, Marija Radojičić . "A business intelligence approach to mine safety management" in 13th International Symposium Continuous Surface Mining, Beograd : Yugoslav Opencast Mining Committee (2016)
-
An Approach to Management Decision Support: The Coal Mine Pljevlja Management Information System
In this paper we describe the approach that has been used in the development of the Management Information System (MIS) in the Coal Mine Pljevlja in Montenegro. The methodology of this approach was based on new information technologies and management techniques which have already been successfully applied in other related fields. Its main goal was to introduce modern management techniques to mining, adapted to specific features of the mining industry, its operations and environment, thus enabling the tactical management ...... of TIS as a starting point for the construction of an e-mine. This figure shows two open pits, but if new sites and production complexes are opened, they can also be included in the system. Figure 1. Architecture of TIS for Coal Mine Pljevlja 2.1 Human resources The human resources system ...
... Decision Support: The Coal Mine Pljevlja Management Information System Božo Kolonja, Ranka Stanković, Filip Vuković, Ivan Obradović Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] An Approach to Management Decision Support: The Coal Mine Pljevlja Management Information ...
... Faculty of Mining and Geology archives faculty publications available in open access, as well as the employees' publications. - The Repository is available at: www.dr.rgf.bg.ac.rs An Approach to Management Decision Support: The Coal Mine Pljevlja Management Information System Božo Kolonja1, Ranka Stanković1 ...Božo Kolonja, Ranka Stanković, Filip Vuković, Ivan Obradović. "An Approach to Management Decision Support: The Coal Mine Pljevlja Management Information System" in Proceedings of the Fifteenth International Symposium on Mine Planning and Equipment Selection, Torino, Italy, September 2006, Vol. 1,, Balkema (2006)
-
Rudničke vode olovo-cinkovih ležišta u rudnom polju „Blagodat“ u jugoistočnoj Srbiji
Nebojša Atanacković, Veselin Dragišić, Vladimir Živanović, Ivana Cvejić, Saša Stojadinović, Ivana Jocić (2022)Rudno polje Blagodat sa više ležišta i pojava olovo-cinkovih ruda nalazi se u krajnjem jugoistočnom delu Srbije, blizu granica sa Bugarskom i Severnom Makedonijom. Eksploatacija ovog resursa vrši se podzemno u okviru rudnika Grot, ranije Blagodat. Prilivi podzemnih (rudničkih) voda u jamske radove rudnika Grot su visoki i iznose oko 130 l/s (septembar 2019), što ga trenutno svrstava u najovodnjenije rudnike sa podzemnom eksploatacijom u Srbiji. Nezavisno od njih, iz obližnjeg potkopa P-1 u ležištu Kula, ističe još 25 ...Nebojša Atanacković, Veselin Dragišić, Vladimir Živanović, Ivana Cvejić, Saša Stojadinović, Ivana Jocić. "Rudničke vode olovo-cinkovih ležišta u rudnom polju „Blagodat“ u jugoistočnoj Srbiji" in Zbornik radova XVI srpskog Simpozijum o hidrogeologiji sa međunarodnim učešćem, Univerzitet u Beograd, Rudarsko-geološki fakultet (2022)
-
Optimisation of underground mine decline development system using genetic algorithm
... Optimisation of underground mine decline development system using genetic algorithm Zoran Gligorić, Aleksandar Ganić, Rade Tokalić, Aleksandar Milutinović Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Optimisation of underground mine decline development system ...
... Faculty of Mining and Geology archives faculty publications available in open access, as well as the employees' publications. - The Repository is available at: www.dr.rgf.bg.ac.rs Professional paper OPTIMISATION OF UNDERGROUND MINE DECLINE DEVELOPMENT SYSTEM USING GENETIC ALGORITHM UPOTREBA ...
