Претрага
163 items
-
Application of Expansive Mortars for the Formation of Artificial Screens During Blasting in Urban Areas
During construction of buildings in urban areas, sometimes there is a need to blast solid rock mass in the immediate vicinity of the surrounding buildings. In that case, the aim is not only to increase the efficiency of blasting, but also to reduce harmful effects of ground vibration induced by blasting. At the same time, it is very important to protect the buildings located in the safe zone from the blast site as well as remaining rock mass around ...Milanka Negovanović, Lazar Kričak, Stefan Milanović, Nikola Simić, Jelena Majstorović. "Application of Expansive Mortars for the Formation of Artificial Screens During Blasting in Urban Areas" in 31st International Conference Ecological Truth & Environmental Research-EcoTER'24, Sokobanja, 18-21. jun 2024, Bor : Tehnički fakultet u Boru (2024)
-
Model for estimation of stress field in the earth's crust
Slavko Torbica, Veljko Lapčević (2016)Slavko Torbica, Veljko Lapčević. "Model for estimation of stress field in the earth's crust" in Podzemni radovi (2016). https://doi.org/10.5937/podrad1628009T
-
Application of Gel for Water Shutoff: A Case Study of Kelebija Oil Field
This paper focuses on the results of water shutoff operations using DSGA polymer gel in the Kelebija oil field. The methodology of candidate wells selection and the manner of performing the operation will also be included. The Kelebija oil field is characterized by a complex reservoir system with heterogeneous layers of different permeability and dual porosity, which led to the early breakthrough of water. For the last 25 years, average water cut was above 90%. Implementation of water shutoff ...intervención de pozos petroleros, reservoir characterization, production control, well logging, downhole intervention, enhanced recovery, complex reservoir, reservoir surveillance, water shut-off, upstream oil & gasIrina Zahirovic, Petar Skrobonja, Dušan Danilović. "Application of Gel for Water Shutoff: A Case Study of Kelebija Oil Field" in SPE Production & Operations, SPE (2022). https://doi.org/10.2118/209590-PA
-
Geomechnical research for the new bucket wheel excavator testing at Open pit “Filijala”
Since 1976 cement marl excavation at open-pit mine „Filijala” is carried out by continuous exploitation technology using bucket wheel excavator SH 400 manufactured by Orenstein und Koppel (O & K) company. Due to the bucket wheel excavator time-worn and high operating cost it was necessary to replace it with new one. In order to test the new bucket wheel excavator and prove its capacity a testing zone was defined as test block for excavation, in which the bucket wheel ...Vladimir Čebašek, Nebojša Gojković, Veljko Rupar, Miodrag Pribićević. "Geomechnical research for the new bucket wheel excavator testing at Open pit “Filijala”" in Рударски гласник, Рударски институт - Београд (2020). https://doi.org/10.25075/BM.2020.07
-
Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of “Podbracan”
... chambers; the opening, development and excavation concept After the haulage drift reaches the ore body, bench drift EH is constructed along the �oor part of ore body to the exit into the open pit, and to the oppo- site side till the deposit excavation limit. Bench drifts have multiple purposes: ...
... for the construction of exca- vation drifts and for the ore excavation, supplying fresh air, and as emergency exit from the pit. The adopted altitude difference between excavation levels is 10m, the same as the height of the benches at open pit, for the purpose of using the benches of the mine for ...
... the pre-project and project stage of mining, as well as during the construction of mining facilities and excavation of mineral resources. Speci�c features of the project concerning excavation of the remaining reserves of bauxite in the deposit of "Podbracan", and in this way the forthcoming mining ...Aleksandar Milutinović, Aleksandar Ganić, Thamer Rayes Diyab, Rade Tokalić, Meri Ganić. "Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of “Podbracan”" in Revista Escola de Minas, School of Mines Magazine, Sao paulo, Brasil : SciELO (2015)
-
Pre-failure deformation monitoring as rockfall prediction tool
... rockfall assessment by using Terrestrial Laser Scanning (TLS) in monitoring a road cut, hosted in flysch rock formation, near Ljig in Serbia. A sequence of rockfall events from 2013-2019 is presented, while the cut has been more broadly investigated in our earlier work. Beside occasional rockfalls ...
