Претрага
462 items
-
Overwiew of In-Pit Crushing & Conveying Technology in Open Pit Mines
The conditions under which contemporary surface mining operations is carried out obviously becoming increasingly complex. In such complex conditions, the optimization of haulage systems as the technological phase with the largest share in the total operating costs, is very important from the aspect of achieving profitability of the mining project. In a large number of cases, the application of traditional haulage systems with trucks (as the most dominant type of haulage in open pit mines) does not lead to ...Ali Nasirinezhad, Dejan Stevanović, Dragan Ignjatović, Petar Marković. "Overwiew of In-Pit Crushing & Conveying Technology in Open Pit Mines" in 8th International Conference MIining And Environmental Protection, Sokobanja, 22-25 September 2021, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2021)
-
Primary crusher site selection in open pit mines - case study in Sungun copper mine
Facility site selection, (such as Primary or in pit Crusher location) is one of the most important steps in mine de-sign process that has a significant impact on economy of the mining operation. This study covers an attempt to find the optimal location forprimary crusher in order to support the expansion of Sungun copper mine, which is the second largest open pit mine in Iran. Recent exploration drilling has led to a considerable increase in the ore reserve. Therefore, ...Ali Nasirinezhad, Dejan Stevanović, Dragan Ignjatović, Mehdi Rahmanpou. "Primary crusher site selection in open pit mines - case study in Sungun copper mine" in Underground mining engineering, Универзитет у Београду, Рударско-геолошки факултет (2021)
-
Attenuation of Bacteriological Contaminants in Karstic Siphons and Relative Barrier Purifiers: Case Examples from Carpathian Karst in Serbia
L. Vasić, Z. Stevanović, S. Milanović, B. Petrović. "Attenuation of Bacteriological Contaminants in Karstic Siphons and Relative Barrier Purifiers: Case Examples from Carpathian Karst in Serbia" in Hydrogeological and Environmental Investigations in Karst Systems, Springer Berlin Heidelberg (2015). https://doi.org/10.1007/978-3-642-17435-3_51
-
Definition of groundwater genesis and circulation conditions of the complex hydrogeological karst system Mlava–Belosavac–Belosavac-2 (eastern Serbia)
Ljiljana Vasić, Saša Milanović, Zoran Stevanović, Laszlo Palcsu. "Definition of groundwater genesis and circulation conditions of the complex hydrogeological karst system Mlava–Belosavac–Belosavac-2 (eastern Serbia)" in Carbonates and Evaporites, Springer Science and Business Media LLC (2020). https://doi.org/10.1007/s13146-020-00550-3
-
Просторна анализа епикарста у оквиру карстног система источног дела Суве планине
Епикарст представља највиши део стенске масе који је изложен карстификацији, при чему су главне карактеристике епикарста акумулирање подземне воде и стварање услова за формирање концентрисаних токова у подини ове зоне. У досадашњој пракси истраживања епикарста углавном су коришћене индиректне методе: даљинска детекција, анализа хидрограма карстних врела, хидрохемијске и изотопске анализе, па чак и опити трасирања, док је са друге стране јако мали број истраживача изучавао епикарст директним теренским истраживањима. У раду je приказана иновирана методологија истраживања епикарста, која користи ...Бранислав Петровић, Зоран Стевановић, Вељко Мариновић, Снежана Игњатовић. "Просторна анализа епикарста у оквиру карстног система источног дела Суве планине" in XVI српски симпозијум о хидрогеологији са међународним учешћем, Универзитет у Београду, Рударско-геолошки факултет (2022)
-
Optimizacija faznog razvoja Površinskog kopa Ciganuša – Škorac u cilju definisanja dugoročne dinamike eksploatcije
Definisanje dugoročne dinamike razvoja rudarskih radova koja je u potpunosti usaglašena sa strateškim ciljevima Investitora, veoma je zahtevan zadatak, koji vrlo često podrazumeva veliki broj ograničenja. Adekvatno definisana dinamika razvoja rudarskih radova treba da obezbedi dugoročne zahteve u pogledu kapaciteta, kvaliteta i raspodele resursa neophodnih za ispunjavanje strateških ciljeva, koji se po pravilu svode na ostvarenje maksimalnog profita. Uspešno definisanje dinamike eksploatacije (posebno kod metaličnih ležišta) u najvećoj meri zavisi od optimizacije faznog razvoja površinskog kopa, odnosno od pravilnog ...Dejan Stevanović, Petar Marković, Mirjana Banković, Milan Živković. "Optimizacija faznog razvoja Površinskog kopa Ciganuša – Škorac u cilju definisanja dugoročne dinamike eksploatcije" in XV Međunarodna konferencija OMC 2022, Zlatibor, 12-15. oktobar 2022., Jugoslovenski komitet za površinsku eksploataciju (2022)
-
Приказ коморно-стубне методе откопавања са подетажним откопавањем стубова и накнадним засипавањем откопа