... adequate nonlinear constrained objective function representing the cost of mine development and ore haulage. To find the minimum value of the objective function we use Genetic algorithm. Key words: underground mine, decline development, optimisation, genetic algorithm Apstrakt: Kada ...Zoran Gligorić, Aleksandar Ganić, Rade Tokalić, Aleksandar Milutinović. "Optimisation of underground mine decline development system using genetic algorithm" in Underground mining engineering, Beograd : Univerzitet u Beogradu – Rudarsko–geološki fakultet (2014)
-
Mine ventilation system planning using genetic algorithms
The most common problem in contemporary mining practice related to the planning and analysis of ventilation systems is the optimization of partially regulated air distribution in mine ventilation networks. This paper presents a two step optimization procedure for partly regulated air distribution in mine ventilation networks. The first step is the determination of air distribution in all branches using the well known Hardy-Cross method. In the second step the distribution and parameters of air flow regulators with minimum engaged ...coal, lignite, and peat; ventilation systems; coal mining; underground mining; ventilation; mathematical models; design; air flow; optimization; calculation methodsNikola Lilić, Ranka Stanković, Ivan Obradović. "Mine ventilation system planning using genetic algorithms" in 6. international symposium on mine planning and equipment selection, Ostrava (Czech Republic), 3-6 Sep 1997, A.A. Balkema, Rotterdam (Netherlands) (1997)
-
Primary crusher site selection in open pit mines - case study in Sungun copper mine
Facility site selection, (such as Primary or in pit Crusher location) is one of the most important steps in mine de-sign process that has a significant impact on economy of the mining operation. This study covers an attempt to find the optimal location forprimary crusher in order to support the expansion of Sungun copper mine, which is the second largest open pit mine in Iran. Recent exploration drilling has led to a considerable increase in the ore reserve. Therefore, ...Ali Nasirinezhad, Dejan Stevanović, Dragan Ignjatović, Mehdi Rahmanpou. "Primary crusher site selection in open pit mines - case study in Sungun copper mine" in Underground mining engineering, Универзитет у Београду, Рударско-геолошки факултет (2021)
-
Microorganism activity in mine soils of black locust (Robinia pseudoacacia L.) stands on copper mine wastes in Bor, Serbia
Ranđelović Dragana (2017)Ranđelović Dragana. "Microorganism activity in mine soils of black locust (Robinia pseudoacacia L.) stands on copper mine wastes in Bor, Serbia" in Proceedings of XXV International Conference on Ecological Truth, :Univerzitet u Beogradu, Tehnički fakultet u Boru (2017): 207-213
-
Application of MCDA in the determination of optimal block size for open-pit modelling and mine planning
The process of creating a geological block model as the basis for a further detailed design and planning of mining operations is a very responsible task. Errors made during this initial process are transferred to all other phases of the mining project. Certainly, one of the most important decisions for the modelling process is the choice of the appropriate size of the blocks that form the model itself. The determination of the optimal block size is not a simple ...dimenzije minibloka, višekriterijumska analiza, AHP, modeliranje ležišta, planiranje na površinskim kopovimaPetar Marković, Dejan Stevanović, Milica Pešić Georgiadis, Mirjana Banković. "Application of MCDA in the determination of optimal block size for open-pit modelling and mine planning" in Underground Mining Engineering, Univerzitet u Beogradu, Rudarsko-geološki fakultet (2021)
-
Characterization of mine soils formed on loose sediments from the copper mine overburden in Bor, Serbia
Ranđelović Dragana, Vulić Predrag, Cvetković Vladica. "Characterization of mine soils formed on loose sediments from the copper mine overburden in Bor, Serbia" in Изводи радова / XXI Конференција Српског кристалографског друштва, Ужице, 2014., Београд:Српско кристалографско друштво (2014): 54-54
-
Simulation of mine water inflow: case study of the Štavalj coal mine (southwestern Serbia)
Miladinović Branko, Ristić-Vakanjac Vesna, Bukumirović Dragomir, Dragišić Veselin, Vakanjac Boris (2015)Miladinović Branko, Ristić-Vakanjac Vesna, Bukumirović Dragomir, Dragišić Veselin, Vakanjac Boris. "Simulation of mine water inflow: case study of the Štavalj coal mine (southwestern Serbia)" in Archives of Mining Sciences, Polish Academy of Sciences, Committee of Mining 60 no. 4 (2015): 255-269. https://doi.org/10.1515/amsc-2015-0063
-
Conversion of land areas after coal mine closure and reclamation
Otkopavanje uglja površinski i podzemno praćeno je degradacijom zemljišta, promenom formiranja predela i izmenom flore i faune. Od velikog značaja je razvoj novih naučno utemeljenih pristupa obnovljanje antropogeno poremećenih predela zasnovanih na formiranju rekultivacionih i rudarskih tehnologija. Apsolutno je neophodno obezbediti sveobuhvatno kvalitetno očuvanje zemljišnih i vodnih resursa i odrediti rekultivisano zemljište za novu namenu. U ovom članku je dat pregled najpopularnijih metoda rekultivacije zemljišta i mogućnosti rekultivacije zemljišta nakon završetka rekultivacije i zatvaranja rudnika uglja.... . It is important to point out that the defined model can be used in all planning and exploitation phases of an open pit mine, regardless of whether it is a new mine or an open mine where exploitation is carried out. The iterative nature of the model enables corrective measures during the implementation ...
... operate in the coal mine rehabilitated land may get easier and faster because generally there is no public opposition and no competition with agricultural activities. Figure 3 shows Photovoltaic panels in Boortai Coal Mine in China (left) [11], solar plant in Klettwitz former open pit mine, Brandenburg ...