... the town of Ljig. It is a medium-sized rock slope, about 30 m high and 60 m long, with average slope of 60°, facing SSE (figure 1). It is a road cut engineered during 70’s due to re-routing of an earlier flood-prone road. Opening this rock face resulted in intensive weathering and deformations related ...
... slope. Rockfall volume and runout were considered as insignificant, and the slope is therefore, left unsupported and unprotected (figure 2). The cut seems to be composed of fresh rock, since their equivalents in the near- by tunnel, constructed in 2016-2019, were much more weathered and looser, with ...Miloš Marjanović, Biljana Abolmasov, Zoran Berisavljević, Marko Pejić, Petko Vranić. "Pre-failure deformation monitoring as rockfall prediction tool" in IOP Conference Series: Earth and Environmental Science, IOP Publishing (2021). https://doi.org/10.1088/1755-1315/833/1/012197
-
Determining the Availability of Continuous Systems at Open Pits Applying Fuzzy Logic
This work presents a model for determining the availability of continuous systems at open pits by applying fuzzy logic and fuzzy inference systems. The applied model was formed by the synthesis of independent partial indicators of availability. The model is based on an expert system for assessing the availability of continuous mining systems. The availability of the system, as a complex state parameter, is decomposed into the partial indicators, reliability, and convenience of maintenance, and the fuzzy compositions, used ...системи, континуални систем експоатације, површински коп, рударство, расположивост, фази логика, max–min композиција, min–max композицијаMiljan Gomilanović, Miloš Tanasijević, Saša Stepanović. "Determining the Availability of Continuous Systems at Open Pits Applying Fuzzy Logic" in Energies, MDPI AG (2022). https://doi.org/10.3390/en15186786
-
Reducing environmental impact caused by mining activities in limestone mines
Radmila Gaćina, Bojan Dimitrijević (2022)Mining and its related activities have always resulted in changes in the environment and these changes can vary from one area to another. As a result of mining, several types of changes can be distinguished: destruction of land and existing vegetation, changes in terrain topography, modification in air quality, changes in surface and groundwater quality, as well as change geotechnical conditions of the rock. Environmental impact of mining have been a public concern. There is widespread global interest in mining ...Radmila Gaćina, Bojan Dimitrijević. "Reducing environmental impact caused by mining activities in limestone mines" in Underground mining engineering , Belgrade : University of Belgrade - Faculty of Mining and Geology (2022)
-
Environmental Noise Impact Assessment for Large-Scale Surface Mining Operations in Serbia
Noise emissions are a significant environmental impact caused by the mining industry in all technological phases of surface mining, mineral processing, and waste disposal. This paper presents the role of noise impact assessment and control in large-scale surface mining operations. Mine planning develops the model of mining operations, ore excavation, and waste dumping scheduling and processing rates, including spatial distribution of mining activities. Such a level of mine planning requires an environmental impact assessment study. This can be achieved ...Uros Pantelic, Petar Lilic, Aleksandar Cvjetic, Nikola Lilic. "Environmental Noise Impact Assessment for Large-Scale Surface Mining Operations in Serbia" in Sustainability, MDPI AG (2023). https://doi.org/10.3390/su15031798
-
Speleo‐morphology and tectonic processes – What can be seen in slowly deforming regions?