Милош Вуковић (2024)Коморно-стубна метода откопавања са подетажним откопавањем стубова се користи за рудне жиле и сочива, стрмог пада.У овом раду су приказани основни елементи примењене методе откопавања као што су: димензионисање просторија припреме, бушачко-минерски радови,утовар и транспорт,вентилација и запуњавање откопаног простора паста засипом. Анализом трошкова прорачуната је цена израде припремних просторија, по дужном метру, на основу квалитета радне средине у којима се израђују. Такође, анализирани су трошкови при експлоатацији руде и приказани су јединичном вредношћу USD/t (долара по тони руде).На крају ...... стубова и накнадним засипавањем откопа Милош Вуковић Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Приказ коморно-стубне методе откопавања са подетажним откопавањем стубова и накнадним засипавањем откопа | Милош Вуковић | | 2024 | | http://dr.rgf.bg.ac ...Милош Вуковић. Приказ коморно-стубне методе откопавања са подетажним откопавањем стубова и накнадним засипавањем откопа, 2024
-
Fuzzy Model for Risk Assessment of Machinery Failures
The main goal of this research was the development of an algorithm for the implementation of negative risk parameters in a synthesis model for a risk level assessment for a specific machine used in the mining industry. Fuzzy sets and fuzzy logic theory, in combination with statistical methods, were applied to analyze the time picture state of the observed machine. Fuzzy logic is presented through fuzzy proposition and a fuzzy composition module. Using these tools, the symmetric position of the ...... Machinery Failures Dejan V. Petrović, Miloš Tanasijević, Saša Stojadinović, Jelena Ivaz, Pavle Stojković Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Fuzzy Model for Risk Assessment of Machinery Failures | Dejan V. Petrović, Miloš Tanasijević, Saša Stojadinović ...
... Repository is available at: www.dr.rgf.bg.ac.rs symmetryS S Article Fuzzy Model for Risk Assessment of Machinery Failures Dejan V. Petrović 1,* , Miloš Tanasijević 2 , Saša Stojadinović 1, Jelena Ivaz 1 and Pavle Stojković 1 1 Technical Faculty in Bor, University of Belgrade, VJ 12, 19210 Bor, ...Dejan V. Petrović, Miloš Tanasijević, Saša Stojadinović, Jelena Ivaz, Pavle Stojković. "Fuzzy Model for Risk Assessment of Machinery Failures" in Symmetry, MDPI AG (2020). https://doi.org/10.3390/sym12040525
-
Prevent Leakage and Mixture of Karst Groundwater
Milanović Saša, Dragišić Veselin, Radulović Milan M., Stevanović Zoran. "Prevent Leakage and Mixture of Karst Groundwater" in Karst Aquifers – Characterization and Engineering (Stevanović Z. ed), Series: Professional Practice in Earth Science, :Springer International Publishing (2015): 531-600. https://doi.org/10.1007/978-3-319-12850-4_16
-
Modeling and Monitoring of Karst System as a Base for its Evaluation and Utilization - a Case Study from Eastern Serbia
Milanović Saša, Stevanović Zoran, Vasić Ljiljana, Ristić-Vakanjac Vesna. "Modeling and Monitoring of Karst System as a Base for its Evaluation and Utilization - a Case Study from Eastern Serbia" in Proceedings of the 9th Conference on Limestone Hydrogeology, Besancon, France, September 1-3, 2011, Besancon:UMR 6249 Chrono-Environment (2011): 351-354
-
An example of application of stochastic model to forecasting karst springs discharge
Ristić-Vakanjac Vesna, Stevanović Zoran, Milanović Saša, Vasić Ljiljana. "An example of application of stochastic model to forecasting karst springs discharge" in Proceedings of EGU 2012, 22-27.04. Vienna, Vienna: (2012)
-
Upravljanje rizicima u zaštiti objekata geonasleđa Srbije
Maran Stevanović Aleksandra, Ganić Meri, Rundić Ljupko, Milovanović Dragan. "Upravljanje rizicima u zaštiti objekata geonasleđa Srbije" in Zapisnici Srpskog geološkog društva (jubilarna sveska) no. za 2016. godinu, Beograd:Srpsko geološko društvo (2016): 111-136
-
3D modeling and monitoring of karst system as a base for its evaluation and utilization: a case study from eastern Serbia
Milanović Saša, Stevanović Zoran, Vasić Ljiljana, Ristić-Vakanjac Vesna. "3D modeling and monitoring of karst system as a base for its evaluation and utilization: a case study from eastern Serbia" in Environmental Earth Sciences 71 no. 2, Berlin, Heidelberg:Springer (2014): 525-532. https://doi.org/10.1007/s12665-013-2591-9
-
Application of MCDA in the determination of optimal block size for open-pit modelling and mine planning
The process of creating a geological block model as the basis for a further detailed design and planning of mining operations is a very responsible task. Errors made during this initial process are transferred to all other phases of the mining project. Certainly, one of the most important decisions for the modelling process is the choice of the appropriate size of the blocks that form the model itself. The determination of the optimal block size is not a simple ...dimenzije minibloka, višekriterijumska analiza, AHP, modeliranje ležišta, planiranje na površinskim kopovimaPetar Marković, Dejan Stevanović, Milica Pešić Georgiadis, Mirjana Banković. "Application of MCDA in the determination of optimal block size for open-pit modelling and mine planning" in Underground Mining Engineering, Univerzitet u Beogradu, Rudarsko-geološki fakultet (2021)
-
Approach to operational mine planning: Case study Tamnava West
... Case study Tamnava West Dejan Stevanović, Mirjana Banković, Milica Pešić Georgiadis, Ranka Stanković Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Approach to operational mine planning: Case study Tamnava West | Dejan Stevanović, Mirjana Banković, Milica Pešić ...
