Претрага
32 items
-
Application of the Fuzzy theory in the evaluation of operating parameters of auxiliary mechanization on open-cast coal mine, case study: pipelayers
Achieved operating parameters are the main indicator of the work quality and selection of mining machines. The effectiveness of a coal mine is correlated with the availability of basic and auxiliary machines. The main task of auxiliary machines in lignite mines is to achieve optimal working conditions. From an economic point of view, auxiliary machines generate up to 20% of the lignite mines' total costs. These are the primary reasons for analyzing their current work and making decisions in ...Stevan Djenadić, Miloš Tanasijević, Filip Miletić, Predrag Jovančić. "Application of the Fuzzy theory in the evaluation of operating parameters of auxiliary mechanization on open-cast coal mine, case study: pipelayers" in 8th Balkan Mining Congress, Belgrade, September 28-30, Rudarski instutut (2022)
-
Tektono-termalna evolucija kontakta Dinarida i Karpato-Balkanida u području Jastrepca
Dalibor Erak (2019)Predmet istraživanja doktorske disertacije je tektonska evolucija područja planine Jastrebac u centralnoj Srbiji, gde višefazna tektonska aktivnost od mezozoika do danas komplikuje rekonstrukciju strukturnih odnosa i geološke evolucije ovog prostora. Kompleksna višefazna evolucija planine Jastrebac u Srbiji je demonstrirana kombinovanjem kinematskih podataka prikupljenih na terenu i mikrostrukturnih opservacija sa dodatnim termohronološkim podacima “fission track” i podacima odredbe starosti metodom U-Pb na cirkonima. Gornjokredna ekshumacija bila je praćena gornjokredno-eocenskim navlačenjem i magmatizmom vezanim za kontinentalnu koliziju, pri čemu je akreciona ...Dalibor Erak. Tektono-termalna evolucija kontakta Dinarida i Karpato-Balkanida u području Jastrepca, Beograd : Rudarsko-geološki fakultet, 2019
-
Risk Evaluation: Brief Review and Innovation Model Based on Fuzzy Logic and MCDM
Stevan Djenadic, Milos Tanasijevic, Predrag Jovancic, Dragan Ignjatovic, Dejan Petrovic, Ugljesa Bugaric (2022)The risk assessment of engineering systems represents an important part of the quality of service and dependability. The existing methods for risk evaluation use crisp sets for rating partial indicators’ proposition and their cumulative products as an overall indicator. In this paper, existing FMEA and FMECA methods have been improved using the fuzzy expert system for calculating the risk priority number. The application of fuzzy logic allows the use of linguistic descriptions for risk analysis. In this way, the ...Stevan Djenadic, Milos Tanasijevic, Predrag Jovancic, Dragan Ignjatovic, Dejan Petrovic, Ugljesa Bugaric. "Risk Evaluation: Brief Review and Innovation Model Based on Fuzzy Logic and MCDM" in Mathematics, MDPI AG (2022). https://doi.org/10.3390/math10050811
-
Optimizacija faznog razvoja Površinskog kopa Ciganuša – Škorac u cilju definisanja dugoročne dinamike eksploatcije
Definisanje dugoročne dinamike razvoja rudarskih radova koja je u potpunosti usaglašena sa strateškim ciljevima Investitora, veoma je zahtevan zadatak, koji vrlo često podrazumeva veliki broj ograničenja. Adekvatno definisana dinamika razvoja rudarskih radova treba da obezbedi dugoročne zahteve u pogledu kapaciteta, kvaliteta i raspodele resursa neophodnih za ispunjavanje strateških ciljeva, koji se po pravilu svode na ostvarenje maksimalnog profita. Uspešno definisanje dinamike eksploatacije (posebno kod metaličnih ležišta) u najvećoj meri zavisi od optimizacije faznog razvoja površinskog kopa, odnosno od pravilnog ...Dejan Stevanović, Petar Marković, Mirjana Banković, Milan Živković. "Optimizacija faznog razvoja Površinskog kopa Ciganuša – Škorac u cilju definisanja dugoročne dinamike eksploatcije" in XV Međunarodna konferencija OMC 2022, Zlatibor, 12-15. oktobar 2022., Jugoslovenski komitet za površinsku eksploataciju (2022)
-
Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine
Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović (2019)Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availability is an overall indicator and contains partial indicators that are oriented towards reliability, maintenance, and logistical support. Availability presents a variable value and changes in time and space. Usually, availability is shown as the ...Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović. "Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine" in Energies, MDPI AG (2019). https://doi.org/10.3390/en12214044
-
Prioritization of strategic measures for strengthening the security of supply of the Serbian natural gas sector