Ana Mladenović, Jelena Ćalić (2022)There are a lot of methods used to determine tectonic process active in a region, and they vary depending on the purpose of the research. However, a number of them cannot be used in slowly deforming regions, because the effects of active tectonic process on the rocks in such regions could be negligible. This is especially true for the recently active tectonics in such regions, since most of the recently active tectonic structures never reach the surface. Because of ...Ana Mladenović, Jelena Ćalić. "Speleo‐morphology and tectonic processes – What can be seen in slowly deforming regions?" in 18th International Congress of Speleology, Savoie Mont Blanc, 24-31 July 2022, Postojna : International Union of Speleology (2022)
-
Application of stochastic models for mine planning and coal quality control
... the cut depth of the reclaimed. Now, the layers can be described by the matrix: X X X X X X X X X n n m m mn 11 12 1 21 22 2 1 2 � � � � � � � where m is the number of stocked layers, l – the length of the bed, and n = l/d. The volume of the material reclaimed from layer i in cut j is ...
... the range [(j—1)d, jd] where dis the cut depth of the reclaimed. Now, the layers can be described by the matrix: Xm Xm 0 *X where m is the number of stocked layers, / — the length of the bed, and n = //d. The volume of the material reclaimed from layer i in cut is denoted by v,,, The average grade of ...
... using the coal within the rectangle (fig. 4). The box cut is a planned start at the northern extreme of the area due to several technical operational reasons including an ade- quate location for the topsoil provisional deposit from the first cut. The area to be mined over the life of the mine was divided ...Dejan Stevanović, Božo Kolonja, Ranka Stanković, Dinko Knežević, Mirjana Banković. "Application of stochastic models for mine planning and coal quality control" in Thermal Science, Belgrade : Vinča Institute of Nuclear Sciences (2014). https://doi.org/10.2298/TSCI130201031S
-
Status and tendencies under development and application of underground coal gasification-UCG
Podzemna gasifikacija uglja u Svetu poslednjih decenija doživljava znatnu ekspanziju u istraživanju i razvoju zbog uveliko iskorišćenih ležišta uglja i loših ekoloških efekata (pri sagorevanju u TE) na životnu okolinu. Srbija ima znatne rezerve uglja, a kada bi se za PGU koristile samo vanbilansne rezerve i otkopni ostaci bilansnih, jasno je kakvi bi bili ekonomski (a i energetski i ekološki) efekti. U radu su sagledane aktivnosti u Svetu na tom planu, pa smatramo da ima smisla i potrebe za primenu ove ...David Petrović, Lazar Kričak, Stefan Milanović, Jovan Marković, Nikola Simić. "Status and tendencies under development and application of underground coal gasification-UCG" in International Conference “Energy and Ecology Industry EEI2018”, Beograd : Akademija inženjerskih nauka Srbije (AINS) (2018)
-
Probabilistic analysis of anisotropic rock slope with reinforcement measures
During the construction of E75 highway through Grdelica gorge in Serbia, a major failure occurred in the zone of reinforced rock slope. Excavation was performed in highly anisotropic Paleozoic schist rock formation. The reinforcement consisted of the two rows of micropile wall with pre-stressed anchors. Forces in anchors were monitored with load cells while benchmarks were installed for superficial displacement measurements. The aim of the study is to investigate possible causes of instability considering different probability distributions of the ...Zoran Berisavljević, Dušan Berisavljević, Miloš Marjanović, Svetlana Melentijević. "Probabilistic analysis of anisotropic rock slope with reinforcement measures" in Geomechanics and Engineering (2023). https://doi.org/10.12989/gae.2023.34.3.285
-
Geotehnički uslovi izgradnje metro stanice „Savski trg“ – beogradski metro linija 1
