Претрага
9 items
-
Geotechnical zoning of the terrain along the first section of E-80 highway in Serbia – SEETO route 7
Part of E-80 highway that passes through Serbia (from the city of Nis to the administrative border Merdare) is 77 km long. The highway is divided into two sections: the first from Nis to Plocnik (39.4 km long) and the second from Plocnik to the administrative border with Kosovo. The route is designed through a typical plain and hilly terrain in which different geological units are dominant: crystalline schists, neogene sediments of foothills and quaternary sediments in the valley ...Dragoslav Rakić, Zoran Berisavljević, Irena Basarić, Snežana Bogdanović, Jovana Janković. "Geotechnical zoning of the terrain along the first section of E-80 highway in Serbia – SEETO route 7" in Proceedings of the XVII European Conference of Soil Mechanics and Geotechnical Engineering ECSMGE-2019, Reykjavik, Iceland, 1-6. 09. 2019., ISSMGE, ECSMGE-2019 (2019). https://doi.org/10.32075/17ECSMGE-2019-0393
-
Pre-failure deformation monitoring as rockfall prediction tool
Miloš Marjanović, Biljana Abolmasov, Zoran Berisavljević, Marko Pejić, Petko Vranić. "Pre-failure deformation monitoring as rockfall prediction tool" in IOP Conference Series: Earth and Environmental Science, IOP Publishing (2021). https://doi.org/10.1088/1755-1315/833/1/012197
-
Stabilnost kosina u stenskoj masi - savremeni koncepti i metode proračuna
Zoran Berisavljević, Dušan Berisavljević, Miloš Marjanović. Stabilnost kosina u stenskoj masi - savremeni koncepti i metode proračuna, Beograd : Univerzitet u Beogradu - Rudarsko-geološki fakultet, 2021
-
Definisanje parametara čvrstoće na smicanje kod izvođenja kosina u ispucalom stenskom masivu
Zoran M. Berisavljević (2016-04-01)Definisanje parametara čvrstoće na smicanje ispucalih stenskih masa predstavlja jedanod najzahtevnijih zadataka mehanike stena. Geotehnička istraživanja su uglavnomograničena na rezultate laboratorijskih ispitivanja malih makroskopski homogenihuzoraka, sa kojih se vrši ekstrapolacija rezultata na terensku razmeru. Ispitivanja semogu vršiti in situ, ali su i ona ograničena veličinom korišćene aparature imikrolokacijom na kojoj se vrše ispitivanja. Pored toga, moguće je vršiti različitaispitivanja na fizičkim modelima, koja su veoma složena i skupa. Ekstrapolacijapodataka sa malog uzorka na terensku razmeru daje mnogo bolje rezultate ...naponsko stanje, ispucalost, heterogenost, čvrstoća na smicanje, geološki indeksčvrstoće, Hoek-Brownov materijal, kompozitni uzorci, dezintegracija, povratna analizaZoran M. Berisavljević. "Definisanje parametara čvrstoće na smicanje kod izvođenja kosina u ispucalom stenskom masivu" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2016-04-01)
-
Geotehnički aspekti izgradnje visećeg pešačkog mosta u Starom gradu u Užicu
U radu su prikazani rezultati geotehničkih istraživanja za potrebe izgradnje visećeg pešačkog mosta preko klisure reke Đetinje u Užicu. Predviđeno je da most, sistema prednapregnute trake, omogući prelaz pešacima sa desne dolinske strane na stranu Starog grada, koja je opasana strmom liticom (cca. 40 m visine). Za potrebe formiranja geotehničkog modela i strukturnog sklopa krečnjačke stenske mase korišćen je postupak fotogrametrijskog snimanja dronom. Predviđeno je da se zatežuća sila (od oko 30 MN), koju most prenosi na obalni stub, ...fotogrametrija, stabilnost kosina, pukotine, prednapregnuta sidra, test granične nosivosti, paker (Ližonov) testZoran Berisavljević, Miloš Marjanović, Uroš Đurić. "Geotehnički aspekti izgradnje visećeg pešačkog mosta u Starom gradu u Užicu" in Zbornik radova / Međunarodno naučno-stručno savetovanje Geotehnički aspekti građevinarstva i zemljotresno inženjerstvo, Vrnjačka banja, 1-3. novembar 2023., Beograd : Savez građevinskih inženjera Srbije (2023.)