To strengthen the security of supply of the Serbian gas sector, it is necessary to analyze the impact of planned strategic measures. The analysis involves the identification of the most influential threats to the security of natural gas supply and prioritization of the strategic measures for overcoming the consequences of threats. The proposed methodology is based on Fuzzy Analytic Hierarchy Process. The obtained weights for the identified threats and strategic measures are formed according to experts' judgments. The results ...Sigurnost snabdevanja, Donošenje odluka, Snabdevanje prirodnim gasom, Fazi AHP, Energetski indikatoriBoban Pavlović, Dejan Ivezić, Marija Živković. "Prioritization of strategic measures for strengthening the security of supply of the Serbian natural gas sector" in Energy Policy, Elsevier BV (2020). https://doi.org/10.1016/j.enpol.2020.111936
-
An Underground Mine Ore Pass System Optimization via Fuzzy 0–1 Linear Programming with Novel Torricelli–Simpson Ranking Function
rudna sipka, optimizacija, fazi linearno programiranje, trouglasti graf, Toričelijeva tačka, funkcija rangiranjaDževdet Halilović, Miloš Gligorić, Zoran Gligorić, Dragan Pamučar. "An Underground Mine Ore Pass System Optimization via Fuzzy 0–1 Linear Programming with Novel Torricelli–Simpson Ranking Function" in Mathematics (2023). https://doi.org/10.3390/math11132914
-
Методологија интегралне анализе сценарија енергетског развоја
Александар Маџаревић (2019)енергетска безбедност, сценарио развоја, фази логика, сигурност снабдевања, доступност, расположивост, природни гасАлександар Маџаревић. Методологија интегралне анализе сценарија енергетског развоја, Рударско-геолошки факултет, 2019
-
A Teamwork-Based Protocol for a Holistic Approach to Selecting a Sustainable Mine Dewatering Management Plan
znanje eksperta, podzemne vode, primenjena matematika, fazi optimizacija, strategija održivog upravljanja, holistički sistemDragoljub Bajić, Sanja Bajić, Jelena Trivan, Ljubica Figun, Jelena Milovanović. "A Teamwork-Based Protocol for a Holistic Approach to Selecting a Sustainable Mine Dewatering Management Plan" in Sustainability , MDPI (2024)
-
Determining the Availability of Continuous Systems at Open Pits Applying Fuzzy Logic
This work presents a model for determining the availability of continuous systems at open pits by applying fuzzy logic and fuzzy inference systems. The applied model was formed by the synthesis of independent partial indicators of availability. The model is based on an expert system for assessing the availability of continuous mining systems. The availability of the system, as a complex state parameter, is decomposed into the partial indicators, reliability, and convenience of maintenance, and the fuzzy compositions, used ...системи, континуални систем експоатације, површински коп, рударство, расположивост, фази логика, max–min композиција, min–max композицијаMiljan Gomilanović, Miloš Tanasijević, Saša Stepanović. "Determining the Availability of Continuous Systems at Open Pits Applying Fuzzy Logic" in Energies, MDPI AG (2022). https://doi.org/10.3390/en15186786
-
Развој модела употребног квалитета помоћне механизације на површинским коповима лигнита
Драгица Јагодић Крунић (2021)Тренутно стање помоћне механизације на површинским коповима лигнита је незадовољавајуће узроковано пре свега старошћу и неблаговременом заменом машима услед чега је расположивост недовољна а трошкови експлоатације и одржавања високи. Тренутно стање и захтеви који се постављају пред ове машине указују на неопходност оптимизације процеса управљања помоћном механизацијом. Одређивање оптималног времена замене и преосталих могућности је најодговорнији управљачки задатак који треба да буде заснован на свеобухватном сагледавању економских, техничких и других узрочно последичних веза. Са економског аспекта гледано треба одржавати ...помоћна механизација, употребни квалитет, ефективност, расположивост, сигурност функционисања, ризик, трошкови животног циклуса, фази логика, Монте Карло методаДрагица Јагодић Крунић. Развој модела употребног квалитета помоћне механизације на површинским коповима лигнита, Београд : [Д. Јагодић Крунић], 2021
-
A Model for Determining Fuzzy Evaluations of Partial Indicators of Availability for High-Capacity Continuous Systems at Coal Open Pits Using a Neuro-Fuzzy Inference System
This paper presents a model for determining fuzzy evaluations of partial indicators of the availability of continuous systems at coal open pits using a neuro-fuzzy inference system. The system itself is a combination of fuzzy logic and artificial neural networks. The system availability is divided into partial indicators. By combining the fuzzy logic and artificial neural networks, a model is obtained that has the ability to learn and uses expert judgment for that learning. This paper deals with the ...системи, континуални системи експлоатације (роторни багер-транспортер-дробилично постројење), рударство, расположивост, меко рачунарство, фази логика, ANN, ANFISMiljan Gomilanović, Miloš Tanasijević, Saša Stepanović, Filip Miletić. "A Model for Determining Fuzzy Evaluations of Partial Indicators of Availability for High-Capacity Continuous Systems at Coal Open Pits Using a Neuro-Fuzzy Inference System" in Energies, MDPI AG (2023). https://doi.org/10.3390/en16072958