Ukrštanje linija 1 i 2 beogradskog metroa, planirano je na lokaciji “Savski trg” gde će se izgraditi zajednička metro stanica. Zbog složene konstrukcije objekta i različite dubine dijafragmi, koja na delu metro linije 2 iznosi preko 40 m, planirana je fazna izgradnja. U vezi sa tim u radu je prikazan način definisanja geotehničkog modela, kao i geotehnički proračuni u kojima su analizirani: fazni načini iskopa, filtraciona analiza, uticaj pornih i efektivnih napona na stabilnost dijafragme, horizontalna i vertikalna ...beogradski metro, metro stanica, geotehnički model, stabilnost dijafragme, horizontalna pomeranja, vertikalna pomeranjaDragoslav Rakić, Nemanja Stanić, Josip Išek, Slavoljub Stojković. "Geotehnički uslovi izgradnje metro stanice „Savski trg“ – beogradski metro linija 1" in Geotehnički aspekti građevinarstva i zemljotresno inženjerstvo – Vrnjačka Banja, 01-03. novembar 2023., Beograd : Savez građevinskih inženjere Srbije (2023)
-
Development and Application of Methodology for Quantification of Overbreaks in Hard Rock Tunnel Construction
A methodology for determining overbreaks in hard rock tunnel construction using the drill-and-blast technique is presented in this paper. The methodology was developed for and applied to crystalline medium- to thick-bedded limestone, but it can be used in any jointed hard rock mass. Overbreaks are inevitable in hard rock tunnelling in a low-confinement environment (shallow tunnels up to several hundred meters deep) as a result of wedge failures along unfavourably oriented discontinuities caused by blasting. It is widely accepted ...hard rock, drill-and-blast, geological overbreak, technological overbreak, stability criterion, discontinuity orientation, tunnel constructionZoran Berisavljević, Dragoljub Bajić, Vojkan Jovičić. "Development and Application of Methodology for Quantification of Overbreaks in Hard Rock Tunnel Construction" in Applied Sciences, MDPI (2023). https://doi.org/10.3390/app13031379
-
A Model for Determining the Dependability of Continuous Subsystems in Coal Mines Using the Fuzzy Logic Approach
Nikola Stanić, Miljan Gomilanović, Petar Marković, Daniel Krzanović, Aleksandar Doderović, Saša Stepanović (2024)This study presents a unique model for assessing the dependability of continuous parts of combined systems in open-pit mining through the application of fuzzy logic. Continuous sub-systems as part of the combined system of coal exploitation in surface mines have the basic function of ensuring safe operation, high capacity with high reliability, and low costs. These subsystems are usually part of the thermal power plant’s coal supply system and ensure stable fuel supply. The model integrates various independent partial ...fuzzy logic, max-min composition, continuous part of combined system (CCS), open pit, mining, dependabilityNikola Stanić, Miljan Gomilanović, Petar Marković, Daniel Krzanović, Aleksandar Doderović, Saša Stepanović. "A Model for Determining the Dependability of Continuous Subsystems in Coal Mines Using the Fuzzy Logic Approach" in Applied Sciences, Basel, August 2024, MDPI (2024). https://doi.org/https://doi.org/10.3390/app14177947
-
‘Blue-’ and ‘Brown-speckled’ pottery from Qalhât, the Sultanate of Oman (13–16th centuries): Comparison with traditional Omani 19–20 century productions
Representative ‘Blue speckled’ (13–16th centuries) and ‘Brown speckled’ (13–21st century) wares recovered from the excavations in Qalhât or collected around Bahlâ city (Sultanate of Oman) were characterized by XRPD, SEM-EDS, Raman/optical microspectroscopy, and thermal expansion. Minerals present in the body (quartz, augite and albite as major phases, calcite, dolomite, rutile, anatase, phosphate, hematite and magnetite as minor phases) were identified by XRPD and/or Raman spectroscopy. SEM-EDXS microanalysis was performed on the glazes in order to compare their composition, especially ...Liliana Gianni, Hélène Renel, Aleksandar Kremenović, Philippe Colomban. "‘Blue-’ and ‘Brown-speckled’ pottery from Qalhât, the Sultanate of Oman (13–16th centuries): Comparison with traditional Omani 19–20 century productions" in Boletín de la Sociedad Española de Cerámica y Vidrio, Elsevier BV (2020). https://doi.org/10.1016/j.bsecv.2020.06.005