-
Development and Application of Methodology for Quantification of Overbreaks in Hard Rock Tunnel Construction
A methodology for determining overbreaks in hard rock tunnel construction using the drill-and-blast technique is presented in this paper. The methodology was developed for and applied to crystalline medium- to thick-bedded limestone, but it can be used in any jointed hard rock mass. Overbreaks are inevitable in hard rock tunnelling in a low-confinement environment (shallow tunnels up to several hundred meters deep) as a result of wedge failures along unfavourably oriented discontinuities caused by blasting. It is widely accepted ...hard rock, drill-and-blast, geological overbreak, technological overbreak, stability criterion, discontinuity orientation, tunnel constructionZoran Berisavljević, Dragoljub Bajić, Vojkan Jovičić. "Development and Application of Methodology for Quantification of Overbreaks in Hard Rock Tunnel Construction" in Applied Sciences, MDPI (2023). https://doi.org/10.3390/app13031379
-
Probabilistic analysis of anisotropic rock slope with reinforcement measures
During the construction of E75 highway through Grdelica gorge in Serbia, a major failure occurred in the zone of reinforced rock slope. Excavation was performed in highly anisotropic Paleozoic schist rock formation. The reinforcement consisted of the two rows of micropile wall with pre-stressed anchors. Forces in anchors were monitored with load cells while benchmarks were installed for superficial displacement measurements. The aim of the study is to investigate possible causes of instability considering different probability distributions of the ...Zoran Berisavljević, Dušan Berisavljević, Miloš Marjanović, Svetlana Melentijević. "Probabilistic analysis of anisotropic rock slope with reinforcement measures" in Geomechanics and Engineering (2023). https://doi.org/10.12989/gae.2023.34.3.285
-
The shear strength evaluation of rough and infilled joints and its indications for stability of rock cutting in schist rock mass
Construction of E75 highway section through Grdelica gorge was one of the most demanding projects realized in recent Serbian history. The alignment approximately 25 km long consists of several tens of bridges, two tunnels, three galleries and cuts with total length of 6 km. The alignment passes through highly anisotropic Palaeozoic schist rock formation of different weathering grades. This study focuses on shear strength properties of discontinuities, which are found to be the critical feature contributing to the occurrence ...Dušan Berisavljević, Zoran Berisavljević, Svetlana Melentijević. "The shear strength evaluation of rough and infilled joints and its indications for stability of rock cutting in schist rock mass" in Bulletin of engineering geology and the environment, Springer (2022). https://doi.org/10.1007/s10064-022-02580-8
-
Rock slope stability analysis under Hoek–Brown failure criterion with different flow rules
The stability analysis of homogeneous rock slope following the Hoek–Brown failure criterion under the hypothesis of different flow rules is performed based on limit equilibrium and finite element methods. The applied failure criterion is the generalized Hoek–Brown that can be introduced as a shear/normal function in analysis applying different flow rules. The results are compared with those obtained by the application of equivalent shear strength parameters of the Mohr–Coulomb criterion, considering that this is still the most widely used ...Kružna klizna površ, Huk-Braunov kriterijum loma, Kriterijum popuštanja, Smičuća/normalna funkcija, Nivo napona, Verovatnoća i parametarska analizaSvetlana Melentijević, Zoran Berisavljević, Dušan Berisavljević, Claudio Olalla Marañón . "Rock slope stability analysis under Hoek–Brown failure criterion with different flow rules" in Bulletin of Engineering Geology and the Environment , Springer (2024). https://doi.org/10.1007/s10064-024-03667-0