... publications. - The Repository is available at: www.dr.rgf.bg.ac.rs Approach to operational mine planning: Case study Tamnava West Dejan R. Stevanović, Univerzitet u Beogradu, Rudarsko-geološki fakultet, Beograd Mirjana Banković, Univerzitet u Beogradu, Rudarsko-geološki fakultet, Beograd Milica ...
... of in situ data, and to conduct quality operational planning. The importance of operational planning for coal quality control is stressed by Stevanović et. al. 7. Also due to the complex nature of coal operational planning, usage of specialized commercial software is necessity. 2. CASE ...Dejan Stevanović, Mirjana Banković, Milica Pešić Georgiadis, Ranka Stanković. "Approach to operational mine planning: Case study Tamnava West" in Tehnika, Beograd : Savez inženjera i tehničara Srbije (2014). https://doi.org/10.5937/tehnika1406952S
-
3D modeling and monitoring of karst system as a base for its evaluation and utilization: a case study from eastern Serbia
Earth-Surface Processes, Geology, Pollution, Soil Science, Water Science and Technology, Environmental Chemistry, Global and Planetary ChangeSaša Milanović, Zoran Stevanović, Ljiljana Vasić, Vesna Ristić-Vakanjac. "3D modeling and monitoring of karst system as a base for its evaluation and utilization: a case study from eastern Serbia" in Environmental Earth Sciences, Springer Science and Business Media LLC (2013). https://doi.org/10.1007/s12665-013-2591-9
-
Centar za hidrogeologiju karsta - 15 godina nauke i struke
... razvoju prosvete i nauke u Srbiji (Mijatović, 1997; Stevanović, 2000, 2012). Najznačajniji doprinos Cvijić Jje dao teoriji cirkulacije vode i funkciji karstne izdani (Mijatović, 1989, 1997; Milanović 1979; Stevanović i Mijatović, 2005; Stevanović i Milanović, 2013). Cvijić (1918) je opisao i sopstvenu ...
... sciences in Serbia (Mijatović, 1997; Stevanović, 2000, 2012). Cvijić made the most significant contribution to the theory of water circulation and the function of karst aquifer (Mijatović, 1989, 1997: Milanović 1979; Stevanović & Mijatović, 2005; Stevanović & Milanović, 2013). Cvijić (1918) also ...
... 194497804 Stevanović, Z., Polomčić, D., Milanović, S., Dokmanović, P. (2012): Water supplay management measures, CCWatersS - Climate Change and Impact on Water Suppbly., Edt. Stevanović Z., Ristić Vakanjac V., Milanović S.Univerzitet u Beogradu, RGF – DHG, Beograd pp. 341 – 390. Stevanović, Z., Ristić ...urednici Saša Milanović, Ljiljana Vasić, Zoran Stevanović, Branislav Petrović. Centar za hidrogeologiju karsta - 15 godina nauke i struke, Beograd : Univerzitet u Beogradu, Rudarsko-geološki fakultet, Centar za hidrogeologiju karsta, 2023
-
A fuzzy-based decision support model for effectiveness evaluation - a case study of examination of bulldozers
Effectiveness evaluation is one of the basic components of engineering asset management and maintenance engineering in general. Effectiveness is an overall concept representing a measurement of quality of service level for the analyzed engineering system. This concept contains a series of partial indicators relating to time in operation and time for maintenance activities, as well as functional properties of the system. This article describes the analysis and structuring of partial indicators, as well as the development of a model ...Miloš Tanasijević, Predrag Jovančić, Dejan Ivezić, Uglješa Bugarić, Radiša Đurić. "A fuzzy-based decision support model for effectiveness evaluation - a case study of examination of bulldozers" in International Journal of Industrial Engineering: Theory, Applications and Practice (2019)
-
Application of VIКOR method in the selection of an optimal splution of excavation “Borska Reka” ore deposit
Sanja Bajić, Dragoljub Bajić, Branko Glušćević, Radmila Gaćina. "Application of VIКOR method in the selection of an optimal splution of excavation “Borska Reka” ore deposit" in 9th International Conference Mining and Environmental protection MEP, 24 – 27 May 2023, Sokobanja, Serbia , Belgrade : University of Belgrade-Faculty of mining and geology (2023)
-
Serbian Society of Geomorphologists
Dragana Đurić, Jelena Ćalić (2019)Dragana Đurić, Jelena Ćalić. "Serbian Society of Geomorphologists" in GeomorForum 2019: Landforms related to plains of Serbia and its neighboring area, Conference Programme and Abstracts, Beograd, 10-12. maj 2019, Serbian Society of Geomorphologists (2019)