-
Development of an integrated model for open-pit-mine discontinuous haulage system optimization
Miodrag Čelebić, Dragoljub Bajić, Sanja Bajić, Mirjana Banković, Duško Torbica, Aleksej Milošević , Dejan Stevanović (2024)Miodrag Čelebić, Dragoljub Bajić, Sanja Bajić, Mirjana Banković, Duško Torbica, Aleksej Milošević , Dejan Stevanović . "Development of an integrated model for open-pit-mine discontinuous haulage system optimization" in Sustainability, MDPI (2024). https://doi.org/10.3390/su16083156
-
Mikroelementi u kvartarnim sedimentima i lignitu Kostolačko-kovinskog ugljonosnog basena, istočna Srbija – odabrani primeri
Sadržaj, distribucija i način pojavljivanja elemenata u tragovima (mikroelemenata), posebno potencijalno toksičnih i radioaktivnih elemenata u uglju, su od velikog značaja, posebno ako se koriste kao gorivo u termoelektranama (TE). Na osnovu sistematski prikupljenih podataka o elementima u tragovima u uglju, zemljištu i sedimentima, moguće je utvrditi stepen zagađenosti vazduha, zemljišta, vode, kao i negativan uticaj na zdravlje ljudi. Eksploatacija i istraživanje lignita u Kostolcu i Kovinu traje više od jednog veka, dok se sagorevanje lignita sa površinskih kopa ...Bogoljub Vučković, Biljana Radovanović, Dragana Životić. "Mikroelementi u kvartarnim sedimentima i lignitu Kostolačko-kovinskog ugljonosnog basena, istočna Srbija – odabrani primeri" in 18. Kongres geologa Srbije "Geologija rešava probleme", Divčibare, 01-04 jun 2022., Srpsko geološko društvo (2022)
-
Model za optimizaciju graničnog saržaja metala u rudi u funkciji dugoročnog planiranja površinskih kopova
Daniel P. Kržanović (2016-06-14)Optimizacija graničnog sadržaja metala u rudi jedan je od osnovnih koraka u planiranju i dizajniranju površinskih kopova i ima za cilj postizanje maksimalne neto sadašnje vrednosti (NPV). Iz tog razloga, optimizacija graničnog sadržaja i danas je predmet mnogih istraživanja u rudarskoj nauci, sa ciljem rešavanja praktičnih problema u eksploataciji ležišta.Dugoročno planiranje eksploatacije na površinskim kopovima podrazumeva sagledavanje svih relevantih parametara i faktora (geologije rudnog ležišta, tehnologije proizvodnog procesa, kapaciteta otkopavanja i prerade, troškova, cena metala, iskorišćenja i dr) kako ...površinski kop, dugoročno planiranje, optimizacija graničnog sadržaja, maksimizacija neto sadašnje vrednosti (NPV).... MODEL FOR THE CUT OFF GRADE OPTIMIZATION IN THE FUNCTION OF LONG-TERM PLANNING OF THE OPEN PITS ABSTRACT Optimization the cut off grade of metal in the ore is one of the basic steps in planning and design of the open pit and is aimed to achieve maximum net present ...
... Design of an Open Pit Mine, Discrete Applied Mathematics, Vol. 21, pp. 1–19. Caccetta, L., Hill, S.P., 2003, An Application of Branch and Cut to Open Pit Mine Scheduling,. Journal of Global Optimization, vol. 27, pp. 349 – 365. Caccetta, L., Hill, S.P., 1999, Optimization Techniques For Open Pit Mine ...
... results of analysis show that the selective excavation of ore with the oxide copper content to maximum of 10%, and the ore with the oxide copper content greater than 10%, an increase in the value of NPV would be achieved for 24.77%, while optimizing the cut off grade of metal in the ore further increase ...Daniel P. Kržanović. "Model za optimizaciju graničnog saržaja metala u rudi u funkciji dugoročnog planiranja površinskih kopova" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2016-06-14)