... Photovoltaic panels in Boortai Coal Mine in China (2022) on left side, solar plant in Klettwitz, Germany on right side One of the most prominent environmental engineering issues facing Drmno in recent years is the need to rehabilitate and reallocate a former coal open pit mine. Fortunately, new technologies ...Radmila Gaćina, Bojan Dimitrijević, Sanja Bajić. "Conversion of land areas after coal mine closure and reclamation" in 9th International conference mining and environmental protection MEP 23 Proceedings, Sokobanja, 24-27.05.2023., Belgrade : University of Belgrade - Faculty of mining and geology (2023)
-
Opencast Mine Field B Inner Dump Sanation as A Condition of Mine Field E Opening in RB Kolubara
Branko Petrović, Jelena Majstorović, Tomislav Šubaranović. "Opencast Mine Field B Inner Dump Sanation as A Condition of Mine Field E Opening in RB Kolubara" in 10th International Conference Coal 2021, Jugoslovenski komitet za površinsku eksploataciju (2021)
-
Improving efficiency of thermal power plants through mine coal quality planning and control
Главни циљ контроле квалитета угља у рудницима лигнита је снабдевање термоелектрана угљем чији квалитет мора да се креће унутар одређених квалитативних ограничења. Карактеристике угља могу да утичу на ефикасност, поузданост и расположивост како котла тако и јединица за контролу емисије. У овом раду аутори су презентовали интегрисану симулацију рударског процеса као нови приступ у истраживању променљивости калоричне вредности угља приликом експлоатације комплексног лежишта лигнита. Резултати таквог приступа омогућавају драгоцен увид у перформансе континуалног рударског система у смислу контроле променљивости ...Mirjana Banković, Dejan Stevanović, Milica Pešić, Aleksandra Tomašević, Ljiljana Kolonja. "Improving efficiency of thermal power plants through mine coal quality planning and control" in Thermal Science, Vinča Institute of Nuclear Sciences (2018). https://doi.org/10.2298/TSCI170605209B
-
Production information system of the Pljevlja coal mine
Božo Kolonja, Ranka Stanković, Filip Vuković . "Production information system of the Pljevlja coal mine" in Mine Planning and Equipment Selection 2000, Routledge (2018). https://doi.org/10.1201/9780203747124-154
-
Development of A Business Intelligence Tool For Accident Analysis in Mines
... of lexical relations is established between general and more specific terms, such as "coal mine", and "open pit", which is a specific type of coal mine, also with synonyms such as "opencast", "surface mine", and "quarry". One example of development of mining ontologies has been reported by Cheng ...
... and query for users in mine safety area. We have demonstrated various possibilities that the use of such a business intelligence tool open, supported by a practical example of application of the tool for accident analysis in mines that brings considerable benefits to the mine safety. Acknowledgements ...
... business intelligence, mine safety, accident analysis, online analytical processing (OLAP), mine accident (injury) 1. INTRODUCTION Mine safety is one of the key issues in mining industry, and it is safe to say that research in industrial safety in general originates from mine safety (Danihelka ...Ljiljana Kolonja, Ranka Stanković, Ivan Obradović, Olivera Kitanović, Uroš Pantelić. "Development of A Business Intelligence Tool For Accident Analysis in Mines" in Proceedings of the 5th International Symposium Mining And Environmental Protection, June 10-13, 2015, Vrdnik, Serbia, Belgrade : Faculty of Mining and Geology (2015)
-
Human factor risk management procedures applied in the case of open pit mine
Snežana Kirin, Aleksandar Sedmak, Wei Li, Miodrag Brzaković, Igor Miljanović, Ana Petrović, Simon Sedmak (2021)Risk management aims to provide a controlled work environment to ensure the safe operation of the high-risk systems. It is a dynamic process which work in a continual state of change. The issue of human factor risk and rules and regulations in open pit mine is a main focus of this paper in order to develop predictive models of behavior of workers in relation to compliance with the procedures and rules. Presented survey was conducted in open pit coal ...Snežana Kirin, Aleksandar Sedmak, Wei Li, Miodrag Brzaković, Igor Miljanović, Ana Petrović, Simon Sedmak. "Human factor risk management procedures applied in the case of open pit mine" in Engineering Failure Analysis (2021). https://doi.org/https://doi.org/10.1016/j.engfailanal.2021.105456
-
A transient three-dimensional numerical model of water impermeable screen effects on the groundwater inflow reduction into the mine (Case Study: Open pit mine Drmno, Serbia)
Šubaranović Tomislav, Polomčić Dušan, Pavlović Vladimir, Pakić N. "A transient three-dimensional numerical model of water impermeable screen effects on the groundwater inflow reduction into the mine (Case Study: Open pit mine Drmno, Serbia)" in Proceedings on CD-ROM [Elektronski izvor]. Vol. 1-2 / 11th International Conference Research and Development in Mechanical Industry - RaDMI 2011, 15-18. September 2011, Sokobanja, Serbia, Vrnjačka Banja:Scientific and Technical Center for Intellectual Property (2011): 1257-1265